140FS223Q0084 2023 Quarters Demolition Debris Removal Laguna Atascosa National Wildlife Refuge
Hidalgo County Texas
GENERAL INFORMATION AND REQUIREMENTS
1.1 PROJECT DESCRIPTION
The removal of all debris from demolition of living quarters. The foundations of the living quarters require demolition and removal. All debris is to be removed from premises and disposed of in accordance with local, state, and federal law.
A. The loading and removal of all debris, including the demolition of foundations, from 4 living quarters on Laguna Atascosa National Wildlife Refuge. The selected contractor will haul debris to the landfill of its choosing.
B. Site Visit: Contractors are encouraged to visit the project sites and inspect existing conditions prior to submitting bids. Visits should be scheduled Monday – Friday from 8 am – 3pm. Please contact Sergio Vasquez 956-556-1552.
C. Means and Methods. Means and methods are the contractors. Contractor may elect to use equipment necessary for demolition, loading and removal of debris.
1.2 COST
A. Contractor must provide a price per living unit for each of the base bid items.
B. Costs of all required work including labor, equipment, materials, weighing, testing, transportation, overhead, profit, and contractor owed taxes, are to be included in the prices bid in the schedule for which the work is required.
C. Measurement for Payment: Removal of all debris from the Refuge
1.3 CODE COMPLIANCE
Comply with the following listed codes and standards.
OSHA Safety and Health Standards for the Construction Industry (29 CFR Part 1926).
1.4 PERMITS
Contractor is responsible for any other permits needed.
1.5 UTILITIES
Power and water is not available at the site. The Contractor shall make all arrangements to provide power and water if needed for its operations.
1.6 USE OF PREMISES
Contractor activities are limited to Refuge hours of work: 8:00 a.m. to 3:00 p.m., Monday through Friday.
Work outside these hours or on weekends or Federal holidays is not permitted.
1.7 COMPLIANCE
Comply with specified codes and standards, and follow approved construction plans to ensure safe and satisfactory project completion.