This is a Statement of Work (SOW) for hull cleaning, inspection, and zinc anode renewal services for the USCGC Edgar Culbertson, a U.S. Coast Guard vessel. The contractor must perform waterborne pier-side hull cleaning and video inspection to remove marine growth and restore the vessel's cathodic protection system, along with renewal of depleted zinc anodes. The work includes cleaning the underwater body surfaces free of marine growth and debris per Coast Guard Maintenance Procedure Card B10015.D, submitting video recordings of underwater surfaces before and after cleaning, ensuring transducer surfaces are cleaned only by hand-held brushes without power attachments, polishing propellers, and renewing Government-furnished zinc anode components per Maintenance Procedure Card B10018.D. Government-furnished materials include stern tube anodes, sea chest grate anodes, propeller zinc plates, and bow thruster anodes, with specific part numbers and quantities provided.

The primary period of performance is June 24-25, 2026, with a secondary backup period of June 29-30, 2026. Offerors must explicitly confirm availability for either period at proposal submission. The place of performance is CGC Edgar Culbertson located at 3000 Fort Point Road, Galveston, Texas 77550. All contractor personnel must possess a valid REAL ID-compliant driver's license or acceptable DHS-approved identification to gain base access, with non-compliance potentially causing unexcusable delays. The contractor is responsible for furnishing and installing all protective coverings, removing contamination, and returning affected areas to original condition. This is a small business set-aside (NAICS 336611 with 1,300-employee size standard) being procured as RFQ 52000RFQ260025701 under FAR Part 12 simplified acquisition procedures on a firm-fixed-price basis.

View the file

Other files

File Type Posted
25701 FAR CLAUSES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) USCGC EDGAR CULBERTSON Waterborne Hull Clean and Inspect, Zinc Anode Renewal

1. Background and Current Observed Issues USCGC EDGAR CULBERTSON requires a pier-side waterborne hull cleaning, video inspection, and renewal of depleted zinc anodes to remove operational marine growth and restore the vessel's cathodic protection system.

Work Items:

1. U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes

2. REFERENCES:

Listed within each work item, as applicable. Available upon request.

3. REQUIREMENTS

See each work item for requirements.

4. PERIOD OF PERFORMANCE (POP)

The Government has established two potential POPs for this requirement, listed below. The Primary POP is the Government's preferred schedule. The Secondary POP serves strictly as an authorized backup schedule. All required services shall be completed during one of these two specified periods.

Proposal Submission Requirement: Offerors must explicitly state and confirm their availability to perform the required services during either Primary POP or Secondary POP at the time of proposal submission.

Primary: 24-25 June 2026 Secondary: 29-30 June 2026

5. PLACE OF PERFORMANCE

The primary place of performance shall be at CGC EDGAR CULBERTSON located at below address:

CGC EDGAR CULBERTSON

3000 Fort Point Rd Galveston, TX 77550

POC: Adrian Lopez-Smith Cell: 831-207-8084 Email: Adrian.c.lopez-smith@uscg.mil

6. SECURITY REQUIREMENTS

All contractor personnel requiring access to the place of performance in order to perform work under this contract must possess a valid-state issued REAL ID-compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays to performance and will not constitute an excusable delay.

U/W Body (Waterborne), Clean and Inspect, Renew Zinc Anodes

1. Scope

1.1 Intent. This work item describes the requirements for the Contractor to clean the vessel’s U/W body and to renew bolt-on zinc anodes, while the vessel is moored pier side.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
N
Anode, stern tube
P/N: Z0020202H3

NIIN: 016445483

28 ea.

N
Nut, Self-Locking
P/N: 90715A145

NIIN: 015085774

2 Bx *24 in a bx

N
Anode, Sea Chest Grate
P/N: GA-4

NIIN: 016476179

4 ea.

N
Screw, Prop zinc plate
P/N: 950756

NIIN: 016340210

8 ea.

N
Screw, Sea Chest Grate Anode,
P/N: 93190A634

NIIN: 016197182

4 ea.

N
Screw Cap, Stern Tube Covers
P/N: 90585A626

NIIN: 016161107

42 ea.

N
Zinc plate, propeller
P/N: 950733

NIIN: 016278941

2 ea.

N
Anode, Bow Thruster, Gear Case, Bolt On
P/N: 1081226

NIIN: 123561870

1 ea.

N
Anode, Bow Thruster, Tunnel, Bolt On
P/N: CM2000Z

NIIN: 200126334

12 ea.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 154B WPC 111-301, Rev A, Shell Expansion Coast Guard Drawing 154B WPC 161-301, Rev -, Skegs and Stern Tubes Support Structures Coast Guard Drawing 154B WPC 562-201, Rev -, Rudder Details Coast Guard Drawing 154 WPC 565-201, Rev -, Fin Stabilizer System A & D Coast Guard Drawing 154B WPC 568-201, Rev B, Bow Thruster System A & D Coast Guard Drawing 154 WPC 997-302, Rev -, Docking Plan Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Maintenance Procedure Card B10015.D (MPC B10015.D), 10/31/24, Insp/Cln U/W Equipment (Hull Plate) Surface Forces Logistics Center Maintenance Procedure Card B10018.D (MPC B10018.D), 5/31/23, Replace Underwater Zinc Anodes Other References None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not Applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor must remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Requirements. The Contractor must:

3.2.1 Video recording. Submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning.

3.2.2 Clean/inspect. Clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants in accordance with MPC B10015.D. Remove and replace sea chest grating if necessary to access/clean sea chest suction. Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments. Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process. Polish propellers. Refer to Coast Guard drawings listed in Section 2.

3.2.3 Renew anodes. Renew Government-furnished components listed below paragraph 1.2. in accordance with MPC B10018.D. Anodes may require slight modification to ensure proper fit (ie., trimming metal tabs, drilling tab bolt holes).