This document is a Scope of Work (SOW) for repairing a JLG 1350SJP Boom Lift (Serial #0300127963) located at Duke Aerial in Council Bluffs, IA. The repair involves comprehensive maintenance including replacing control panel decals, hydraulic hose lines, and seal kits to ensure safe and proper equipment functionality. Specific repair tasks include pre-work inspection, removing and installing new manufacturer-approved decals, replacing eight hydraulic/brake hose lines, installing five hydraulic seal kits, and conducting thorough testing and calibration.
The related federal contract opportunity is a pre-solicitation market research effort by the 55th Contracting Squadron at Offutt Air Force Base in Nebraska, under the Department of the Air Force Air Combat Command. The solicitation (FA4600_JLGRepair) is seeking information about repair services for a JLG boom lift, with the SOW providing detailed specifications for the required maintenance and repair work. Safety compliance with OSHA regulations, provision of documentation, and a warranty are key requirements for the contractor performing the equipment repairs.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
1. Project Title: JLG 1350SJP SERIAL# 0300127963 Repair
2. Equipment:
· Equipment Type: JLG 1350SJP Boom Lift
· Serial Number: 0300127963
· Location of Equipment: Duke Aerial, 3400 Nebraska Ave. Council Bluffs IA 51501 712-366-1800
3. Purpose:
The purpose of this project is to replace the existing control panel decals, hose lines, and seal kits on the JLG 1350SJP Serial #0300127963 boom lift. The control panel requires new decals (part# 1705744, 1705973, 1705174, 1705745,1702565, 1702566, 1705171) to ensure safe operation of the equipment. This also includes the replacement of 5 seal kits (part# 2902257, 7017159, 1001174325) and 8 new hose lines (part# 2753769, 2753770, 2753756, 2753715) to ensure proper functionality.
4. Scope of Work:
The contractor shall provide all labor, tools, equipment, and materials necessary to complete the following tasks:
· 4.1. Pre-Work Inspection and Documentation:
· Thoroughly inspect the existing control panel and document all visible damage or issues. Take photographs as needed.
· Verify the correct replacement control panel decals based on the equipment serial number.
· Verify the correct replacement of 5 seal kits and 8 hose lines based on the equipment serial number.
· Review the JLG service manual and any relevant technical bulletins related to control panel replacement on this specific model.
· Perform a pre-operation inspection of the machine to document its overall condition before work begins.
· Disconnect the machine's batteries and tag out/lock out the machine per company safety policy and OSHA standards.
· 4.2. CONTROL PANEL DECAL REPLACEMENT
· Remove existing worn/damaged control panel decals
· Clean control panel surfaces to ensure proper adhesion
· Install new manufacturer-approved control panel decals
· Part# 1705744, 1705973, 1705174, 1705745,1702565, 1702566, 1705171
· Verify all safety warnings and operational instructions are clearly visible
· Ensure decals meet ANSI/SIA standards for aerial work platforms
· 4.3. HYDRAULIC HOSE AND BRAKE LINE REPLACEMENT
· Replace eight (6) hydraulic hose lines and (2) brake hose lines with new assemblies:
· Part# 2753769 (3)
· Part# 2753770 (2)
· Part# 2753756 (1)
· Part# 2753715 (2-Brake line)
· Remove old hose lines following proper depressurization procedures
· Inspect hydraulic fittings and connections for wear/damage
· Install new hose lines with proper torque specifications
· Test all hydraulic connections for leaks
· 4.4. SEAL KIT REPLACEMENT
· Replace five (5) hydraulic seal kits:
· Part# 2902257 (3)
· Part# 7017159 (1)
· Part# 1001174325 (1)
· Disassemble hydraulic cylinders as required
· Clean all components and inspect for wear
· Install new seals per manufacturer specifications
· Reassemble cylinders with proper torque values
· 4.5. TESTING & COMMISSIONING
· Perform complete hydraulic system pressure test
· Conduct operational test of all boom functions
· Verify proper operation of all controls
· Check for hydraulic leaks throughout system
· Complete pre-delivery inspection checklist
· Calibrate the control panel according to the JLG service manual specifications. This may involve adjusting potentiometers or using diagnostic software.
· Check and adjust all safety interlocks and limit switches associated with the control panel.
· Document all test results and calibration settings.
5. Deliverables:
· Working JLG 1350SJP boom lift with a fully functional and legible control panel.
· Documentation of all work performed, including:
· Pre- and post-installation inspection reports.
· Wiring diagrams (if applicable).
· Calibration settings and test results.
· List of any parts used.
6. Safety:
· The contractor shall comply with all applicable OSHA regulations and safety procedures.
· The contractor shall provide all necessary personal protective equipment (PPE) for their employees.
· The contractor shall conduct a job safety analysis (JSA) before beginning work.
· The contractor shall be responsible for ensuring the safety of their employees and the equipment.
· All work will be performed in a manner to minimize the risk of damage to the equipment or injury to personnel.
7. Warranty:
· The contractor shall provide a warranty from the date of completion.
8. Acceptance:
· Upon completion of the work, the owner/client will inspect the equipment and either accept the work or provide a written list of any deficiencies.
· The contractor shall correct any deficiencies in a timely manner.
· Acceptance of the work constitutes agreement that the work has been performed in accordance with this scope of work.