SOW_IPDI-R45_mk77__BD2 COPY.pdf

PDF 244 KB Posted

Attached to
R45 & IPDI M21 Ingredients
Solicitation number
N0017426Q1072
Issued by

About this file

This is a Performance Work Statement for manufacturing Isophorone Di-Isocyanate (IPDI) curing agent and HTPB R45M. The contractor shall fabricate, inspect, test, and deliver 80 pounds of conditioned IPDI in accordance with MIL-C-85498(AS), Type II and 820 pounds of conditioned HTPB R45M in accordance with WS 20700 Type I within a 6-week lead time after receipt of order. All deliverables must be packaged and ready for use, with IPDI packaged in 40-pound cans and R45M in 410-pound drums, labeled with contract number, military specification number, and lot number. Each material shall be manufactured from a single homogeneous lot, with single continuous production runs or batches permitted to meet multiple line items.

The contractor must maintain quality systems adhering to ISO 9001:2015 standards and implement processes for inspection, testing, and nonconforming material disposition throughout contract duration. Calibration of measuring and testing equipment shall comply with ANSI/NCSL Z540.3 or ISO/IEC 17025 standards. The contractor shall provide Safety Data Sheets per DI-SAFT-82112 (CDRL A001) and Certificates of Compliance and Analysis per DI-MISC-82386 (CDRL A002) for each production lot, including chemical and physical properties testing and workmanship verification per applicable specifications. Government acceptance is determined by sample testing at the destination in Indian Head, Maryland, with testing completed within 30 days of receiving all documentation. The contractor must maintain a counterfeit material prevention program in accordance with SAE AS6174A and notify the Contracting Officer if materials cannot be obtained from authorized suppliers. Any nonconforming deliverables identified by the Government must be reported within one working day, with contractor disposition provided within one working day.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUFACTURING OF IPDI AND R45M

PERFORMANCE WORK STATEMENT

1.0 Scope of Work

The requirements in this document contain the information necessary to provide Curing Agent, Isophorone Di-Isocyanate and HTPB R45M.

2.0 Applicable Documents

2.1.1 General Specifications

American National Standards Institute (ANSI)/National Conference of Standards

Laboratories (NCSL) Standards:

ANSI/NCSL Z540.3 Requirements for the Calibration of Measuring and Test Equipment

Department of Defense Specifications

MIL-C-85498(AS),

Type II

Curing Agents, Dimeryl-Di-Isocyanate and Isophorone Di-Isocyanate

MIL-STD-129

WS 20700

Marking for Shipment and Storage

HTPB R45M

International Organization for Standardization (ISO)/International Electrotechnical

Commission (IEC) Standards:

ISO 9001 Quality Management Systems

ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration

Laboratories

Society of Automotive Engineers (SAE) Standards:

SAE AS6174 Counterfeit Material; Assuring Acquisition of Authentic and

Conforming Material

Formatted Table

2.1.2 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General

The Contractor shall fabricate, inspect, test, and deliver 80 lbs of conditioned Isophorone Di-

Isocyanate (IPDI) in accordance with MIL-C-85498(AS), Type II and 820lbs of conditioned

HTPB R45M in accordance with WS 20700 Type I. Deliverables shall be packaged and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture, test, and inspect the deliverables, as well as provide data as detailed herein.

3.1.1 Deliverable Lot Homogeneity

Each material shall be made from one single homogeneous lot. A single continuous production run or batch may be used to meet several deliverable line items.

3.1.2 Safety Data Sheet

The Contractor shall provide a SDS in accordance with DI-SAFT-82112 per CDRL A001 for each deliverable lot.

3.2 Test and Inspection

The Contractor shall maintain and control processes to inspect and test deliverables as described in this PWS. These processes should cover all phases from the ordering of the material to the

Government acceptance of the finished product.

3.2.1 Product Certification

The Contractor shall submit a Certificate of Compliance in accordance with DI-MISC-82386 per CDRL A002 to accompany the shipment of each production lot, as required by Table 1. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.

The Contractor shall submit a certificate of analysis/test in accordance with DI-MISC-82386 per CDRL A002 showing the production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table

1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate.

Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:

“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”

Table 1: Certification Requirements

Order Test Requirement

Certificate Specification Location

MIL-C-85498(AS)

Type II

Chem & Phys

Properties MIL-C-85498(AS), Type II Para 3.2 Analysis

Workmanship MIL-C-85498(AS), Type II Para 3.6 Compliance

WS 20700 Type I

Chem & Phys

Properties WS 20700, Type I Para 3.2 Analysis

Workmanship WS 20700, Type I Para 3.4 Compliance

3.3 Quality Control

3.3.1 Quality System and Quality Control Processes

The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of Para. 4.5. ISO 9001:2015 standards.

The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.

3.3.2 Calibration of Measuring and Testing Equipment

Calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of either ANSI/NCSL Z540.3 or ISO/IEC 17025.

3.3.3 Acceptance of Product

Final acceptance of production deliverables will be determined by Government sample testing and certification verification at Government destination for each deliverable line item. The

Government shall complete sample testing within 30 days of receipt of all documentation and deliverables relevant to the line item in question.

The Government shall prepare a 1-quart composite sample from deliverable containers. The sample shall meet the requirements of Table 2. The Government reserves the right to perform additional testing to verify acceptability, which may include testing at other facilities.

Table 2: Government Acceptance Test Requirements

Order

Test Requirement

Specification Location

Physical and Chemical

Properties

MIL-C-5498(AS),

Type II Para 3.2

Workmanship

MIL-C-85498(AS),

Type II Para 3.6

Physical and Chemical

Properties WS 20700, Type I Para 3.2

Workmanship WS 20700, Type I Para 3.4

3.3.4 Government-Identified Nonconformity Reporting Procedures

The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.

3.4 Packing and Shipping

The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with MIL-C-85498(AS), Type II , Para 5.1 and Para 5.2 and WS 20700, Type I, Para

5.1 and Para 5.2 to prevent any potential damage during transport. Specifically, IPDI will be packaged in 40-lb cans, R45M will be packaged in 410lb drums and labeled with at minimum the contract number, mil spec number, and lot number.

3.5 Counterfeit Material

The Contractor shall maintain a counterfeit material prevention program in accordance with SAE

AS6174A, or comparable. The Contractor shall notify the Contracting Officer (KO) if material cannot be obtained from an authorized supplier.

4.0 Deliverables

The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the

Contractor’s representative authorized to make such certification.

Table 3: CDRL Deliverables

CDRL Spec Section Title

A001 DI-SAFT-82112 3.1.2 Safety Data Sheet (SDS) Report

A002 DI-MISC-82386 3.2.1 Certificate Data Report (COA/COC)

4.1 Deliveries

The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination. Lead times listed below represent the maximum allowable delivery timeframe; early deliveries are permitted.

Table 4: Material Deliverables

Item Year Chemical Qty UOI Lead Items

0001 Base IPDI 80 LBS 6 wks

ARO

0002 Base R45M 820 LBS 6 wks Aro

After receipt of order (ARO)

Delivery address provided below: (Provided once awarded)

Indian Head, MD 20640

File details come from the government source that posted it. Updated .