SOW Lorain garage door.doc

DOC document 208 KB Posted

Attached to
INSTALL OF GARAGE DOOR MOTOR
Solicitation number
2121301CV530
Issued by

View the file

Other files

File Type Posted
CV530 Questions.txt TXT text file
Garage Door 3.JPG JPG image
Garage Door 1.jpg JPG image
Garage Door 2.JPG JPG image
Garage Door 4.JPG JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Homeland Security

United States Coast Guard

Scope of Services

For

Garage door repair At

U.S. Coast Guard Station Lorain (small) Lorain, Ohio

July 2021 Officer in Charge United States Coast Guard

Station Cleveland Harbor Cleveland, OH 44114

TABLE OF CONTENTS

Section
Title
Page
01010
Scope of Work
3
01020
Coordination
4
01030
Safety Program
4
01040
General Cleanup & Site Restoration of Work Areas
5

SECTION 01010

SCOPE OF WORK

1. SCOPE OF WORK: Contract work shall encompass the following items of work as described in these specifications. This summary is not all-inclusive and delineates only those work items deemed as major to the contract. Ancillary work items not listed below, though necessary to attain the completed project, shall be included in the contract. Specifically, the contractor shall:

1. Repair boathouse garage door

a. Replace garage door motor

b. Provide all equipment and parts for garage door repair

c. Ensure garage door tests fully functional after repair

1.2 LOCATION: The site is located at 110 Alabama ave. Lorain, OH 44152

2.

DRAWINGS: Drawings and the accompanying specifications are the property of the Government and comprise legal documentation that pertains exclusively to this project. Drawings will be made available in a format determined by the solicitation method. CEU Cleveland will not provide hard copies of drawings.

SECTION 01020

COORDINATION

1. INTERFERENCE WITH COAST GUARD OPERATIONS: Accomplish work in a manner that causes minimal impact on normal operations. Station Cleveland Harbor will minimize the amount of traffic through the work area while work is being conducted.

2. THE CONTRACTING OFFICEER’S TECHNICAL REPRESENTATIVE

The Contracting Officer’s Technical Representative will be provided.

3. GOVERNMENT FACILITIES AND UTILITIES: Electrical Power is available on the site. Restrooms will also be available at Station Lorain facility.

4. MATERIALS AND LOCATIONS:

1. Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturer’s recommendations.

2. Contractor is required to comply with Federal, State and Local laws, codes and regulations. All subject Safety Data Sheets shall be available upon request.

5. SCHEDULE OF WORK: Upon arrival and completion of the workday the contractor must check in and out onboard Station Lorain. Completion of work shall be accomplished within 30 Calendar days from receipt of notice to proceed. Normal work hours are 7:00 am to 4:00 pm. Weekends will be available on request by contractor. Alternate work hours must be approved by the Contracting Officer’s Representative, (COR).

SECTION 01030

SAFETY PROGRAM

1. GENERAL: The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with the requirements of all Federal, State and Local safety laws, rules and regulations.

2. Workmen shall wear proper personal protective equipment when required by Federal, State and Local safety laws.

3. The Contractor shall ensure all members of the working party have a valid identification to be displayed at the main gate at each entry.

SECTION 01040

GENERAL CLEANUP & SITE RESTORATION OF WORK AREAS

1. GENERAL: The Contractor shall remove and properly dispose of all trash and debris incidental to the contract work, from the limits of government property, as well as all adjacent affected areas. The Contracting Officer Technical Representative shall determine the extent and interval of these cleanups.

2. SITE RESTORATION: If at any time while performing the contract the Contractor causes damage or destruction to any portion of any Government facility or grounds; e.g., bulkheads, pavement, lawns, shrubbery, etc., it shall be the Contractor's responsibility to replace and/or restore the damage as approved by the Contracting Officer’s Technical Representative at no additional cost to the Government.

3. POST CONSTRUCTION CLEANUP: Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains as well. If the job site appearance is not to the satisfaction of the Contracting Officer’s Technical Representative, final acceptance will not be approved.

SECTION 01 55 00

ACCESS ROADS AND PARKING

1.

ACCESS: Access to the site is available from public roads. Stability and load bearing of the ground must be assessed by the contractor, and is the liability of the contractor. Any damage to these road/ paved areas by the Contractor's vehicles shall be repaired without cost to the Government.

2.

PARKING: Vehicular operations and parking shall comply with all applicable government orders and regulations. All driveways and entrances serving the Government shall be kept clear and available to emergency vehicles at all times.

END OF SPECIFICATION

_1489490133.bin

File details come from the government source that posted it. Updated .