SOW_KWRD_F2E3CE5078A002_GPR.pdf

PDF 27 KB Posted

Attached to
Ground Penetrating Radar at Holloman AFB, NM
Solicitation number
FA480125Q0019
Issued by

About this file

This Statement of Work (SOW) outlines training requirements for a Ground Penetrating Radar (GPR) system at Holloman Air Force Base. The training will be conducted at Building 55, with a performance period of one month from final purchase, during standard working hours (8:00 am to 4:30 pm). The contractor is required to provide a 1-2 day, 8-hour on-site training session covering equipment set-up, operation, best collection practices, and post-processing, as well as deliver either a digital or hardcopy operational manual with troubleshooting guidelines. The primary objective is to ensure proper care, handling, and operational readiness of the GPR equipment, with specific focus on providing comprehensive training tailored to the base's environmental conditions.

View the file

Other files

File Type Posted
Solicitation - FA480125Q0019.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOLLOMAN AIR FORCE BASE

GROUND PENETRATING RADAR

TRAINING

STATEMENT OF WORK

28 April 2025

1. PROJECT SPECIFIC INFROMATION:

1.1. Location: 49 CES Building 55

1.2. User Contact: Sherry Lehmuth 575-572-5577

1.3. Performance Period of Training: Within one month of final purchase

1.4. Working Hours: Standard (8:00 am to 4:30 pm)

1.5. Restricted area (as defined in HAFB Instruction 31-102): No

2. SCOPE OF WORK:

This Statement of Work is to ensure Contractor provides proper care and handling of the ground penetrating radar (GPR) equipment and is in operational condition upon delivery. The Contractor shall provide adequate post-processing software instructions as well as training on the best collection practices for our environment.

2.1. Training:

2.1.1. Contractor shall perform a 1 to 2-day 8-hr on-sight training session covering equipment set-up, operating, best collection practices, and post-processing.

2.1.2. Contractor provides either digital or hardcopy operational manual and troubleshooting guidelines.

File details come from the government source that posted it. Updated .