SOW_Kitchenette_2nd_Floor.docx
DOCX document 148 KB Posted
- Attached to
- FACZG Kitchenette Renovation
- Solicitation number
- PR15941011
- Issued by
-
Department of State
About this file
This is a Statement of Work (SOW) for kitchenette renovation services at the U.S. Embassy Zagreb, Croatia Chancery building located at Thomasa Jeffersona 2, 10000 Zagreb. The contractor must supply all labor, supervision, and materials except for government-furnished electrical components (outlets, wire, conduit, and boxes). The project requires a firm fixed price proposal denominated in EUR including VAT, submitted within 15 calendar days of the proposal request. The scope includes comprehensive renovation work: demolition of existing cabinets and flooring; plumbing installation using copper pipes per EN 1057/EN 8062 with Viega ProfiPress fittings for sink and coffee machine water lines; electrical outlet installation for the coffee machine; drywall repair and painting with Dulux QD Eggshell paint in Golden Fern tone (35YY 86/117) applied in minimum two coats; SPC vinyl flooring installation (class 34 per EN 16511) with matching 100mm vinyl baseboards and aluminum transition profiles; and cabinetry manufacturing and installation per approved detailed drawings.
Specified materials include 18mm thermally fused particle board cabinet carcasses with Blum Legrabox drawers and Blum Clip Top Blumotion hinges, a 20mm quartz countertop, Blanco Lemix XL sink with Grohe Minta faucet, and a Bosch KGN397LEQ refrigerator or equivalent. The contractor must submit detailed cabinet drawings for COR approval before commencing work and is responsible for daily debris removal, lawful disposal documentation, and all property damage liability. The Contracting Officer Representative is Alen Nemecek (nemeceka@state.gov, +385 91 661 2356). The proposal must include labor and material bill of quantities, work schedule specifying completion timeframe, and final pricing. All work requires compliance with local occupational health and safety standards, submission of a written accident prevention plan before commencement, and final COR inspection with payment held until deficiencies are resolved.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
U.S. Department of State U.S. Embassy Zagreb
STATEMENT OF WORK FOR
Kitchenette Renovation Chancery Second Floor
April 9, 2025
1 INTRODUCTION
| 1.1 | The U.S. Embassy Zagreb, Croatia has a requirement to modify kitchenette space in the Chancery building, located at U.S. Embassy Compound, Thomasa Jeffersona 2, 10000 Zagreb. |
| 1.2 | The contractor will supply all labor, supervision, and the materials for the project, except the materials listed under Government Furnished Materials (GFM). |
| 1.3 | If during project, contractor finds that additional work needs to be done to complete the project, they will notify the COR immediately. Additional work must be approved by the Contracting officer by issuing a Change Order. |
| 1.4 | The contractor is responsible to remove all trash and debris resulting from this contract from the site daily and lawful disposal of it. Government reserves the right to ask for proof of lawful disposal. |
| 1.5 | The contractor is responsible and will be held liable for all damages to the Government or a third‐party property caused by the contractor during the execution of this project. |
| 1.6 | Measurements in the drawings are for orientation only. The contractor will be allowed access to the property in order to take all necessary measurements before submitting the quote. Price adjustment caused by inaccurate measurements will not be accepted. |
| 1.7 | The Contracting Officer Representative (COR) will be the contractor’s contact at the US Embassy, Zagreb, Croatia. The COR will assist and direct the contractor when scheduling work, and liaison with Post personnel during the execution of the Project. All questions concerning coordination of installation activities while at post shall be directed to the COR contact information is as follows: |
Alen Nemeček Assistant Facility Manager Thomasa Jeffersona 2 10010 Zagreb Tel. +385 91 661 2356 Email: nemeceka@state.gov
2 PROPOSAL REQUEST
2.1 The contractor shall submit a proposal for the project to the Procurement Office within fifteen (15) calendar days of the receipt of a Proposal Request. The cost shall be Firm Fixed Price. Cost proposal shall include the following:
a) Bill of quantities for labor and material.
b) Work schedule. Please specify number of working days needed for completion of work. Start date will be determined by the U.S. Embassy Management Office.
c) Price quotation, with the final price in EUR, including VAT.
4 SCOPE OF WORK
The objective of this project is to fix and paint the walls, replace flooring, replace the kitchen cabinets, and appliances, including all necessary electrical, plumbing, construction, and other work. Upon completion of the project, the kitchenette will be fully functional, with the new Ice machine and built-in refrigerator installed.
4.1 . DEMOLITION
4.1.1. Note: before starting any work on electrical or plumbing installation, make sure that power is disconnected, and valves are closed as appropriate. Place locks and tags on valves and circuit breakers in order to prevent accidental turning on. Before starting any work that may produce dust, isolate the work area, and disconnect the fire alarm. Make sure the fire alarm is reconnected before leaving the site at the end of the day.
4.1.2. Carefully disassemble and dispose of all kitchen cabinets.
4.1.4. Remove the existing flooring and baseboard.
4.1.5. Sand the adhesive residue from the floor surface down to the bare concrete.
4.1.6. Remove existing angle valves for the hot and cold water and place temporary plugs.
4.2 . PLUMBING WORK
Water pipes will be copper per EN 1057 and EN 806‐2. Fittings will be Viega ProfiPress. No soldiering or any other work that may involve open flame or smoke is allowed without written permit by COR or the FM.
| 4.2.1 | Water outages, if any, will be coordinated in advance with the US Embassy Management Office. |
| 4.2.2 | Install T‐pieces and separate valves for sink (hot and cold) and Coffee Machine (cold) water. Install a faucet appropriate for the Coffee Machine. |
| 4.2.3 | Connect the kitchen sink faucet to the valves for the hot and cold water. |
| 4.2.4 | Connect the sink and the Coffee Machine to the existing drain. |
4.3 ELECTRICAL WORK
4.3.1 Install a new electric outlet for the Coffee machine as indicated on the drawings. Feed the outlet from the existing junction box above the ceiling.
4.4 DRYWALL AND PAINTING
| 4.4.1 | Repair drywall opened for the piping and electrical installations. |
| 4.4.2 | Patch all irregularities on the walls. Prepare walls for painting. |
| 4.4.3 | Put primer over all new and repaired drywall. |
| 4.4.4 | Paint the walls with Dulux QD Eggshell paint, tone 35YY 86/117 (Golden Fern), minimum in 2 coats. Walls must look uniform and smooth upon finish. No stains from below shall be visible. |
4.5 FLOORING
4.5.1 Use the self‐levelling compound to level the floor (if necessary). Use Mapei Ultraplan Maxi or equivalent, per manufacturers’ instructions.
| 4.5.2 | Install SPC Vinyl flooring per manufacturers’ instructions. The flooring must have wear class 34 per EN 16511 and be waterproof. The product must be approved by the COR before installation. | |
| 4.5.3 | Install Vinyl baseboards, 100 mm in height along the walls. Color of the baseboards shall match the flooring. | |
| 4.5.4 | Install aluminum transition profile between the hallway and the kitchen (between vinyl flooring and carpet tiles). |
4.6 CABINETRY
| 4.6.1 | The concept drawings at the end of this SOW are for orientation only. The contractor shall provide the detailed drawing to the COR for approval. No work on the cabinetry shall start before the drawings are approved. |
| 4.6.2 | Manufacture and install the cabinets per specifications and approved drawings in the attachments at the end of this SOW. |
| 4.6.2 | Connect all appliances (Refrigerator, Microwave Oven, Coffee Machine) and test their functionality. |
4.7 FINAL ACCEPTANCE
4.7.1. COR will inspect the job after it’s been completed. U.S. Embassy reserves right to hold the payment until all possible deficiencies have been resolved.
5 GOVERNMENT FURNISHED MATERIALS
1. Electrical outlets, wire, conduit and boxes as needed.
6 ACCIDENT PREVENTION PLAN
(a) General. The contractor shall provide and maintain work environments and procedures which will safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities; avoid interruptions of Government operations and delays in project completion dates; and control costs in the performance of this contract. For these purposes, the contractor shall:
(1) Provide appropriate safety barricades, signs and signal lights;
(2) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and,
(3) Ensure that any additional measures the contracting officer determines to be reasonably necessary for this purpose are taken.
(4) For overseas construction projects, the contracting officer shall specify in writing additional requirements regarding safety if the work involves:
(i) Scaffolding;
(ii) Work at heights above two (2) meters;
(iii) Trenching or other excavation greater than one (1) meter in depth;
(iv) Earth moving equipment;
(v) Temporary wiring, use of portable electric tools, or other recognized electrical hazards. Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits; other electrical hazards may also require the use of a GFCI;
(vi) Work in confined spaces (limited exits, potential for oxygen less that 19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.);
(vii) Hazardous materials ‐ a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive or unstable, or any operations which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.; or
(viii) Hazardous noise levels.
(b) Records. The contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft of property, materials, supplies, or equipment. The contractor shall report this data in the manner prescribed by the contracting officer.
(c) Subcontracts. The contractor shall be responsible for its subcontractor’s compliance with this clause.
(d) Written program. Before commencing work, the contractor shall:
(1) Submit a written plan to the contracting officer for implementing this clause. The plan shall include specific management or technical procedures for effectively controlling hazards associated with the project; and,
(2) Meet with the contracting officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
(e) Notification. The contracting officer shall notify the contractor of any noncompliance with these requirements and the corrective actions required. This notice, when delivered to the contractor or the contractor’s representative on site, shall be deemed sufficient notice of the non‐compliance and corrective action required. After receiving the notice, the contractor shall immediately take corrective action. If the contractor fails or refuses to promptly take corrective action, the contracting officer may issue an order suspending all or part of the work until satisfactory corrective action has been taken. The contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any suspension of work order issued under this clause.
END OF SOW
SOW – Kitchenette Renovation – U.S. Embassy Zagreb SOW – Kitchenette Renovation – U.S. Embassy Zagreb
UNCLASSIFIED
UNCLASSIFIED
SPECIFICATIONS
CABINETS:
| ‐ | Cabinet Carcas Material: 18 mm thermally fused particle board, white |
| ‐ | Cabinet Back: 10 mm thermally fused particle board, white |
| ‐ | Cabinet Fronts: Thermally fused particle board, 18 mm, wood decor |
| ‐ | Drawers: Blum Legrabox Blumotion |
| ‐ | Kickplate: anodized aluminum, 100 mm height |
| ‐ | Hinges: Concealed hinges Blum Clip top Blumotion |
| ‐ | Backsplash: 12 mm laminated wall panel, matching the work top |
| ‐ | Work Top: 20 mm quartz countertop |
| ‐ | Sink: Blanco Lemix XL |
| ‐ | Faucet: Grohe Minta 32 918 00E |
| ‐ | Refrigerator: Bosch KGN397LEQ or equivalent approved by CO/COR. |
FLOORING:
| ‐ | SPC Vinyl flooring class 34 per EN 16511 – to be approved by the COR (approximately 10 m2) |
| ‐ | Vinyl baseboards, color matched to the flooring, 100 mm in height along the walls (approximately 12 m) |
· Aluminum Transition Profile between carpet and the Vinyl flooring
WALLS:
| ‐ | Dulux Diamond Eggshell paint, tone 35YY 86/117, minimum 2 coats |
| MATERIAL APPROVAL SUBMITTAL |
(See Instructions on Reverse)
| TO: (Contracting Officer) |
| FROM: (Contractor) |
| DATE (YYYYMMDD) |
| CONTRACT NUMBER |
| SUBMISSION NUMBER |
| SUBMITTAL |
☐NEW ☐RESUBMITTAL
| PREVIOUS SUBMISSION NUMBER |
| PROJECT NUMBER |
| TO BE COMPLETED BY CONTRACTOR |
| FOR GOVERNMENT USE ONLY |
| ITEM NO. |
| SPECIFICATION SECTION/ PARA NO./DRAWING NO. |
| DESCRIPTION OF MATERIAL |
(Include Type, Model Number, Catalog Number, Mfg., etc.)
| APP ROVED |
| DISAPPR OVED |
| SEE REVERSE |
| INITIAL |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
| ☐ |
BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND TITLE |
| SIGNATURE |
FOR GOVERNMENT USE ONLY
TO:
For Evaluation and Action
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND GRADE |
| SIGNATURE |
TO: (Contracting Officer)
| RECOMMEND |
| ☐APPROVAL |
| ☐DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON |
THE REVERSE
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND GRADE |
| SIGNATURE |
TO: (Contractor)
☐APPROVED ☐DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE.
☐RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.
| DATE (YYYYMMDD) |
| TYPE OR PRINT NAME AND GRADE |
COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.
ATTACHMENT 2 UNCLASSIFIED