SOW_KeyLargo_FY24_WYP_REVISED_08202024.docx

DOCX document 28 KB Posted

Attached to
Key Largo: Small Boat Haul Outs Federal contract opportunity
Solicitation number
1305M224Q0327
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This document is a Statement of Work (SOW) for the annual haul-outs of a group of Florida Keys National Marine Sanctuary (FKNMS) vessels based in Key Largo, FL.

The SOW details the specific work tasks required on four FKNMS vessels, including securing, pressure washing, and replacing bottom paint, as well as replacing rubrails, windshields, cabin doors, and emergency signal kits on one of the vessels. The period of performance is November 1, 2024 through February 28, 2025, with the contractor responsible for coordinating the work schedules to avoid delays. The contractor must have a facility located within 100 miles of Key Largo, FL, and will be responsible for the safety and security of the vessels during the contract period. The Government reserves the right to award some or all of the tasks defined in the SOW. The related federal contract opportunity is Solicitation Number 1305M224Q0327, "Key Largo: Small Boat Haul Outs", issued by the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files for this federal contract opportunity

Other files attached to Key Largo: Small Boat Haul Outs, newest first.
File Type Posted
Sol_1305M224Q0327.pdf PDF
Wage_Determination_2015-4583_-_Rev_27_-_7-22-24.pdf PDF
Past_Performance_Reference_Sheet.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Florida Keys National Marine Sanctuary Key Largo Small Vessel Group Yard Work Revision C 8-21-24

A] GENERAL INFORMATION:

1] This Statement of Work contains the requirements for annual haul-outs of a group of Florida Keys National Marine Sanctuary (FKNMS) vessels based in Key Largo FL. Vessel identification:

Name
Brand
Length
Beam
Power
R3007
Manta Racing
30’
9’
2 x 250 OB
R3004
Manta Racing
30’
9’
2 x 250 OB
R3002
Sea Vee
30’
9’
2 x 250 OB
R2509
Boston Whaler
25’
8’
1 x 250 OB

2] All work is to be accomplished at the contractor’s facility. The contractor’s facility shall be located less than 100 miles from 95230 Overseas Highway, Key Largo, FL 33037. NOAA shall deliver each vessel to the contractor’s facility on the boat’s trailer, and pick up the vessel on the trailer after completion of all work. The period of performance for completing all work on all vessels listed above is:

November 1, 2024 through February 28, 2025 The scheduling of delivery and pick-up of each vessel will be finalized with the Contractor prior to start of the performance period.

3] Coordination of the work schedules shall be the responsibility of the contractor so as to avoid any delays or disruptions. The contractor shall provide all facilities, labor, materials, tools, and services required to complete the work.

4] Upon arrival at the contractor’s facility, the contractor shall accept full responsibility for the safety of each vessel, including fire protection, security patrols, and protection from adverse environmental conditions. This responsibility shall terminate only after all work is complete, accepted by NOAA, and NOAA personnel remove each vessel from the contractor’s facility.

5] NOAA employees and contractors may be working on board the vessels during the contract period of performance on a not-to-interfere basis. During this period, these personnel shall be given full access to the vessels during normal working hours.

6] The contractor shall ensure that all machinery and equipment used lifting the vessels from their trailers (if required) is fully functional, suitable for the task, rated for loads at least 20% greater than the maximum weight of the vessels, and operated by trained, competent personnel. Docking plans for the vessels are not available, and proper support positioning is the responsibility of the contractor.

7] The Government reserves the right to award some or all tasks defined herein.

8] All work performed under this SOW shall meet or exceed all current requirements of ABYC and USCG (Subchapter T) as applicable to the size and type of each vessel, in addition to any specific requirements stated below.

9] In the event defects or damage unrelated to the work tasks are discovered on a vessel, the contractor shall submit a Condition Found Report (CFR) to NOAA staff. The CFR shall define corrective actions needed, the cost for that work (separated into labor, materials, services, and total), and the impact to the period of performance. No additional work shall be requested or performed without prior approval by the Government Contact Point and the Contracting Officer.

10] Any welding, if required as part of the tasks below, shall be performed by certified welders working in accordance with approved weld procedures. Certifications and approvals by USCG, ABS, or another nationally recognized authority are acceptable, and copies of these shall be provided with the quote.

11] All work performed on the vessels shall be accomplished as described unless alternatives are presented in writing BEFORE the work commences, and are agreed to by NOAA. Any work that does not adhere to the descriptions below will be redone at the contractor’s expense and within the defined period of performance.

12] Bidders are strongly encouraged to inspect the vessels before submitting proposals, and understand all general and local conditions that may affect the cost of the performance of the contract to the extent such information is reasonably obtainable. In no event shall a failure to inspect the vessel constitute grounds for a claim after award of the contract. The vessels are located at 95230 Overseas Highway, Key Largo, FL 33037.

B] SPECIFIC WORK TASKS ON R3007:

1] Secure, pressure wash, block, lay days

a) Remove the vessel from the trailer to allow full access to the bottom for cleaning. Ensure that the vessel is blocked and secured in accordance with standard practice for this vessel type and size.

b) Pressure wash and scrape to clean the bottom of the hull below the waterline, and include cleaning of engine lower units, stern platform supports, and thru-hull fittings. Do not damage any existing bottom paint. Clean transducers with a non-metallic brush, taking care to not mar the emitting surface in any way.

2] Strip and replace bottom paint

1. Remove all existing anti-fouling coating on the underwater hull of the vessel and associated submerged fittings and attachments.

1. Tape off waterline.

1. Prepare and prime the hull, and apply two coats of Pettit Ultima SR60 blue 1032 antifouling paint (or equal) to the hull below the waterline, with a third coat applied at the waterline to extend six inches below the waterline.

1. Prep and paint the trim tabs and associated hardware on the transom. Ensure the ram cylinder rods and seals are adequately masked before painting.

1. Ensure blocks and stands are shifted so that all areas of the hull are properly prepared and painted.

C] SPECIFIC WORK TASKS ON R3004:

a) Remove the vessel from the trailer to allow full access to the bottom for cleaning and painting. Ensure that the vessel is blocked and secured in accordance with standard practice for this vessel type and size.

b) Pressure wash and scrape to clean the bottom of the hull below the waterline, and include cleaning of engine lower units, stern platform supports, and thru-hull fittings. Do not damage any existing bottom paint. Clean transducers with a non-metallic brush, taking care to not mar the emitting surface in any way.

2] Strip and replace bottom paint

a) Remove all existing anti-fouling coating on the underwater hull of the vessel and associated submerged fittings and attachments.

b) Tape off waterline.

c) Prepare and prime the hull, and apply two coats of Pettit Ultima SR60 blue 1032 antifouling paint (or equal) to the hull below the waterline, with a third coat applied at the waterline to extend six inches below the waterline.

d) Prep and paint the trim tabs, engine brackets, and associated submerged hardware on the transom. Ensure the ram cylinder rods and seals are adequately masked before painting.

e) Ensure blocks and stands are shifted so that all areas of the hull are properly prepared and painted.

D] SPECIFIC WORK TASKS ON R2509:

1] Replace rubrail Remove the existing rubber rubrail entirely and clean the hull surface beneath it. Replace with new rubrail of the same or functionally similar material. Molded inserts will be used in the corners. All mechanical fasteners used will be 304 stainless steel.

2] Replace windshields Remove the existing two windshields and clean al surfaces beneath the flanges. Provide and install new and unused windshields of the same size, shape, construction, and functionality. Ensure all fasteners used are 304 stainless steel, and the new windshields are properly bedded in sealant. Test the new windshields with a full stream of water through a ¾” hose to prove there are no leaks.

3] Replace cabin aft door Remove the existing cabin aft bulkhead door, and clean al surfaces beneath the flanges. Provide and install new and unused door of the same size, shape, construction, and functionality. Ensure all fasteners used are 304 stainless steel, and the new door frame is properly bedded in sealant. Test the new door with a full stream of water through a ¾” hose to prove there are no leaks.

4] Update emergency signal kit Inspect the emergency kits containing flares and smoke devices. Replace any items that will be out of date within one year with the same or equivalent devices.

5] Add PFDs Provide four (4) each new and unused Mustang HIT™ model MD3184-02 inflatable PFDs with harnesses, and position these in the main cabin so FKNMS staff can store them.

E] SPECIFIC WORK TASKS ON R3002:

a) Remove the vessel from the trailer to allow full access to the bottom for cleaning and painting. Ensure that the vessel is blocked and secured in accordance with standard practice for this vessel type and size.

b) Pressure wash and scrape to clean the bottom of the hull below the waterline, and include cleaning of engine lower units, stern platform supports, and thru-hull fittings. Do not damage any existing bottom paint. Clean transducers with a non-metallic brush, taking care to not mar the emitting surface in any way.

2] Overcoat bottom paint

a) Sand or chemically remove all failed or failing anti fouling coating on the underwater hull of the vessel.

b) Tape off waterline.

c) Prepare and prime the hull, and apply one coat of Pettit Ultima SR60 blue 1032 antifouling paint (or equal) to the hull below the waterline, with an extra coat applied at the waterline to extend six inches below the waterline.

d) Prep and paint the trim tabs, engine brackets, and associated submerged hardware on the transom. Ensure the ram cylinder rods and seals are adequately masked before painting.

e) Ensure blocks and stands are shifted so that all areas of the hull are properly prepared and painted.

G] OTHER INFORMATION

1] IT Security Requirements The Certification and Accreditation (C&A) requirements of 48 CFR 1352.239-73 do not apply, and a Security Accreditation Package is not required. The Contractor will not be accessing US government computers or IT systems for this effort. The Contractor will not be accessing any information that is not within the public domain for this effort. The contractor will not be processing, transmitting or storing privileged access information (i.e., non-public) in carrying out the tasks of this contract.

2] Contacts Primary Contact Jacqueline Laverdure 305-767-3161 Jacqueline.laverdure@noaa.gov

Technical point of contact Chad Stolka 305-360-2716 Chad.stolka@noaa.gov

Alternate technical point of contact Carey Jung 910-547-0202 Carey.jung@noaa.gov

File details come from the government source that posted it. Updated .