SOW_Merced_Gravel.pdf
PDF 263 KB Posted
- Attached to
- Merced NWR California GRAVEL
- Solicitation number
- 140FGA23Q0025
About this file
This statement of work outlines the requirements for a contractor to deliver 500 tons of 3/4 inch AB gravel and 400 tons of 4-8 inch cobble rip rap to multiple locations within the Merced National Wildlife Refuge in California. The contractor will deliver 200 tons of gravel and 160 tons of rip rap to the North Merced Unit, and 300 tons of gravel and 240 tons of rip rap to the East Marsh Unit. Deliveries must be made within 48 hours of request to the designated locations. The contractor must use virgin or recycled class 2 aggregate base materials and belly dump or side dump the gravel while the refuge will finish spreading it. The period of performance is undefined but normal duty hours for deliveries are Monday through Friday from 7:00am to 4:00pm. The technical points of contact are the Merced Refuge Manager and Site Foreman.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FGA23Q0025_Amd_0001.pdf | ||
| B08_Solicitation_Gravel.pdf | ||
| Sol_140FGA23Q0025.pdf | ||
| Price_Schedule_Gravel.pdf | ||
| Clauses_Windows_Gravel.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DELIVER 500 TONS OF ¾ AB GRAVEL AND 400 TONS RIP RAP COBBLE TO
Merced NWR
1. GENERAL: The Merced NWR will require the delivery and placement of 500 tons of virgin 3/4AB gravel and 400 tons of 4-8” Cobble Rip Rap to multiple locations on Merced NWR. Gravel will be spread to cover areas of refuge administration roads and water control structures impacted by activities related to the cleaning of canals and replacement of structures on the Merced unit of the Merced NWR. Rip Rap will be end dumped at designated water control structure locations on the Merced Unit. Gravel and Rip Rap will be delivered or stockpiled at designated water control structures at the Merced unit
2. SCOPE:
Provide a total of 500 tons of virgin ¾ AB gravel and 400 tons 4-8” Cobble Rip Rap to locations (North Merced Unit, East Marsh unit) on the Merced National Wildlife Refuge.
Two hundred (200) tons of ¾ AB gravel, one-hundred sixty (160) of 4-8” Cobble Rip Rap to North Merced Unit.
Three hundred (300) tons of ¾ AB gravel, Two-hundred forty (240) Tons Rip Rap Cobble to East Marsh unit.
A gravel delivery truckload is considered between 20-25 tons. Gravel will be belly dumped or side dumped on existing gravel roads and disturbed construction areas at an even rate. A rip rap delivery truck load will be considered 20 tons and will be stockpiled or end dumped at designated locations. Areas where gravel and rip rap are to be placed will be marked in advance. Gravel will be placed in quantities to allow coverage of an average width of 7 feet to an average thickness of 4 inches. Some areas may require an average width of 5 feet and others up 10 feet to an average thickness of 4 inches.
Material must be ¾” Class 2 Aggregate Base virgin or 12” minus fractured rock; no recycled materials such as asphalt, porcelain or concrete will be accepted.
3. PLACE/DELIVERY AND PERIOD OF PERFORMANCE: Deliveries will be at various locations within the Merced National Wildlife Refuge. Site Foreman will provide load amount requests and delivery locations on a daily or weekly basis to the contractor, deliveries of the requested amount of materials will be expected within 48 hours of request.
Delivery locations:
North Merced Unit-200 ¾ AB gravel, 160 Tons Rip Rap Cobble Merced National Wildlife Refuge – Red Barn, North Merced 37.189812°, -120.610951° 6689 W Sandy Mush Rd Merced, CA 95341
East Marsh Merced Unit- 300 Tons ¾”AB, 240 Tons Rip Rap Cobble Delivery within one mile of or stockpile at:
Merced National Wildlife Refuge-Maintenance Shop 7430 W Sandy Mush Rd Merced, CA 95341
4. GOVERNMENT FURNISHED EQUIPMENT OR
MATERIALS/INFORMATION:
Delivery requirement is to belly dump gravel and spread gravel as much as allowed by normal operating practices of delivery equipment at designated locations within the Merced NWR and end dump rip rap. USFWS equipment will finish spreading gravel to final requirements.
5. AVAILABILITY: Normal duty hours are Monday thru Friday 7:00 a.m. – 4:00 p.m.
6. TECHNICAL COORDINATOR: Gabriel Sandoval, Merced Refuge Manager.
Cell Phone 209-587-5530. Office # 209-826-3508. Site Foreman: Kyle Whiteaker, Engineering Equipment Operator, Cell #209-587-0368.
File details come from the government source that posted it. Updated .