This document outlines a pre-solicitation notice for inbound mail operations support services. The Federal Emergency Management Agency intends to award an indefinite-delivery, indefinite-quantity contract for up to five years, with task orders issued on a firm fixed-price or cost reimbursable basis. The contract will utilize a small business set-aside with a NAICS code of 561431. The statement of work is attached describing the specifications. Interested parties must be registered in the System for Award Management database. Representations and certifications must be completed online at SAM.gov by December 30, 2020 in response to this requirement. All responsible sources may submit a proposal by this date. The solicitation and any amendments will be posted to FBO.gov, where prospective offerors are responsible for monitoring.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
DRAFT
Department of Homeland Security (DHS)
Federal Emergency Management Agency (FEMA)
STATEMENT OF WORK
Inbound Mail Operations Support
July 8, 2020
I. BACKGROUND
The Federal Emergency Management Agency (FEMA), a component of the U.S. Department of Homeland Security, is authorized, pursuant to the Robert T. Stafford Disaster Relief and Emergency Assistance Act, as amended (42 U.S.C. Chapter 68), to assist individuals and households following Presidentially declared disasters and emergencies. In cooperation with state governments, FEMA provides assistance to disaster victims in accordance with the Act. These programs receive extensive visibility from the highest levels of federal, state, and local governments and are continually reported on in the public media.
Disaster declarations and resulting assistance applications create a need to process large quantities of inbound applicant correspondence in a short timeframe. Privacy, accuracy, and timely delivery of services are required to ensure that the needs of the disaster applicant are met through the most expedient means possible.
FEMA has determined that contractor support services are the most efficient way to manage the inbound mail operations.
II. PURPOSE
This contract supports FEMA’s Individuals and Households Program (IHP) by providing readiness and surge resources for disaster applicants’ correspondence. This contract seeks to establish contractor mail operations with an adequate infrastructure and qualified, trained staff. The contractor operation shall be ready at the time of a declared disaster to begin accepting and processing inbound correspondence from disaster applicants in the designated geographical area(s) covered by each Presidential Declaration for Individual Assistance (IA) which is mailed to the FEMA facility in Hyattsville, Maryland. Whenever possible, FEMA will seek to provide the contractor with early notice of impending disaster declarations and projected volumes, but due to the nature of disaster activity this may not always be feasible. Therefore, the contractor shall make all necessary preparations and maintain adequate infrastructure to meet all requirements as they are received.
The processing of inbound mail includes mail pickup or receipt, document preparation, translation of non-English correspondence into English, scanning, tracking, filing, preparation of documents for National Archives and Records Administration (NARA) temporary storage of archive prepped documents, and, if needed, splitting of a fax/eCorrespondence document if more than one application is contained in a fax/eCorrespondence transmission.
III. SCOPE
The contractor shall provide all management, personnel, services, supplies, equipment (except for Government Furnished Equipment described below), and facilities necessary to operate a comprehensive, inbound mail processing operation including the scanning, digitization, translation, uploading of data to FEMA and preparation for archival of FEMA applicant mail and fax/eCorrespondence image review in accordance with the requirements of this SOW. Inbound applicant mail operations include pickup/receipt of all inbound mail from the United States Postal Service (USPS), UPS, DHL, FedEx, or other commercially provided source. The contractor shall process all mail in accordance with the service levels identified in this SOW [see Section 7, Performance Standards-Timeliness (Service Levels)].
The contractor shall be responsible for meeting Service Levels as identified in this SOW. Based on disaster activity, the rate of document arrival and workload volume will vary greatly. Holidays and weekends are considered regular calendar production days as required in order to ensure that Service Levels are met.
The contractor shall perform phase-in activities that ensure their ability to assume full performance on or before the end of the phase-in period. The phase-in shall include actions to minimize disruption and start-up requirements. The phase-in actions shall consider recruiting, hiring, training, security requirements, and any other special considerations.
The contractor shall be fully operational, including facilities, equipment, information technology, training, personnel and requisite supplies within ninety (90) calendar days from date of contract award. All contractor facilities and employees dedicated to FEMA contract obligations must be located within the continental United States (CONUS). Inbound correspondence from disaster applicants in geographical area(s) covered by each Presidential Declaration is mailed to the FEMA facility in Hyattsville, Maryland for pickup by the contractor.
Note: Phase-in activities and/or transition period is not applicable to incumbent contractor.
IV. TYPE OF CONTRACT
The contract will be a firm-fixed price IDIQ contract with task orders awarded for baseline work in the base year and any option year(s) FEMA chooses to award.
Surge workloads beyond baseline levels will be awarded as separate task orders and will be made on a per image basis CLIN.
V. PERIOD OF PERFORMANCE
Period of Performance: Base period of nine months, consisting of a three-month transition period, and a six-month full operations period, with four consecutive one-year option periods, exercised at FEMA’s discretion.
Note: Phase-in activities and/or transition period is not applicable to incumbent contractor.
VI. CONTRACT REQUIREMENTS
The contractor shall:
Pickup/receive, at the Hyattsville, Maryland FEMA Recovery Service Center (RSC), formerly known as National Processing Service Center (NPSC), or the U.S Post Office identified by the COR, all inbound applicant mail from a variety of public and private sources, including but not limited to USPS, UPS, DHL, FedEx on a regular, recurring basis, Monday through Saturday (Sunday if required to meet Service Levels).
X-Ray all inbound letters, flats, parcels, and other material entering the mail operation system upon receipt at the facility using Computed Tomography (CT) X-ray detection equipment. The
CT equipment shall presumptively classify scanned materials into a three-dimensional image for security assessment by the operators.
All inbound applicant mail documents are scanned except for those identified in Attachment A ”Job Guideline for Inbound Mail Special Handling”. Correspondence containing cash, checks, money orders, etc., shall be separated & handled in accordance with Attachment A.
Open mail and stamp with date and time of receipt.
Translate non-English correspondence to English, regardless of language, and scan the English translation and associated correspondence as one document.
Associate a document separator/identifier with each document/batch.
Import scanned documents into FEMA’s database using an import application approved by Cyber Security.
Import fax/eCorrespondence documents into FEMA’s database using an import application approved by FEMA Cyber Security.
Ensure scanned documents and imported faxes/eCorrespondence contain complete information for only one applicant (faxes/eCorrespondence containing information for more than one applicant shall be split into separate documents).
Ensure translations are true, accurate and formatted in accordance with Attachment E: “Job Guide for Translations”.
Ensure translated mail, faxes, and eCorrespondence include a copy of the translation and the original document.
Faxes/eCorrespondence will be available to the contractor via FEMA’s system of record and will not be faxed directly to the contractor. Ensure imported fax/eCorrespondence and mail images are legible, and with proper page orientation.
Ensure imported fax/eCorrespondence contain no blank or duplicate pages.
Provide copies of original documents not yet sent to the National Archive Records Center at the request of the COR in accordance with Attachment B. Copies should be identified as “Certified True Copy of Original Document # (enter doc ID#)”.
Re-scan identified documents at the FEMA COR’s or designee’s request.
Sort and file scanned documents and FEMA Form 90-69 B (Privacy Act Statement/Declaration of Citizenship), in accordance with Attachment B, “Job Guideline for Document Sorting, Filing and Archiving”. At the direction of the COR, completed/filed work six months of age or older will be properly shredded and disposed of, or will be scheduled for transition to the National Archives Records Administration (NARA) in 3-month intervals by the COR or designee’s request.
Provide production reports as outlined in Section 9 of this SOW.
Maintain hours of operation sufficient for accomplishing all requirements of this SOW.
Disruptions or problems affecting the contractor’s ability to meet daily performance standards and any security issues including privacy breaches shall be reported by the contractor to the COR within 30 minutes of identification.
Maintain a capability to process a minimum monthly volume of 50,000 images of inbound mail.
Surge conditions may require increased monthly production to process up to 1,250,000 images of inbound mail.
Maintain a capability to QC/review a minimum monthly volume of 100,000 fax/eCorrespondence images of inbound mail. Surge conditions may require increased monthly production of up to 1,700,000 inbound fax/eCorrespondence images.
Maintain a capability to process a minimum monthly translation volume of 400 inbound mail/fax/e-correspondence documents. Surge conditions may require increased monthly translation volume of up to 50,000 inbound mail/fax/eCorrespondence documents.
Process all mail that requires special handling. FEMA estimates the amount of mail requiring special handling to be approximately 1% of the inbound monthly mail documents. Attachment A describes special handling procedures.
High Priority Processing – The contractor shall, from time to time, at the request of FEMA provide for high priority processing. High priority processing requires the contractor to accelerate the service level for prepping, scanning, importing documents and usage of a unique identifier for tracking purposes. FEMA will advise the contractor in writing, no less than one day (24 hrs) prior to the need, with the estimated number of documents and the expected timeframe that they will arrive for processing.
Deliverables
The contractor shall provide a phase-in plan within 14 calendar days of award, detailing the schedule and necessary activities to begin contract performance in accordance with contract requirements.
The contractor shall provide a phase-out plan within 14 calendar days of request by the COR, detailing the schedule and necessary activities to meet all contract requirements through the end of the period of performance and end contract performance in a satisfactory manner.
The contractor shall provide a Continuity of Operations Plan (COOP) within 30 calendar days of award. This plan shall include procedures to ensure that operational support is available, without interruption, to support 50 percent of all capacity requirements. The plan shall also address the actions and timeframe required to regain 100 percent of the capacity requirements of the SOW. Finally, the plan shall include a complete description of the alternative mail operations site and, 1) a detailed breakdown of costs to maintain and operate the COOP site and, 2) a detailed breakdown of costs unexpended at the closed original facility. The COOP Plan must be approved by the COR.
Within 30 calendar days of award, the contractor shall submit two copies of the updated Quality Control Plan (QCP) to the COR (draft plan to be submitted with proposal). The QCP shall outline the contractor’s plan to ensure achievement of the performance standards of the SOW, as provided in Section 7 of this SOW. The QCP shall address identifying and correcting deficiencies, scheduled delivery of services, technical performance, and staff training. The COR will review and accept the QCP or return it for revision or implementation.
The contractor shall implement and maintain the COR-approved QCP.
The contractor shall establish and maintain an inspection system that ensures compliance with the contractor’s QCP and maintain a local file of all QCP inspections.
This file shall be available to the COR or designee at all times during the life of the contract.
Subsequent to award, any revisions to the QCP shall be submitted to the COR for review and approval.
VII. PERFORMANCE STANDARDS
The contractor shall perform all requirements outlined in this SOW and achieve the performance standards for each function of the operation as described below:
Service Levels Pick up mail and stamp with date and time of receipt from designated location.
Correspondence (including returned mail) received Monday through Saturday (Sunday if required to meet Service Levels) is prepped, scanned and uploaded within 48 hours of contractor receipt.
Inbound fax/eCorrespondence are processed/uploaded within 48 hours of receipt by the contractor.
Requests for copies of original documents shall be processed within 24 hours of the time received by contractor.
Correspondence requiring special handling is sorted and processed within 48 hours of contractor receipt.
Correspondence requiring translation is translated, prepped, scanned and uploaded within 72 hours of contractor receipt. Date and time of contractor’s original receipt of correspondence (mail/fax/eCorrespondence) begins the Service Level requirement.
Documents requiring rework/rescanning at the request of the COR shall be processed within 24 hours of contractor receipt.
Any Service Level may be temporarily extended by up to 48 hours with prior written approval from the COR.
Holidays and weekends are considered regular calendar production days in relation to Service Levels.
Quality
Batched documents are accurately marked with bar codes/batch identifiers (or in accordance with Government provided software) and identified 100 percent of the time.
The security of personally identifiable information is of the utmost importance to FEMA. Thus scanned documents and imported faxes shall contain complete information for only one applicant, 100 percent of the time.
Translations are true and accurate 99 percent of the time (with a minimum score of 95%) in accordance with Attachment E.
Translated mail, fax/eCorrespondence include copies of translation and original document 99 percent of the time.
Imported fax/eCorrespondence and mail images are legible, and with proper page orientation 99 percent of the time.
Imported fax/eCorrespondence contain no blank or duplicate pages 99 percent of the time.
Documents prepared for archiving will be boxed in accordance with Attachment B 99 percent of the time.
VIII. CONTRACT REQUIREMENTS
A. Contractor Provided Resources
The contractor is required to furnish all facilities, equipment (except for GFE), personnel, supplies (including file boxes that comply with NARA requirements), computers, communications, and other resources to achieve the requirements of this SOW.
The contractor shall provide a storage site that meets FEMA requirements, listed below, for temporary storage of federal records. When storing records temporarily, the contractor must abide by the following guidelines:
Ensure the records are located away from known risks such as water, fire, mold, etc.
Do not place boxes directly on the floor; place on pallets or shelves.
Do not store records in direct sunlight.
Storage areas should be well ventilated and insulated. Avoid storage areas that are too hot.
Store records so that they can be identified, located and retrieved easily.
B. Staffing
The contractor shall perform all recruiting, screening, hiring, and monitoring of staff under this contract.
The contractor shall provide supervisory/management personnel and quality assurance personnel required for effective management of the work.
The contractor shall train employees on processes, procedures, and performance standards identified in this SOW and any attachments hereto.
The contractor shall ensure personnel have met HSPD- 12 and NIST Pub 201 requirements prior to the employees having any access to a DHS information system or FEMA applicant information. See Attachment G for details.
The contractor shall comply with applicable Department of Labor (DOL) wage determinations and provide FEMA CO with access to payroll records for required monitoring.
The contractor shall maintain an updated listing of all contractor personnel working under this contract and provide a copy to the COR upon staffing changes. This listing must include personnel information, including but not limited to the following: the person’s full legal name, Social Security number, home address, contact phone, date of hire, date(s) of training completion, dates and results of security clearance (s), date of separation, and reason for separation.
No later than two weeks prior to start of performance, the contractor shall provide to the COR a listing of all personnel who will require logistical access to FEMA's IT network for performance of work under this contract.
All contractor supervisors, managers, quality assurance personnel must speak, read, and write English fluently.
Contractor IT Personnel:
The contractor shall identify an on-site information technology (IT) system security officer responsible for ensuring client privacy and confidentiality.
The contractor shall identify a minimum of two contractor personnel as points of contact for FEMA IT. These personnel will be responsible for working with FEMA IT personnel to resolve technical issues causing service disruptions.
C. Hardware, Software, Supplies and Data Services
The contractor shall:
Provide and maintain all necessary facilities, equipment, supplies and services to support document preparation, scanning, archiving, fax/eCorrespondence services and any other requirements under this SOW; e.g. NARA-approved archival boxes, document coversheets, office supplies, scanners, etc. (with the exception of FEMA provided GFE).
Provide and maintain security X-ray document scanning equipment necessary to ensure the appropriate protection of personnel, equipment, and facilities. See Attachment F, “Suspicious Mail or Packages”.
Provide workstation access for on-site FEMA representatives with the ability to access the Mail Management software during site visits. The contractor should estimate that FEMA representatives will make a minimum of 4 visits per year. The contractor shall provide workspace and telephones at the contractor’s provided site. Provide access to facsimile machines with send-and-receive capability, equipment to perform copying and printing, access to shipping and receiving, and standard office supplies for government administration of the contract.
Contractor shall submit proposed Cisco VPN concentrator specifications to FEMA IT security for approval. Provide a dedicated data connection exclusively for the purposes of achieving the requirements of this SOW, with a 5MB minimum with 20MB burst capability, 100MB recommended connection (physical interface capability for scanned data transmission). The scanning and importing functions require sufficient memory and bandwidth.
Provide FEMA network account requests in a CSV (comma-separated values) or XLS (Microsoft Excel spreadsheet) file with the following information in the specified column order:
legal last name, legal first name, Social Security number (SSN), facility location, and security clearance. All fields must be provided before an account will be created. Account creation requests should be submitted to COR or designated representative.
8.4 Compliance with Laws, Regulations and Manuals
The contractor shall be responsible for having a good working knowledge and technical understanding of the following laws, regulations and manuals pertaining to Official Mail and the DHS/FEMA Mail Management Program. Knowledge of laws, regulations and mail management procedures are necessary to operate a professional Mail Center for FEMA. Contractor personnel shall be trained in mail regulations and general mail management information.
Title 39, U.S.C., Sections 3202-3209 Title 18, U.S.C., Section 1719, "Franking Privilege" Title 41 Code of Federal Regulations (CFR), Chapter 102, Part 102-192 Title 39 CFR, United States Postal Service, Chapter I, Sub-chapter E - Restrictions on
Private Carriage of Letters, Part 310 and 320 GSA Bulletin, FPMR B-65, Archives and Records, "Mail Preparation and Economy" USPS Domestic Mail Manual USPS International Mail Manual Annual USPS letter, "Payment of Official Mail"
DHS MD 4300A
Upon request, the contractor shall provide to the COR copies of mail management manuals and Standard Operating Procedures (SOP) demonstrating the contractor’s adherence and understanding of the above guidance in performing the requirements and functions of this SOW.
The contractor shall maintain a clean and safe working environment in full compliance with applicable Occupational Safety and Health Administration (OSHA) standards.
Section 504 Requirements The Contractor/Provider shall comply fully with Section 504 of the Rehabilitation Act of 1973, as amended, which prohibits discrimination against qualified individuals with disabilities. No otherwise qualified individual with a disability shall, solely by reason of his or her disability, be excluded from participation in, be denied the benefits of, or subjected to discrimination under any program or activity for which the Contractor/Provider is awarded a contract and/or receives federal financial assistance from the Federal Emergency Management Agency. This includes, but is not limited to, providing reasonable accommodations and modifications to ensure effective communication access, physical access, and program access to all participants, including persons with disabilities. The Contractor/Provider shall incorporate this language in any subcontracts related to the provision of the FEMA public-facing program or activity.
Section 508 Requirements Section 508 of the Rehabilitation Act, as amended by the Workforce Investment Act of 1998 (P.L.
105-220) (codified at 29 U.S.C. § 794d) requires that when Federal agencies develop, procure, maintain, or use information and communications technology (ICT), shall be accessible to people with disabilities. Federal employees and members of the public with disabilities must be afforded access to and use of information and data comparable to that of Federal employees and members of the public without disabilities.
1. All products, platforms and services delivered as part of this work statement that, by definition, are deemed ICT or that contain ICT shall conform to the revised regulatory implementation of Section 508 Standards, which are located at 36 C.F.R. § 1194.1 & Apps.
A, C & D, and available at https://www.gpo.gov/fdsys/pkg/CFR-2017-title36-vol3/pdf/CFR- 2017-title36-vol3-part1194.pdf. In the revised regulation, ICT replaced the term electronic and information technology (EIT) used in the original 508 standards.
2. When developing or modifying ICT for the government, the contractor shall ensure the ICT fully conforms to the applicable Section 508 Standards. When modifying a commercially available or government-owned ICT, the contractor shall not reduce the original ICT Item’s level of Section 508 conformance.
3. When developing or modifying ICT that are delivered in an electronic Microsoft Office or Adobe PDF format, the contractor shall demonstrate conformance by providing Section 508 test results based on the Accessible Electronic Documents – Community of Practice (AED COP) Harmonized Testing Guidance at https://www.dhs.gov/508-testing.
4. When developing or modifying software that generates electronic content (e.g., an authoring tool that is used to create html pages, reports, surveys, charts, dashboards, etc.), the contractor shall ensure software can be used to create electronic content that conforms to the Section 508 standards.
5. Contractor personnel shall possess the knowledge, skills and abilities necessary to address the applicable revised Section 508 Standards for each ICT.
6. Exceptions for this work statement have been determined by DHS and only the exceptions described herein may be applied. Any request for additional exceptions shall be sent to the Contracting Officer and a determination will be made according to DHS Directive 139-05, Office of Accessible Systems and Technology, dated November 12, 2018 and DHS Instruction 139-05-001, Managing the Accessible Systems and Technology Program, dated November 20, 2018.
Instructions to Contractor
1. For each ICT Item that will be developed, modified, installed, configured, integrated, maintained, or hosted by the contractor pursuant to this contract, the contractor shall provide an acknowledgement of the Section 508 requirements and a detailed explanation of the Contractors plan to ensure conformance with the requirements. The Contractor shall also describe the evaluation methods that will be used to validate for conformance to the Section 508 Standards.
Acceptance Criteria
1. Before accepting items that contain Information and Communications Technology (ICT) that are developed, modified, or configured according to this contract, the government reserves the right to require the contractor to provide the following:
o Accessibility test results based on the required test methods.
o Documentation of features provided to help achieve accessibility and usability for people with disabilities.
o Documentation of core functions that cannot be accessed by persons with disabilities.
o Documentation on how to configure and install the ICT Item to support accessibility.
https://www.gpo.gov/fdsys/pkg/CFR-2017-title36-vol3/pdf/CFR-2017-title36-vol3-part1194.pdf https://www.gpo.gov/fdsys/pkg/CFR-2017-title36-vol3/pdf/CFR-2017-title36-vol3-part1194.pdf https://www.dhs.gov/508-testing o Demonstration of the ICT Item’s conformance to the applicable Section 508 Standards, (including the ability of the ICT Item to create electronic content – where applicable).
2. Before accepting ICT required under the contract, the government reserves the right to perform testing on required ICT items to validate the Contractor’s Section 508 conformance claims. If the government determines that Section 508 conformance claims provided by the Contractor represent a higher level of conformance than what is actually provided to the agency, the government shall, at its option, require the Contractor to remediate the item to align with the Contractor’s original Section 508 conformance claims prior to acceptance.
IX. REPORTING REQUIREMENTS
9.1 Daily reports
Daily reports are due to the COR by 9:00 a.m. EST Monday - Saturday unless otherwise approved in writing by the COR. Reporting content is as follows:
Inbound document (mail) count (including UPS, DHL, and other carrier package counts)
USPS
Priority/Certified Returned Mail Cumulative
Documents scanned Daily Cumulative Balance of inbound documents to be scanned
Images scanned Daily Cumulative
Documents released for import to FEMA Daily Cumulative Balance to be released to FEMA
Translated document count Daily Cumulative Documents to be translated
Number of fax/eCorrespondence images reviewed/removed/printed Daily Cumulative Balance left to be reviewed
Number of document copy requests processed Daily Cumulative Balance left to be processed
Mail received containing cash and amount thereof
Daily Cumulative
Mail received containing original legal documents Daily Cumulative
Images released for import to FEMA Daily Cumulative
Documents received for translation Daily
Documents sent to other locations (i.e. SBA, Finance, etc.)
Daily Cumulative
Number of archived boxes prepped for NARA Daily Cumulative
Sample Daily Report
Date Total Incoming
Mail Images
Scanned Documents
Scanned
Docs Remaining to be scanned
(MTD)
9069 B Processed for NARA
Total Documents Processed
Scanned Images Imported
Scanned Documents Imported
Documents Remaining to be Imported
Incoming Documents to be Translated
Translated Documents Validated
Documents Remaining to be Translated
Number of Fax Documents Reviewed
Number of Fax Images Reviewed
Number of Faxed Images Deleted
Faxed Images Removed for Translation
Number of eDocs Reviewed
Number of eDoc Images Reviewed
Number of eDoc Images Deleted eDoc Images Removed for Translation
0 371 371 Friday, May 01, 2020 Saturday, May 02, 2020 Sunday, May 03, 2020 Monday, May 04, 2020 Tuesday, May 05, 2020 Wednesday, May 06, 2020 Thursday, May 07, 2020 Friday, May 08, 2020 Saturday, May 09, 2020 Sunday, May 10, 2020 Monday, May 11, 2020 Tuesday, May 12, 2020 Wednesday, May 13, 2020 Thursday, May 14, 2020 Friday, May 15, 2020 Saturday, May 16, 2020 Sunday, May 17, 2020 Monday, May 18, 2020 Tuesday, May 19, 2020 Wednesday, May 20, 2020 Thursday, May 21, 2020 Friday, May 22, 2020 Saturday, May 23, 2020 Sunday, May 24, 2020 Monday, May 25, 2020 Tuesday, May 26, 2020 Wednesday, May 27, 2020 Thursday, May 28, 2020 Friday, May 29, 2020 Saturday, May 30, 2020 Sunday, May 31, 2020
MTD Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
INCOMING MAIL
Documents Processed Document Validation Translation Fax Split eDocuments
Date
USPS
Priority/ Certified
Return Mail IU
Non- USPS Translations
Special Handling
9069Bs for scanning
Total Incoming
Friday, May 01, 2020 Saturday, May 02, 2020 Sunday, May 03, 2020 Monday, May 04, 2020 Tuesday, May 05, 2020 Wednesday, May 06, 2020 Thursday, May 07, 2020 Friday, May 08, 2020 Saturday, May 09, 2020 Sunday, May 10, 2020 Monday, May 11, 2020 Tuesday, May 12, 2020 Wednesday, May 13, 2020 Thursday, May 14, 2020 Friday, May 15, 2020 Saturday, May 16, 2020 Sunday, May 17, 2020 Monday, May 18, 2020 Tuesday, May 19, 2020 Wednesday, May 20, 2020 Thursday, May 21, 2020 Friday, May 22, 2020 Saturday, May 23, 2020 Sunday, May 24, 2020 Monday, May 25, 2020 Tuesday, May 26, 2020 Wednesday, May 27, 2020 Thursday, May 28, 2020 Friday, May 29, 2020 Saturday, May 30, 2020 Sunday, May 31, 2020 MTD Total 0 0 0 0 0 0 0 0
Incoming Mail Scanning
Boxes Prepped for
NARA
Date Monetary Value
Original Legal Pieces
Pieces sent to Other locations
Total Special
Handling Pieces
Requests Received
Requests processed
Requests left to be processed
Archive Boxes Prepped for
NARA Booklets Rec.
Booklets Returned
Booklets On-hand
- - 0 Friday, May 01, 2020 Saturday, May 02, 2020 Sunday, May 03, 2020 Monday, May 04, 2020 Tuesday, May 05, 2020 Wednesday, May 06, 2020 Thursday, May 07, 2020 Friday, May 08, 2020 Saturday, May 09, 2020 Sunday, May 10, 2020 Monday, May 11, 2020 Tuesday, May 12, 2020 Wednesday, May 13, 2020 Thursday, May 14, 2020 Friday, May 15, 2020 Saturday, May 16, 2020 Sunday, May 17, 2020 Monday, May 18, 2020 Tuesday, May 19, 2020 Wednesday, May 20, 2020 Thursday, May 21, 2020 Friday, May 22, 2020 Saturday, May 23, 2020 Sunday, May 24, 2020 Monday, May 25, 2020 Tuesday, May 26, 2020 Wednesday, May 27, 2020 Thursday, May 28, 2020 Friday, May 29, 2020 Saturday, May 30, 2020 Sunday, May 31, 2020 MTD Total 0 0 0 0 0 0 0 0 0 0
SPECIAL PROCESSING
Special Handling Documents Document Copy Requests Applicant Guide Booklets
9.2 Weekly reports
Weekly reports shall contain all data in the daily reports and also include any quality control variances and issues.
9.3 Monthly Reports
The reporting period is the entire calendar month. Contractor monthly reports are due to the COR on the 1st day of the following month by noon ET, unless otherwise approved in writing by the COR. Report content is as follows:
Production Report Include all categories required in the daily reports, and, FEMA Form 9069-B/D documents received from inspectors (by disaster)
9.4 Ad Hoc reports
The contractor shall provide ad hoc reports (not more than 10 per month) at the request of the COR to track contractor and program performance.
Date Regular Mail Fax Split eDocs Hyattsville Total Fax Docs Downloaded
Fax Images Downloaded
Docs Remaining to be Reviewed eDocs Downloaded eDoc Images Downloaded
Docs Remaining to be Reviewed
0 0 Friday, May 01, 2020 - Saturday, May 02, 2020 - Sunday, May 03, 2020 - Monday, May 04, 2020 - Tuesday, May 05, 2020 - Wednesday, May 06, 2020 - Thursday, May 07, 2020 - Friday, May 08, 2020 - Saturday, May 09, 2020 - Sunday, May 10, 2020 - Monday, May 11, 2020 - Tuesday, May 12, 2020 - Wednesday, May 13, 2020 - Thursday, May 14, 2020 - Friday, May 15, 2020 - Saturday, May 16, 2020 - Sunday, May 17, 2020 - Monday, May 18, 2020 - Tuesday, May 19, 2020 - Wednesday, May 20, 2020 - Thursday, May 21, 2020 - Friday, May 22, 2020 - Saturday, May 23, 2020 - Sunday, May 24, 2020 - Monday, May 25, 2020 - Tuesday, May 26, 2020 - Wednesday, May 27, 2020 - Thursday, May 28, 2020 - Friday, May 29, 2020 - Saturday, May 30, 2020 - Sunday, May 31, 2020 - MTD Total 0 0 0 0 0 0 0 0 0
Translation Source Fax Split eDocs
TRANSLATION - FAX Split
X. FEMA’S RESPONSIBILITIES
FEMA’s designated COR will establish weekly meetings or conference calls with the contractor and/or its representatives to monitor performance and ensure specific work requirements are accomplished.
FEMA will perform periodic on-site quality/quantity checks with no prior notice to contractor.
These site visits will consist of personnel, physical and cyber security site surveys to ensure that the contractor is adhering to DHS/FEMA security requirements for handling and protecting sensitive information as well as programmatic service and quality reviews.
FEMA will monitor contractor operations to ensure physical access to FEMA servers and applicant information are restricted to authorized contractor personnel only.
FEMA will provide remote and onsite IT support, as required.
FEMA will provide a maximum of two subject matter experts to train contractor’s staff on use of FEMA’s software and special handling instructions for a period of up to three days. After this, the contractor shall be responsible for training mail center staff at its own expense.
XI. GOVERNMENT-FURNISHED SUPPLIES AND EQUIPMENT
FEMA will provide IT security awareness training to the contractor.
FEMA will furnish the following equipment, systems, and provisions:
Computers for connectivity to FEMA networks until the contractor’s proposed and supplied hardware is approved by FEMA Cyber Security, Certification and Accreditation.
Data connections to the FEMA Wide Area Network – through the use of FEMA-approved
VPN client installed on GFE.
Mail management software to load on scanner workstations until the contractor’s supplied software is approved by FEMA Cyber Security.
Any equipment provided for FEMA’s contract will be used exclusively by the contractor at the location(s) proposed for contract performance.
XII. DEFINITIONS
90-69B – Privacy Act Statement/Declaration of Citizenship: Single-page government signature form used by FEMA to collect disaster applicants’ acknowledgment of the Privacy Act and their declaration of citizenship status. A sample of this form is provided in Attachment A
Ad Hoc Reports: Reports required when the situation makes it necessary or desirable, rather than being arranged in advance or being part of a general plan. Ad hoc does not mean correcting / clarifying data presented in routine reports.
Applicant Guide/brochure – Help After a Disaster: Guide to the Individuals and Households Program: A program guide providing information to help the readers understand FEMA’s Individuals and Households Program.
Archiving: The process of filing and storing hard-copy documents submitted by disaster victims and field inspectors
COOP- Contingency of Operations Plan: A plan involving suitable backups, immediate actions and longer term measures for resuming production and responding to emergencies such as attacks, accidents, widespread employee illness in the workplace, or natural disasters.
Contingency plans are part of business resumption planning.
Document: A unique communication to include any supporting or amplifying information pertaining to a single applicant. May consist of one or more images.
Document Preparation: A prescribed process for preparing documents for subsequent mail handling; includes opening, sorting, and otherwise readying for subsequent handling within the mail operation.
Fax/eCorrespondence QC/Split: Quality check of inbound fax/eCorrespondence to ensure completeness and clarity of images as well as ensuring that only one applicant’s information is contained in a single file.
IHP – Individuals and Households Program: Program through which FEMA provides disaster assistance to individuals and households affected by a federally declared disaster. FEMA, under the authority of Section 408 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. §5174, and Title 44 of the Code of Federal Regulations, may provide financial assistance and, if necessary, direct services to eligible individuals and households who, as a direct result of a major disaster, have necessary expenses and serious needs and are unable to meet such expenses or needs through other means.
Image: One printed side of one page of paper.
NARA – National Archives and Records Administration: The government agency responsible for defining and administering the federal government’s records retention and management responsibilities.
NEMIS - National Emergency Management Information System: This FEMA-wide system of hardware, software, telecommunications, and applications provides the technology base for the collection and processing of information filed by individuals applying for federal disaster assistance.
RSC – Recovery Service Center: Formerly known as National Processing Service Center (NPSC); FEMA currently has three RSCs located in Virginia, Maryland, and Texas. The RSC is a centralized office established to consolidate the processing of disaster applications. Each RSC represents a combination of caller services, casework processing, and administrative functions.
SBA – Small Business Administration: A federal agency that assists homeowners, renters, and businesses with disaster loan assistance.
Special Handling: Refers to documents that must be separated from the inbound mail processing operation. The documents listed below all require unique processing described in Attachment A. The contractor must maintain an accountability log identifying counts and actions taken on each document type.
• Correspondence containing checks, money or valuables
• SBA loan packets
• Treasury questionnaires
• Forms 90-69 B (sent in by FEMA inspection contractors)
• Correspondence containing original legal documents, photos, videos, or other non-correspondence materials
• Non-English correspondence
• Priority Mail
• Returned Mail
• Cover Page providing specific Indexing instructions
Surge Operations: Occurs whenever the baseline operations’ quantities are exceeded.
XIII. ATTACHMENTS
A. Job Guideline for Inbound Mail Special Handling B. Job Guideline for Document Sorting, Filing & Archiving C. QC/Fax Split Instructions D. Mail Process Flow E. Job Guide for Translations F. Suspicious Package Handling G. Contractor Personnel Security Requirements H. Physical Security Requirements I. Cyber Security Requirements
Attachment A
Job Guideline for Inbound Mail Special Handling
Contents
1. Introduction
2. Instructional Guidance – Special Handling
A. Correspondence containing monetary value B. SBA loan packets
C. Treasury questionnaires D. Form 90-69 B (Privacy Act Statement/Declaration of Citizenship) E. Correspondence containing original legal documents, photos, videos, and non-correspondence materials F. Non-English Correspondence G. Priority Mail H. Returned Mail I. Cover Page providing specific Indexing instructions
3. Forms
A-1 Disaster Business Loan Application A-2 Disaster Home Loan Application A-3 Treasury Questionnaire A-4 Form 90-69 B A-5 Sample Letter (returning Original Documents – see 2.E)
1. Introduction
Disaster declarations create a need to process large quantities of inbound applicant correspondence in a short timeframe. Privacy, accuracy, and timely delivery of service are all required to ensure the needs of the disaster applicant are met through the most expedient means possible.
Processing of inbound mail includes, but is not limited to, receipt of USPS, UPS, DHL, FedEx, or other commercially provided correspondence; testing of inbound correspondence for security purposes;
prepping documents for scanning; translating non-English documents into English; scanning; preparing documents for archive at the National Records Center; and reviewing inbound faxes in a timely and quality manner.
The timeliness standard requires that mail be stamped with the date and time of receipt and exported to a FEMA specified location within 48 hours of receipt.
This document identifies expectations and provides guidance for processing of inbound USPS, UPS, DHL, FedEx, or other commercially delivered or provided correspondence.
2. Instructional Guidance – Special Handling
Once the mail has been x-rayed, it is ready to be opened, prepped, and sorted. Certain documents require special handling and are to be separated from the main-stream operation. The contractor is expected to maintain an accountability log identifying counts and actions taken, including if they were scanned or not scanned, for the document types identified below; these documents are:
Non-scanned items:
A) Correspondence containing checks, money or valuables.
B) SBA loan packets C) Treasury questionnaires D) Forms 90-69 B (sent in by FEMA inspection contractors)
E) Correspondence containing original legal documents, photos, videos, or other non-correspondence materials
Scanned Items:
F) Non-English Correspondence G) Priority Mail H) Returned Mail I) Cover Page Providing Specific Indexing Instructions
Items A) through I) are described below:
A) Correspondence containing monetary value All documents containing monetary values, such as: cash, checks, money orders, etc., must be accounted for and should be recorded in an accountability log. These documents with the monetary content should be mailed to the address below daily. A copy of the log identifying the documents being sent should be included with the mailing. These documents are not scanned. The mailing address is:
FEMA - Maryland RSC Attn: Mail Operations 6511 America Blvd Hyattsville, MD 20782
B) SBA loan packets
From time-to-time, applicants accidentally send their SBA loan packet to FEMA. These packets should be forwarded to the SBA processing office no less than once per week.
An example of these loan packets can be viewed below. SBA loan packets are not scanned into an applicant’s file. Loan packets sent to SBA must be accounted for and should be recorded in a daily log. Only SBA applications are to be sent to SBA, all other documents are to be scanned.
The mailing address for the SBA loan processing office is:
Small Business Administration 14925 Kingsport Rd Fort Worth, TX 76155-2243
C) Treasury Questionnaires
Treasury questionnaires are forms sent by the Treasury Department with questions relating to the receipt of an assistance check. Treasury Questionnaires may be received from two different sources: Applicants and FEMA Disaster Finance. Close attention should be paid to the sender’s name.
From Disaster Finance: These forms have been processed by Disaster Finance and are forwarded to FEMA/Mailroom for scanning only.
From Applicants: Though instructions tell the recipient to return these forms directly to Treasury, on occasion applicants send these forms with original signatures to FEMA.
The contractor is to maintain a daily log of Treasury forms received and sent to address below. Forms received from applicants are not scanned into the applicant’s file; they should be forwarded to:
FEMA Disaster Finance Center P. O. Box 129 Mt Weather, VA 22611-0129
D) Form 90-69 B Declaration and Release (sent in by Housing Inspection contractors) FEMA Housing Inspection contractors are required to obtain the applicant’s signature on FEMA Form 90-69 B. The Housing Inspection contractors usually wait until their task order is complete before sending them to FEMA for archiving. (Please Note: the Housing Inspection contractors are not the only submitters of these forms, other submitters include the applicant and Disaster Field Offices.). Form 90-69 B submitted by the Housing Inspection contractors will be scanned into the applicant’s file; close attention should be paid to the sender’s name and address; forms submitted by the Housing Inspection contractors typically arrive in bulk. The COR will work with the contractor to ensure that he has the current names of the FEMA Housing Inspection contractors.
(Forms 90-69 B from sources other than Housing Inspection contractors should be scanned with the daily mail. Forms 90-69 B from Housing Inspection contractors should be filed in accordance with guidance provided in Attachment B entitled “Job Guideline for Document Sorting, Filing, and Archiving”).
E) Correspondence containing original legal documents, photos, videos, or other non-correspondence materials In an attempt to ensure FEMA receives the necessary documentation to process a case, applicants occasionally submit original legal documents, photos, videos, etc. All original legal documents such as driver’s license, social security cards, birth certificates, death certificates, etc must be copied; the originals should be returned to the sender. The contractor will be provided a copy of a generic form letter (See Sample Letter) to be used when returning documents/items to the sender. A copy of the completed form should be placed with the correspondence submitted by the sender. Once the form has been added to the correspondence the mail packet should be scanned and filed with other regular inbound mail. Photos, videos, DVD’s and other electronic media items will not be scanned; however, a notice will be attached to the correspondence indicating that photos, videos, DVD were received but not scanned.
F) Non-English Correspondence
FEMA is expected to process correspondence from a diverse general public. At times this necessitates the translation of non-English correspondence into English. Once translated, the original correspondence with translation should be prepped and scanned with the regular daily mail.
G) Priority Mail
Both the applicant and FEMA field offices send correspondence through commercial priority mail services. Often, correspondence from FEMA field offices contains documents pertaining to more than one applicant. In this situation, a copy of the outside of the envelope must be made for each individual’s document(s); documents should be scanned as individual packets of inbound mail. Priority mail should be batched separately from mainstream mail and scanned using a designated batch series as identified by the COR.
H) Returned Mail Following disasters, individuals may not have a long-term mailing address. Sometimes, the mailing address on file with FEMA is no longer valid or the postal service cannot deliver to the designated area. There are typically two types of return mail: general correspondence and the applicant registration packet.
a) General Correspondence Returned Mail documents should be prepped the same as regular daily correspondence but should be batched separately using a designated batch series to be identified by the COR. Correspondence may be returned because the postal service could not read the name and/or the address of the recipient may have changed. When doc prepping returned mail, the following should be included:
cover page (if available), front of first page letter mailed to applicant (that shows date of letter - must be included), and envelope (taped or copied - must be included). Other documents found in envelope such as 9069A, 9069B, RFI forms, etc. can be shredded / destroyed.
b) Applicant Registration Packets
These packets are mailed in 9 ½ X 12 ½ envelopes and contain program information and copies of the applicant’s registration. Returned applicant registration packets are scanned into the applicant’s file. The following documents are doc prepped and scanned: cover page, complete copy of 9069CL letter, envelope (taped or copied). Other documents found in envelope such as 9069A, Referrals, 9069B can be shredded.
I) Cover Page Providing Specific Indexing Instructions From time to time applicant documents are received from FEMA field offices requiring specific indexing instructions. Typically these documents, pertaining to more than one applicant, arrive in bulk with a cover page providing specific indexing instructions. In this situation, the contractor will copy the cover page for each individual document(s) and scan as individual packets of inbound mail.
A-1: Disaster Business Loan Application
A-2: Disaster Home Loan Application
A-3: Treasury Questionnaire
PART 1 CLAIM AGAINST THE UNITED STATES FOR THE OMB No. 1510-0019 PROCEEDS OF A GOVERNMENT CHECK Exp. 7/3/94
WARNING: Title 18, Sec, 287, U.S. Code: “Whoever makes or presents to any person or officer in the civil, military, or naval service, of the United States, or to any department or agency thereof, any claim upon or against the United States, or to any department or agency thereof, knowing such claim to be false, fictitious, or fraudulent, shall be fined not more than $10,000 or Imprisoned not more than five years, or both”
1. Did you receive this check?
2. Did you sign your name on this check?
3. Did you cash this check?
4. Did you deposit this check in a bank, credit union other financial organization? Did someone else deposit this check to an account that you could use?
5. Was this check cashed with your permission?
6. Did you receive any money or benefit in any way from this check (e.g. household expenses, child support, etc.)? If so, explain. (include amount if known.)
SIGN Payee’s Signature 2nd Payee’s Signature (If check drawn to two payees)
HERE
7. If your present name is different from that on the face of the check, explain why.
Signature of Witness (ONLY If Payee(s) Signed by Mark)
8. If you are making claim for this check and it is not made out to you, state your relationship to the payee. Explain why the payee cannot sign.
Your assigned I.D. No 2nd Payee’s assigned I.D.
(SSA, VA, IRS, Etc.) No. (SSA, VA, IRS, Etc.)
THIS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .