This is a Scope of Work document for a federal contract opportunity issued by the BIA (Bureau of Indian Affairs) Western Regional Office in Phoenix, Arizona, on behalf of the Eastern Nevada Agency Facilities Department in Owyhee, Nevada.
The project requires a licensed contractor to install a fire-rated suspended acoustic ceiling system in three small interior commercial rooms within the Duck Valley Juvenile Detention Center located at 488 Transfer Road, Owyhee, Nevada. The total work area is approximately 416 square feet across three rooms: an 8-foot by 16-foot Electrical Room, a 12-foot by 12-foot Riser Room, and a 12-foot by 12-foot Maintenance Room. The contractor must provide all labor, materials, supplies, and equipment necessary for performance and completion, with all materials to be new and of good quality unless otherwise agreed in writing. Scope items include layout and installation of wall angle/perimeter trim, main and cross tees, and hanger wires; exact seismic bracing as required by fire and building codes; layout and leveling of the ceiling grid to maintain consistent ceiling height; coordination with BIA maintenance worker Earl Steele for installation of lighting fixtures, HVAC diffusers, vents, exhaust fans, and fire sprinkler heads; final installation of fire-rated ceiling tiles after all mechanical, electrical, and fire-related components are installed and approved; and cleanup of installation debris. The contractor is responsible for installing the ceiling grid system and leaving it open for the BIA maintenance worker to complete electrical, HVAC, fire sprinkler, and low-voltage work. The place of performance is 488 Transfer Road, Duck Valley Juvenile Detention Center, with the BIA Facilities Department duty station located at 1324 Justice Road, Owyhee, Nevada 89832.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140A1126Q0032.pdf | ||
| IA_-_IEE_Representation_Form.pdf | ||
| DOL_-_NV20250035_1_2_26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Region: BIA Western Regional Office, Phoenix, AZ
Agency: Eastern Nevada Agency, Facilities Department, Owyhee, Nevada
Project Overview:
The BIA Facilities Department is requesting services from a licensed contractor to provide labor and standard installation materials to install a fire-rated suspended acoustic ceiling system in three (3) small interior commercial rooms within the Duck Valley Juvenile Detention Center located at 488 Transfer Road in Owyhee, Nevada, Elko County. The BIA Facilities Department duty station is located at 1324 Justice Road, Owyhee, Nevada 89832.
Scope of Work and Objective:
The scope of work will include layout, installation of ceiling grid system, coordination with other trades, and final placement of ceiling title after all the work is completed. The area of work is approximately 416 square feet in the commercial building. The scope of work includes the following:
Wall angle/perimeter trim, main and cross tees and hanger wires Exact seismic bracing where required by fire and building codes Layout and leveling of ceiling grid to maintain consistent ceiling height across all rooms Coordinate with maintenance worker for light fixtures, HVAC diffusers, vents, exhaust fans, and fire sprinkler heads Final installation of fire-rated ceiling tiles after all above-ceiling mechanical, electrical, and fire-related components are installed and approved Clean-up of installation debris related to ceiling work
Coordination of Trade and Sequencing:
Electrical, HVAC, fire sprinklers, and low voltage work must be performed by Earl Steele, BIA maintenance worker.
The contractor will:
Install ceiling grid system Leave ceiling open for the BIA Maintenance worker to install lighting, vents, and related components.
Features and Specifications:
1. Electrical Room 8 feet by 16 feet
2. Riser Room 12 feet by 12 feet
3. Maintenance Room 12 feet by 12 feet
Materials and Labor:
The contractor will provide all materials, supplies, equipment, services, and labor necessary for the performance and completion of the contract, unless otherwise agreed in writing. All materials will be new and of good quality, unless otherwise agreed in writing.
Photo of Maintenance and Riser Room:
Maintenance Rooms Ceiling Photo 1
Maintenance Room Photo 2
Riser Room Ceiling Photo 1
Riser Room Ceiling Photo 2
Place of Performance:
The place of performance shall be at 488 Transfer Road, Duck Valley Juvenile Detention Center.
| SCOPE OF WORK |
| Region: BIA Western Regional Office, Phoenix, AZ |
| Agency: Eastern Nevada Agency, Facilities Department, Owyhee, Nevada |
| Project Overview: |
File details come from the government source that posted it. Updated .