This document is a Statement of Work (SOW) for the repair of the Industrial Waste Processor (IWP) oven body located in Building 1770. The SOW outlines the requirements for removing and replacing rusted sections of the oven body, including the ceiling, sides, and vertical beams. Key details include:
The period of performance should not exceed 60 calendar days after award. The contractor is required to remove oven insulation, repair any cracks, replace the oven insulation, and paint the new weld beads. The contractor must also ensure that any existing conduit, piping, and instrumentation are not damaged during the repair work. The contractor shall provide all equipment and materials, and submit a plan for approval prior to beginning the work.
The related federal contract opportunity is a Sources Sought synopsis for the IWP Oven Body Repair, issued by the Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division (NSWC IHEODTD). Interested sources must provide company information and email their response submissions by September 12, 2024. This synopsis does not constitute a Request for Proposal, and no award will be made as a result of this market survey.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 1770 Industrial Waste Processor (IWP) Oven Body Repair Scope of Work
· Repair rusted portions of IWP oven body. Period of performance should not exceed 60 calendar days after award.
· Remove oven insulation to expose critically rusted areas.
· Remove rusted sections from existing oven body roof and sides.
· Ensure existing conduit, piping, and instrumentation is not damaged.
· When necessary, work with NSWC IHD personnel to remove conduit, piping, or instrumentation to avoid damage.
· Remove the rusted metal (both sheet metal and structure) on the oven ceiling on the half of the oven that is located outside as seen in figure 1.
Figure 1
· Remove all additional metal needed to ensure effective welds on the ceiling or sides.
· Weld in replacement steel as needed.
· Replacement steel should be at least the thickness of the existing material.
· Repair any cracks on exterior. Currently one identified crack below the large burner as seen in Figure 2.
Figure 2
· Repair lower portion of vertical beams. As shown in, but not limited to, figure 3.
· Clean
· Splice in support as needed.
Figure 3
· Make additional corrections as needed.
· Replace oven insulation with new as needed, in kind when possible. When not possible, replace with same R value or greater.
· Paint new weld beads, at a minimum, with temperature resistant paint.
· Provide the same portholes or other features as original structure.
· Return the oven to original configuration if any damage occurs during work.
· Contractor shall provide all equipment and materials.
· Contractor shall provide a plan for approval prior to work being completed.