SOW Instron 764 CIP Retrofits Rev1 No Buildings Final 6-29.docx
DOCX document 36 KB Posted
- Attached to
- Mechanical Props Suite Replacement
- Solicitation number
- N00174-26-SIMACQ-10-0047
About this file
This is a Statement of Work (SOW) for the purchase and installation of Instron electro-mechanical test frame retrofit packages and associated equipment at the Naval Surface Warfare Center Indian Head Division (NSWC IHD).
The SOW specifies delivery and installation of five 6800 Series Instron EM system retrofit packages for five distinct system IDs (5965U4687, 5966U4688, 5966U4689, 5967S2737, and 5985U4690). Each retrofit package includes replacement of the machine's motor, power amplifier, motor-to-gear drive belt system, control electronics, data acquisition electronics, software, and a TAA-compliant PC. The contractor must also deliver and install five 3119-600 Series compatible environmental chambers matched to existing dimensions and power requirements, and five AVE3 video extensometers (each with 16mm and 6mm focal length lenses). Additional equipment includes one torsion add-on kit 3.0 for System ID 5967S2737, one hydraulic pump capable of replacing an existing MTS Model 506.02E unit with minimum 6.4 gpm at 3000 psi capacity interfacing with 460V 60Hz 3-phase power, one closed-loop chiller system for the hydraulic pump, and one remote start/stop system. The contractor must provide the latest version of Bluehill Universal software for all test frames and Bluehill Central for centralized database connectivity.
Services required include basic user training upon equipment installation, optional lifetime support plan availability, factory-trained technician installation per manufacturer specifications, shipping of all parts, post-repair system verification and calibration, and standard commercial warranty coverage for all installed components. The contractor must coordinate base access in advance with the Technical Point of Contact and comply with Department of Defense OPSEC requirements, including completion of government-approved OPSEC awareness training. The Period of Performance is six months from date of award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For Purchase of Instron Electro-Mechanical (EM) Test Frame Retrofit Packages
INTRODUCTION
The Naval Surface Warfare Center Indian Head Division (NSWC IHD) requires the purchasing of five (5) 6800 Series Instron EM system retrofit packages, five (5) environmental chambers, and five (5) AVE3 video extensometers, one (1) torsion add-on kit, one (1) hydraulic power unit, one (1) closed-loop chiller system, and one (1) remote start/stop system.
1.0 SCOPE
This Statement of Work describes and defines the Parts and Services requirements for the installation of Instron EM system retrofit packages, environmental chambers, and video extensometers. This Statement of Work also describes and defines the Parts and Services requirements for the installation of Instron hydraulic equipment.
2.0 REQUIREMENT
2.1 Equipment
The Contractors shall deliver and install, the following:
1. 6800 Series Instron EM system retrofit package for System ID 5965U4687
a. Includes replacement of the machine's motor, power amplifier, motor to gear drive belt system, control electronics, data acquisition electronics, software, PC (TAA Compliant, TMP 2.0).
2. 3119-600 Series Compatible Chamber for System ID 5965U4687
a. Matches existing environmental chamber dimensions, power requirements, and mounting position.
3. AVE3 video extensometer for System ID 5965U4687
a. Includes 16mm Focal Length Lens and 6mm Focal Length Lens
4. 6800 Series Instron EM system retrofit package for System ID 5966U4688
a. Includes replacement of the machine's motor, power amplifier, motor to gear drive belt system, control electronics, data acquisition electronics, software, PC (TAA Compliant, TMP 2.0).
5. 3119-600 Series Compatible Chamber for System ID 5966U4688
a. Matches existing environmental chamber dimensions, power requirements, and mounting position.
6. AVE3 video extensometer for System ID 5966U4688
a. Includes 16mm Focal Length Lens and 6mm Focal Length Lens
7. 6800 Series Instron EM system retrofit package for System ID 5966U4689
a. Includes replacement of the machine's motor, power amplifier, motor to gear drive belt system, control electronics, data acquisition electronics, software, PC (TAA Compliant, TMP 2.0).
8. 3119-600 Series Compatible Chamber for System ID 5966U4689
a. Matches existing environmental chamber dimensions, power requirements, and mounting position.
9. AVE3 video extensometer for System ID 5966U4689
a. Includes 16mm Focal Length Lens and 6mm Focal Length Lens
10. 6800 Series Instron EM system retrofit package for System ID 5967S2737
a. Includes replacement of the machine's motor, power amplifier, motor to gear drive belt system, control electronics, data acquisition electronics, software, PC (TAA Compliant, TMP 2.0).
11. 3119-600 Series Compatible Chamber for System ID 5967S2737
a. Matches existing environmental chamber dimensions, power requirements, and mounting position.
12. AVE3 video extensometer for System ID 5967S2737
a. Includes 16mm Focal Length Lens and 6mm Focal Length Lens
13. Torsion Add-On Kit 3.0 for System ID 5967S2737
14. 6800 Series Instron EM system retrofit package for System ID 5985U4690
a. Includes replacement of the machine's motor, power amplifier, motor to gear drive belt system, control electronics, data acquisition electronics, software, PC (TAA Compliant, TMP 2.0).
15. 3119-600 Series Compatible Chamber for System ID 5985U4690
a. Matches existing environmental chamber dimensions, power requirements, and mounting position.
16. AVE3 video extensometer for System ID 5985U4690
a. Includes 16mm Focal Length Lens and 6mm Focal Length Lens
The Contractors shall deliver and install, the following:
1. Hydraulic Pump
a. Capable of fully replacing functionality of existing MTS Model 506.02E Hydraulic Pump
i. Meet or exceed flow capacity of 6.4 gallons per minute (gpm) at 3000 psi.
ii. Interface with established 460V 60Hz 3-phase power supply
2. Closed-loop Chiller for Hydraulic Pump
a. Capable of cooling hydraulic to allow for continuous operation
3. Start/Stop kit for Hydraulic Pump
2.2 Software
The Contractors shall provide the latest version of Bluehill Universal for all test frames, as well as Bluehill Central to allow all test frames to connect to a central database.
2.3 Services
The Contractors shall provide a basic user training course to all personnel once the equipment has been installed. The Contractors shall also provide an option for a lifetime support plan.
2.4 Shipping
The cost of shipping of parts shall be included.
2.5 Technician Certification
The instrument shall be installed in accordance with the manufacture’s specification by factory-trained technicians.
2.6 Software / Hardware
Updated software and hardware shall be included.
2.7 Post-Repair System Survey
Upon completion of parts installation and services, the system passes all manufacturer verification and calibration checks.
3.0 WARRANTY
All components installed by the Contractor shall be covered by the Standard Commercial warranty.
4.0 SECURITY REQUIREMETS
The Contractor shall coordinate base access in advance of scheduled Installation with the Technical Point of Contact.
5.0 PERIOD OF PERFORMANCE
The Period of Performance shall be six (6) months from date of award.
6.0 Operations Security (OPSEC) Requirements
Contractor personnel are subject to applicable provisions of Department of Defense Manual 5205.02-M, Enclosure 6 and NSWC IHD 3070.3D OPSEC Program. Contractor personnel supporting this contract/task order must complete government approved or provided OPSEC awareness training and be prepared to provide completion certificates as requested by the Government. OPSEC education and training may be accomplished through established programs within the DoD Component, using external resources such as the Director of National Intelligence (DNI) and the Defense Security Service Academy, or a combination (i.e. https://securityawareness.dcsa.mil/opsec/index.htm). Contractor personnel may have access to government Critical Information (CI), Indicators and Observables that may indirectly disclose CI. CI includes but is not limited to ship movements and schedules, weapons and sensor system installations, capabilities, and configurations, specific platform installations and characteristics, test schedules, deficiencies, and vulnerabilities. Indicators and Observables may include but are not limited to: outdoors system testing; ship's external hull or superstructure modifications; shipboard equipment, ordnance, weapons, fuels, and/or stores loading/unloading operations, and/or personnel or aircraft embarkation. No CI, Indicators, or Observables may be divulged to third parties (including other company employees who are not subject to this contract/task order) without approval of the local command Security Officer, OPSEC Officer, or the NSWC IHD OPSEC Program Manager.