STATEMENT OF WORK
FOR
Construction of Hogan
AT
KAYENTA HEALTH CENTER
KAYENTA, ARIZONA
November 12, 2020
KAYENTA SERVICE UNIT
1. Introduction:
1.1. Kayenta Health Center (KHC) is located south of Arizona State Highway 160 at milepost 364.3. The nearest town is a two hour drive. The Kayenta Service Unit serves a population of ~20,000 people spread across a remote and sparsely populated area. Services are provided to ~200 patients each day. KHC provides walk-in clinics and a 24 hour, 7 days per week emergency room. Construction of new Hogan southeast of KHC where specified (Fig 10.1)
2. PROJECT BACKGROUND
a. The selected area where the Hogan to be build is a dirt field on the southeast side Kayenta Health Center.
This is a turnkey project to build Pre-cut Log Hogan with building material specified on this SOW. This project requires the construction and installation of a Hogan that is 10 feet side wall length and 8 feet high.
The project will require reinforced fibers concrete for foundation. Task will involve work with lumber, 8” logs, concrete, a/b material, compressed air, stakes and tools of the trade.
b. KHC to provide Point of Contact for construction of Hogan.
c. KHC to furnish building material where specified.
d. Contractor to provide hardware where needed and lumber for door and window frames.
3. PROJECT DESCRIPTION:
3.1. The project includes the following work:
a. Construction of foundation forms per specification, KHC supply plywood foundation forms.
b. Contractor to compact soil and AB material. KHC furnish AB rock and sand material.
c. Contractor to furnish and install reinforced 5/8 rebar in foundation.
d. Contractor to furnish, pour, and finish 3000 psi concrete for foundation and entrance landing.
e. Contractor to furnish and install 25 anchors.
f. Contractor to remove foundation forms and return to KHC.
g. Contractor to build Hogan wall with 8” round logs. KHC furnish pre-notched logs and 12” nails. Cut length of logs to needs of KHC.
h. Contractor to screw down anchor to first layer of logs.
i. Contractor to cut out door and windows and furnish and frame door and window frame.
j. Contractor to furnish and install 42” or 48” roof octagon opening. To decide during construction.
k. Contractor to build roof rafters and fascia. KHC furnished rafters and fascia.
l. Contractor to install tongue and groove ceiling panels. KHC furnished T&G panels
m. Contractor to measure, furnish, and install 1 inch foam roofing insulation, install 1 inch wood to fasten down pro-panel (between insulation panels).
n. Contractor to engineer, furnish, and install roofing pro-panels and underlayment.
o. Contractor to furnish and install two double pane wood windows. 48” x 36”.
p. Contractor to furnish and install solid wooden door. 36” wide.
q. Contractor to furnish paint stain all wood and furnish and apply protective coating to all exposed wood.
a. KHC is to dispose of debris at approved EPA disposal location.
b. Elevation: 5,700 ft
3.2. KHC to provide backhoe, fork lift, scuffles, and flat compactor.
3.3. Contractor to assist KHC Electrician in drilling holes and race way for electrical cable. KHC to provide electrical supplies and equipment.
3.4. All work needs to be quality workmanship finished.
3.5. All installation and modification work for this project should encompass needed equipment, parts and materials required to achieve KHC project goals.
3.6. Finished work/product needs to function as intended, properly, be pristine and professional.
4. CRITERIA:
4.1. KSU employees shall perform monitoring of work in accordance with best common practices and standards.
5. GENERAL REQUIREMENTS:
5.1. An on-site Pre-Construction meeting with KSU staff to be held prior to start of project.
5.2. The Pre-Construction meeting will highlight special aspects of this project, establish lines of
Communication, establish coordination, develop a clear understanding of duties and Responsibilities for this project.
5.3. Work is to be done during normal business hours Monday-Friday 8:00am through 5:00pm, excluding Federal Holidays.
5.4. Any changes of work/materials shall be approved by Point of Contract before changes are enacted.
5.5. Take all necessary precautions to protect the building and its occupants during this time.
5.6. Contractor to provide barriers to isolate construction zone for trench and Hogan building.
5.7. Good housekeeping practices on a frequent basis is mandatory to prevent slip, trips and falls.
5.8. The work area, including storage areas, shall be free from accumulations of waste materials.
5.9. Upon completing the work, the workers shall leave the work area clean, neat, and in orderly conditions satisfactory to Safety Officer.
6. SPECIAL REQUIREMENTS
6.1. Watering down the area for dust suppression
6.2. Compaction of the work area
7. Period of Performance
7.1. The period of performance shall beginning Date of Award through September 30, 2021.
8. Contact information:
8.1. Desmond Jones at 928-697-4375
8.2. Leo Thinn at 928-697-4377
8.3. Daisha Richards 928-697-4371
9. Warranty
9.1 Workmanship warranty 1 year
10. Photos
10.1 Plot Plan
10.2 Hogan Dimension
10.3 Hogan Concrete Dimensions
10.4 Hogan Foundation Plan
10.1
Hogan Project
New sidewalk to be constructed, 17 Cu. Yds.
• Dimensions
• 230 feet in length
• 6 feet in width
• 4 inches thick
10.2
10.3
10.4