SOW - Metes and Bounds.pdf
PDF 168 KB Posted
- Attached to
- Metes and Bounds Survey - Goodfellow AFB
- Solicitation number
- FA303024Q0051
About this file
This document is a Scope of Work (SOW) for a Metes and Bounds Survey at Goodfellow Air Force Base (AFB) in Texas. The Government is considering an adjustment to a land proposal and requires a Metes and Bounds Survey for a real estate instrument. The contracted surveyor will be responsible for conducting the entire survey process, including initial setup, research, field work, monumentation, field notes, plat preparation, review, approval, notices, mobilization, travel, and providing final legal metes and bounds documents sealed by a licensed Texas surveyor. The period of performance is 90 calendar days from the Notice to Proceed. There are no toilet facilities available for the contractor's use. The related federal contract opportunity is Solicitation Number FA303024Q0051 for a Metes and Bounds Survey at Goodfellow AFB, with a Firm Fixed-Price award to the most advantageous responsible offeror. The acquisition is set aside for 100% Small Business.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA303024Q0051.pdf | ||
| DBA - Wage Determination.pdf | ||
| TE-1 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
METES AND BOUNDS
SURVEY FOR FAC 11945
SCOPE OF WORK
Goodfellow AFB, Texas
GSA Contract
1. BACKGROUND: An adjustment to a land proposal is being considered the Government and a third-party. A Metes and Bounds Survey is required for the real estate instrument.
2. RESPONSIBILITIES/SCOPE OF WORK:
a. Government: Shall provide funding, specific project requirements, approvals, and any necessary documentation available.
b. Contracted surveyor shall take all the necessary steps to complete the Metes and Bounds Survey for the parcels of land identified in the attached Technical Exhibit (TE-1). The work shall include the entire process required for a complete Metes and Bounds Survey of the identified parcels of land including initial setup, research, field work, monumentation, field notes, plat prep, review, approval, notices, mobilization, travel and final legal metes and bounds documents sealed by a licensed Texas Surveyor.
c. Provide (3) original sealed documents of the surveyed site and (1) DVD/CD to include all documents in PDF form.
3. PERIOD OF PERFORMANCE: Start date will be the signed Notice to Proceed with a completion date no later than 90 calendar days after the notice to proceed date.
The Contractor shall submit the work schedule to the Contracting Officer 7 days prior to the start of the survey.
4. WORK AREA ACCESS: The Contractor shall coordinate with the Contracting Officer for work area access. The area to be surveyed does not require base access.
5. PROSPECTIVE OFFERS: Only contact the Base Contracting Office 17 CONS/PKB, 210 Schertz Blvd. Goodfellow AFB, Texas 76908-4122, (325)-654-5174 for any and all information concerning this solicitation.
6. LABOR REQUIREMENTS: All companies who conduct business within the state of Texas must, in accordance with Texas Worker’s Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Worker’s Compensation Commission (TWCC), shall be submitted For Information Only (FIO) prior to starting survey work.
a. Resolution of Department of Labor citations for violations of Occupational Safety and
Health Standards is a Contractor responsibility and shall provide for no basis of a claim against the Government.
7. TOILET FACILITIES: There are no toilet facilities available for Contractor use.
File details come from the government source that posted it. Updated .