This Statement of Work (SOW) details maintenance services for Ingersoll Rand air compressors and dryers at Benet Laboratories in Watervliet, NY. The contract covers five air compressors and three dryers located in Buildings 110, 112, and 121, requiring comprehensive preventative maintenance including diagnostic checks, filter changes, coolant replacements, equipment lubrication, and operational testing of specific models such as HPXE125-2S, UP6-15C-125, SSR-XP100, and 2545E10 compressors.

The maintenance contract is a sole-source procurement with Air Compressor Engineering Co., Inc., with a one-year period of performance from April 1, 2025, through March 31, 2026. Key requirements include reporting labor hours via the ECMRA website, obtaining a Certificate of Non-Disclosure from all contractor employees, and maintaining 100% compliance with planned maintenance objectives. The technical point of contact is Nathan Coryea, and the solicitation is issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal under solicitation number W911PT25Q0050.

View the file

Other files

File Type Posted
W911PT25Q0050.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Ingersoll Rand Air Compressors Maintenance

1.Background:
1.1Benét Laboratories requires maintenance of their Ingersoll Rand air compressors and dryers located in Bldg. 121, 112, and 110 following an incident and diagnostics to be able to perform dynamic hydraulic testing including acceptance testing of mortar baseplates, breech fatigue testing, and other testing of armament system components.
2.Applicable Documents: None
3.Scope/Objective:
3.1Provide maintenance service to Benét Laboratories for five (5) Ingersoll Rand air compressors and three (3) dryers for proper operation.
4.Requirements:
4.1The contractor shall provide on-site preventative maintenance service for the following equipment:
4.1.1Two (2) Ingersoll-Rand model HPXE125-2S rotary compressors located in bldg# 121
4.1.2One (1) Ingersoll-Rand model UP6-15C-125 rotary compressor located in bldg# 121
4.1.3One (1) Ingersoll-Rand model SSR-XP100 rotary compressor located in bldg.# 112
4.1.4One (1) Ingersoll-Rand model NVC1200A400 dryer located in bldg# 121
4.1.5One (1) Ingersoll-Rand model D85NC-A16-100 dryer located in bldg# 121
4.1.6One (1) Ingersoll-Rand model NVC400A400 dryer located in bldg#112
4.1.7One (1) Ingersoll-Rand model 2545E10 reciprocating compressor located in the north end of bldg#110 behind the Composites Lab
4.2The contractor shall perform maintenance to the Ingersoll Rand equipment, to include but not limited to:
4.2.1Perform all diagnostic checks
4.2.2Check all connections to the compressor and dryer units
4.2.3Lubricate equipment as needed
4.2.4Remove a coolant sample from each of three air compressors and send for analysis

NVC1200A400 Dryer

4.2.5Isolate and lock out/tag out unit
4.2.6Change pre-filter
4.2.7Change after-filter
4.2.8Change float traps in both filters
UP6-15C-125 Air Compressor
4.2.9Isolate and lock out/tag out unit
4.2.10Disassemble unit
4.2.11Remove leaking hoses
4.2.12Install new hoses
4.2.13Change out the oil filter
4.2.14Reassemble unit
4.2.15Test run unit and check for proper operation

SSR-XP100 Air Compressor

4.2.16Isolate and lock out/tag out unit
4.2.17Disassemble unit
4.2.18Change out the oil filter
4.2.19Reassemble unit
4.2.20Test run unit and check for proper operation
HXPE125-2S Air Compressors (2)
4.2.21Run units hot
4.2.22Isolate and lock out/tag out units
4.2.23Drain coolant from both air compressors
4.2.24Fill both units half way and run for 30-45 minutes
4.2.25Drain coolant from both air compressors
4.2.26Change coolant filter elements in both compressors
4.2.27Install new coolant (90 gallons of Ultracoolant)
4.2.28Test run units and check for proper operation

D85NC-A16-100 Dryer

4.2.29Isolate and lock out/tag out unit
4.2.30Change pre-filter
4.2.31Change after-filter
4.2.32Check afloat traps in both filters

2545E10 Air Compressor

4.2.33 Isolate and lock out tag out unit

4.2.34 Change air filter element

4.2.35 Change oil; ACEC to supply 3 qts of Type 30 Select

4.2.36 Inspect belts and check for proper tension

4.2.37 Grease main and fan motors as required

4.2.38 Inspect all air lines on unit

4.2.39 Inspect condensate drains for proper operation

4.2.40 Inspect electrical connections

4.2.41 Test run unit and check for proper operation

4.3 The contractor shall provide support to identify and order additional replacement hardware, if necessary, for proper system operation.

5.QASP:
Performance Objectives
Reference
Acceptable Quality Level (AQL)
Method of Surveillance
Preventative Maintenance
Para. 4.1 – 4.2
100%
Planned – Technical POC Review
Replacement Hardware
Para 4.3
100%
Planned
6.Special Requirements:
6.1Accounting for Contract Service:

6.1.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [Ingersoll Rand Air Compressors] via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil

6.1.2 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at: https://www.ecmra.mil

7.Period of Performance on this maintenance contract shall be for one year, 1 April 2025 through 31 March 2026.
8.Benet Technical Point of Contact is: Nathan Coryea.
9.Information Disclosure: A Certificate of Non-Disclosure shall be signed by all contractor employees working under this effort and returned to the COR prior to award. The contractor shall not release any information or data without the approval of the Government.