This is a Statement of Work (SOW) for crane services to remove an MK-38 MOD 3 Machine Gun System from the USCGC WARREN DEYAMPERT at USCG Base Boston, 427 Commercial Street, Boston, MA 02109, prior to the vessel's scheduled dry dock availability. The gun mount has estimated dimensions of 6 feet by 4 feet by 6 feet and weighs approximately 3,000 pounds. The work is expected to be completed within a single four-hour block from 0800 to 1200 hours, with the specific start time confirmed by the Government Contracting Officer's Representative (COR) no later than 24 hours prior to execution. The period of performance is 26 March 2026.
The contractor must provide a hydraulic mobile crane with sufficient lifting capacity and boom length, all necessary fuel and lubricants, certified rigging equipment (slings, shackles, spreader bars), and safety equipment including outrigger pads. Personnel requirements include a certified and licensed crane operator and a qualified rigger/signalperson, both possessing current OSHA 10 certification or higher and appropriate Personal Protective Equipment. All labor must comply with Prevailing Wage requirements. The contractor shall maintain and provide proof of General Liability, Workmen's Compensation, Employers Liability, Comprehensive General Auto, Pollution Liability, and Excess/Umbrella Insurance, along with project work logs, safety logs, and current crane/rigging certifications. The government will provide a lift plan specifying certified lifting points and will conduct a pre-lift safety brief. The Contracting Officer's Representative is CWO Duane Curtis, phone 857-416-3357, email duane.w.curtis@uscg.mil.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Crane Services for USCGC WARREN DEYAMPERT Gun Mount Removal
1. Background
USCGC WARREN DEYAMPERT is scheduled for an upcoming dry dock availability. To ensure the integrity of the main gun mount and prevent damage during shipyard operations, it is mandatory that the mount be removed prior to the vessel’s transit to the dry dock facility. This SOW outlines the requirements for a qualified contractor to provide a land-based crane and all associated services to facilitate this removal.
2. References
3. Period of Performance
Date: 26 March 2026
4. Place of Performance
USCGC WARREN DEYAMPERT
USCG Base Boston 427 Commercial Street Boston, MA 02109
5. Scope of Requirements
The contractor shall provide all required personnel, equipment, materials, and supervision necessary to perform the gun mount lift as detailed below.
5.1 Government-Furnished Information
Load Details: The gun mount to be removed has the following estimated characteristics.
Load: MK-38 MOD 3 Machine Gun System
Estimated Dimensions: 6ftx4ftx6ft
Estimated Total Weight: Approximately 3,000
Lifting Plan: A government-provided technical manual or lift plan specifying certified lifting points will be made available.
5.2 Contractor-Furnished Equipment (CFE)
The contractor shall provide equipment with capabilities equal to or exceeding the following specifications:
5.2.1 Crane: A hydraulic mobile crane with sufficient lifting capacity, boom length, and reach to safely lift the specified load from its position on the vessel's deck and place it onto a designated pier-side location or transport vehicle.
5.2.2 Ancillary Items:
All necessary fuel and lubricants for contractor-provided equipment.
All necessary and certified rigging (e.g., slings, shackles, spreader bars) appropriate for the load's weight and configuration.
All required safety equipment, including outrigger pads, to ensure a stable and secure crane setup on the pier.
5.3 Contractor Personnel Requirements
The contractor shall provide a crew including, at a minimum:
A certified and licensed Crane Operator.
A qualified Rigger/Signalperson.
All contractor personnel shall possess current OSHA 10 certification (or higher) and wear appropriate Personal Protective Equipment (PPE) for the task. All labor shall adhere to Prevailing Wage requirements.
5.4 Insurance & Documentation
The contractor shall maintain and provide proof of the following upon request:
4.4.1 Insurance: General Liability, Workmen’s Compensation, Employers Liability, Comprehensive General Auto, Pollution Liability, and adequate Excess/Umbrella Insurance.
4.4.2 Logs & Certifications: The contractor shall maintain and provide project Work Logs, Safety Logs, and current Crane/Rigging certification records to the Contracting Officer's Representative (COR).
6. Delineation of Responsibilities
5.1 Government Lead: A designated Government Representative (EO or COR) will serve as the lead for the overall evolution. A pre-lift brief and safety plan review will be conducted with the contractor's crew prior to commencing work.
5.2 Preparation Team: Ship's force will be responsible for preparing the gun mount for removal (e.g., disconnecting power, removing ammunition, ensuring clear access).
5.3 Contractor Responsibility: The contractor is solely responsible for the safe setup and operation of the crane and the execution of the lift as directed by the government lead. This includes maneuvering the load from the vessel to the designated landing area on the pier.
7. Hours of Performance
The work is expected to be completed within one four-hour block (0800-1200). The specific start time will be confirmed by the Government COR no later than 24 hours prior.
8. Point of Contact
Contracting Officer Representative (COR): CWO Duane Curtis Phone: 857-416-3357 Email: duane.w.curtis@uscg.mil