SOW Maintain RO-DI Water Treatment System.docx
DOCX document 35 KB Posted
- Attached to
- J046--Reverse Osmosis / De-ionization Water System Maintenance Federal contract opportunity
- Solicitation number
- 36C26326Q0096
About this file
This Statement of Work (SOW) details maintenance requirements for Reverse Osmosis/Deionized (RO/DI) water treatment systems at the Minneapolis VA Health Care System. The contract is structured as a base year plus four option years, covering water treatment system maintenance in multiple buildings (70 and 49), with services including monthly system inspections, water testing, tank exchanges, filter replacements, and critical water sampling. Key service specifications include monthly heterotrophic plate count and endotoxin testing, semi-annual loop disinfection, quarterly and semi-annual tank exchanges, and emergency service response within four hours. Contractor responsibilities encompass providing all materials, tools, equipment, and labor, with work primarily performed Monday through Friday from 7:00 am to 5:00 pm, excluding federal holidays. The solicitation is currently in a Sources Sought notice phase, targeting businesses with NAICS code 221310, with potential small business set-aside considerations under SBA subcontracting limitations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26326Q0096_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
“Maintain RO/DI Water Treatment System”
1. Introduction:
a. The Minneapolis VA Health Care System (MVAHCS) requires a continuous supply of Reverse Osmosis and Deionized water supply for the Sterilizing Processing (SPS) and Laboratory (LAB) departments.
2. Objectives:
a. Establish a base plus four (4) year Service and Maintenance contract for the RO/DI water treatment systems located at Minneapolis VA.
3. Statement of Work:
a. One on-site assessment is required to evaluate the work to be performed and provide the most accurate price quote. Assessment must be completed prior to the closing date of the solicitation.
b. Contractor will remove and install 8 Carbon tanks and 8 Mixed Bed tanks on the first business day of the base year contract unless contractor is the incumbent.
c. Contractor is responsible for all materials, tools, equipment, and labor to service the water treatment system in the following areas:
· Bldg 70 Room BA101 – Lab/SPS (RO/DI)
· Bldg 70 Room 3P127 – Research (DI)
· Bldg 70 Room 4Q127 – Research (DI)
· Bldg 49 Room 228A – Research (DI)
d. Contractor shall perform services outlined in the table below:
| Service (BA101-70) |
| Intervals |
| Qty per Service |
| Annual total |
| 1 |
| System inspections |
| Monthly |
| 1 |
| 10 |
| 2 |
| System inspections and Loop Disinfection (weekend rate) June and December |
| Semi annual |
| 1 |
| 2 |
| 3 |
| Replace RO Pre Filter (5 micron) |
| Monthly |
| 1 |
| 12 |
| 4 |
| Water Test Heterotrophic Plate Count (HPC) |
| Monthly |
| 8 |
| 96 |
| 5 |
| Water Test - Endotoxin |
| Monthly |
| 8 |
| 96 |
| 6 |
| Mixed Bed Tank exchange, 3.6 cu ft. |
| as needed |
| 2 |
| 8 |
| 7 |
| Carbon Tank exchange 3.6 cu ft. |
| as needed |
| 2 |
| 6 |
| 8 |
| Replace Post Filter (.2 Micron) |
| Semi-Annually |
| 1 |
| 2 |
| 9 |
| Replace Vent Filter (.45 micron) |
| Annually |
| 1 |
| 1 |
| 10 |
| Replace UV Lamp and Quartz Sleeve |
| Annually |
| 1 |
| 1 |
| 11 |
| Test effluent to verify chlorine removal PE-R4 |
| Monthly |
| 1 |
| 12 |
| Service (3P127-70, 4Q127 & 228A-49) |
| Intervals |
| Qty per Service |
| Annual total |
| 1 |
| Mixed Bed Tank exchange, 3.6 cu ft. |
| Quarterly |
| 6 |
| 18 |
| 2 |
| Carbon Tank (rental) exchange 3.6 cu ft. |
| Semi-Annual |
| 3 |
| 9 |
| 3 |
| Test effluent to verify chlorine removal PE-R4 |
| Monthly |
| 3 |
| 36 |
e. Replace carbon and/or DI tanks ahead of schedule if they become depleted due to increased water usage.
f. As part of the monthly system inspections, inspect/replace filters, O-rings, UV lamps, and quartz sleeves on a periodic basis or when items fail under normal use.
g. Provide loop disinfection on a semi-annual basis for system located in BA101 that serves SPS and Lab. (June and December).
h. Critical water testing: Samples will be drawn on the first workday of each month and provide the results to the COR & SPS Supervisor no later than the 15th of each month. Water samples will be drawn from the critical water loop system that is located in BA101 and points of use in SPS. Monthly water samples will be drawn from the following locations:
· BA101- Existing sampling valve.
· BM 107- DI Water - Sink 1, 2, 3 and 4.
· BM 107C – DI Water - Sink 1, 2 and 3.
i. Provide emergency services after normal hours listed in Section 4, on weekends, and on holidays. Respond within four (4) hours of notification.
4. Invoicing:
a. Invoices will be submitted monthly. Invoice will be itemized and list the services performed and/or the materials that were used for that month.
5. Working hours:
a. Anticipated hours of work will be Monday through Friday from 7:00am – 5:00 pm. Additional hours must be coordinated through the COR. Work will not be performed on weekends or federal holidays unless there is an emergency.
Observed Federal Holidays:
| New Year’s Day | Martin Luther King, Jr.’s Birthday | ||
| Washington’s Birthday | Memorial Day | ||
| Juneteenth | Independence Day | ||
| Labor Day | Columbus Day | ||
| Veteran’s Day | Thanksgiving Day |
Christmas Day
6. Deliverables:
a. Service Reports due after the performance of each service listed in the chart in Section 3.b.
b. Monthly Critical Water Test Results: Results due on the 15th of each month.
7. References:
ANSI/AAMI ST108 (2023 or most current edition)
8. Safety:
a. Contractors are responsible for maintaining a safe working environment for their employees as well as the MVAHCS Staff. Work areas will be kept clean throughout the day, and all trash and demolished materials are to be properly disposed of daily.
b. Additional PPE will be required when entering the SPS Department. This PPE will be provided by the MVAHCS.
9. Security:
a. Contract personnel need to obtain a vendor’s badge form VA Security located at the outpatient entrance security desk. A valid government issued form of identification will be required to receive a badge.
b. Contractor’s Technicians are required to check in with the COR upon arrival at facility to obtain access and any additional instructions, task explanations, and project location information. Daily performance log sheets are required to be submitted to the CO and COR daily. The logs will provide information about location and progress that has been made.
END