SOW Landscaping Dayton Manor.pdf
PDF 95 KB Posted
- Attached to
- DAYTON MANOR Landscaping Service Federal contract opportunity
- Solicitation number
- 15BBR021Q00000007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF1449 Solicitaion 15BBR021Q00000007.pdf | ||
| Service Contract Act WD 2015 4187.pdf | ||
| CONTRACTOR INFORMATION SHEET.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK/SPECIFICATIONS
MDC Brooklyn – Dayton Manor
Landscaping Services
I. SPECIFICATIONS:
A. INTRODUCTION
The Federal Bureau of Prisons (FBOP), Metropolitan Detention Center- Dayton Manor located at 9325 Fort Hamilton Parkway Brooklyn, NY intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to perform Landscaping Services from June 1 thru September 30, 2021.
B. SCOPE OF WORK
The contractor is responsible to provide all equipment and labor to maintain all common area lawn and garden areas located along all roadways, sidewalks and interior turf areas on a bi-weekly basis. All leaves and foreign debris will be removed from the site on a bi-weekly basis. All shrubs are to be trimmed as necessary to keep a clean and tidy appearance. All walkways, driveways and edges of the building will be kept free of weeds. All flowerbeds will be cultivated as needed. In order to have a neat appearance the grass is to be treated in June with application of fertilizer, In September turf areas will be power raked and followed by seed, fertilizer and lime. Each time chemicals are applied warning signs must be posted in the area so residents know that chemicals have been applied to the area.
C. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS
All requirements, environmental compliance, Life Safety, and Federal, State and Local codes and regulations will be considered during all phases of this contract.
Services and materials provided by the contractor will adhere to and shall be consistent with the most current industry standards.
It is the contractor’s responsibility to obtain permitting, should it be required. Copies of all permits must be submitted to the COR upon receipt from local agency.
D. UTILITIES
The FBOP will provide water, use of restrooms and minimal electricity service (120V) for small hand power tools including battery chargers. The contractor will provide all other equipment, supplies and materials needed to complete this project.
F. HOUSEKEEPING AND MATERIAL DISPOSAL
The contractor awarded the contract will be responsible to remove any cut grass, shrubs and other debris from the services off the premises.
G. SUBMITTALS & TRAINING
Submittals:
1. All security clearance paperwork/documentation shall be submitted to the COR a minimum of (14) working day prior to the start of work (see below).
2. Any deviations from this Statement of Work will be considered a Change Order Request and must be authorized through the institution’s Contracting Officer prior to the implementation of the requested change.
3. It is the Contractor’s responsibility to repair and/or replace any Government property damaged by contractors/subcontractors employees. Damage will be corrected and restored to previous condition at no cost to the Government.
10. It shall be the Contractor’s responsibility for obtaining all measurements and data requirements to comply with manufacturer’s installation recommendations. All installations must be in accordance with product manufacture’s recommendations.
II. CONTRACTOR SECURITY/WORKING REGULATIONS
A. Work Hours:
Work Hours for the contractor are 7:00 PM – 4:00 AM, Monday - Friday, excluding weekends and federal holidays. Any work required to be completed at any other time than noted above must be requested in writing to the COR five (5) working days prior to the start of the work. In the event of any equipment being replaced that would result in downtime of the normal orderly running of the institution, alternate work hours may be authorized in accordance with the time frame stated above.
C. Storage of Materials and Equipment:
The storage of any type of chemical is prohibited from being stored on the site.
D. Security Clearance/Contractor Badges:
The contractor shall provide the COR with all the necessary security clearance documents for all contractors and subcontractor employees accessing the work area. In the event a contractor or subcontractor employee cannot pass the security clearance process, it will be the contractor’s responsibility to provide another candidate. By law the BOP cannot, and will not, release any information to the contractor concerning the nature of why a contractors or subcontractor employee was not able to pass the security clearance process.
E. Safety and Personal Protective Equipment:
All contractors and employees shall have and wear the required personal protective equipment (PPE) prescribed by industry standards at all times while on the job site. It is the responsibility of the contractor to provide all PPE equipment. All ladders regardless of the size shall be stored, and secured to a stationary fixture with a chain and lock in a predetermined area, in a way that they cannot be removed. If ladders are required, immediately consult with the COR to ensure that he or she can make timely notification to appropriate institution staff. All extension cords regardless of length shall be in good condition with no broken outer insulation and will be secured in a locked construction gang box.
F. Additional Considerations:
1. Contractor will be permitted to wear jeans in the institution, however, shorts, green or khaki-color clothing will not be allowed. The clothes will be proper and suitable for the services that are being provided.
2. Federal smoking policy on Federal property states that smoking is only allowed in outdoor designated areas. This policy will be strictly enforced.
3. All contractors are required to wear facemasks in compliance with Center of Disease Control (CDC) and maintain social distancing as recommended to the extent possible.