About this file
This document is a Scope of Work (SOW) for housing unit maintenance repairs at the U.S. Coast Guard (USCG) Base Borinquen in Aguadilla, Puerto Rico. The SOW outlines the required repairs to five housing units, including balcony repairs, interior painting, foyer ceiling repairs, and replacement of aluminum doors. The work must be completed within 45 days after the notice to proceed, and the contractor is required to coordinate with the USCG Facilities Engineering Department and Local Housing Officer. Prospective bidders are encouraged to visit the site, and quotes with a detailed breakdown of labor, equipment, and materials must be submitted by email to the Contracting Officer. The contractor must comply with all safety, security, and environmental regulations, and the work will be subject to final inspection prior to acceptance.
The related federal contract opportunity is a pre-solicitation for the housing unit repairs, with a solicitation number of 31171PR240000049. This is a "Sources Sought" request for quotes, and interested contractors should submit their quotes to miguel.a.cruz-rivera@uscg.mil.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
SCOPE OF SERVICES FOR
HOUSING UNIT MAINTENANCE REPAIRS
DISTRICT 7
BASE BORINQUEN
FACILITIES ENGINEERING
BASE BORINQUEN
260 GUARD ROAD
AGUADILLA, PR 00603
- SCOPE OF WORK –
HOUSING UNIT MAINTENANCE REPAIRS
AT
U.S.C.G. BASE BORINQUEN,PR 00603
MAY 2024
PART 1 – STATEMENT OF WORK
1.1 Project Overview: This document sets forth the scope of work for the maintenance repairs to five housing units at USCG Base Borinquen.
This project will provide repairs which will include repairs to balconies, all interior paint, repair of foyer ceiling entrance and replacement of various aluminum doors. Amount of the requested items for each unit will be provided to contractor by Local Housing Officer at time of visit. Without these services, Base Detachment Borinquen is not able to provide adequate housing, in terms of quality and acceptable living standards to military members and their families; thus, affecting the overall mission and effectiveness of the entire organization. Expenses to the Government are increased due to releasing from Housing to live off Base and paying OHA. This water infiltration leak also could potentially cause that the celling interior LBP paint to peel off creating a health hazard to the residents.
1.2 SCOPE: Provide all personnel, labor, equipment, materials, tools, supervision, and other items necessary for maintenance repairs.
The work includes, but is not limited to the following:
Repair Balconies, Interior Painting, Repair Foyer Ceiling and Replacement of Aluminum Doors. Cut exterior patio deck roof supports.
1.2.1 Project Location: USCG Housing at Base Borinquen Aguadilla PR, 00603.
1.2.2 General Scope of Work: Coordinate with Local Housing Officer and Contracting Officer Representative to schedule repairs and minimize disruptions. Ensure that all work meets quality standards and is completed within the specified timeframe.
1.2.3 Specific Tasks:
A. Repair Balconies: Inspect all balconies for damages, cracks, leaks, and safety hazards. Repair damaged balcony flooring with proper material (self-leveling etc.) recommended by contractor as needed. Ensure proper drainage to prevent water from filtering into units below. Apply waterproofing sealant to the balcony surface to protect against water infiltration. Conduct a final inspection to ensure that the balconies are safe, functional, and aesthetically pleasing.
B. Interior Painting: Prepare surfaces by cleaning, sanding, and priming as necessary. Patch and repair any cracks, holes, or imperfections (mappings) in the walls and ceilings. Apply a coat of high-quality paint to all interior walls, ceilings, and trim according to the specified color scheme. Ensure proper ventilation during painting and allow sufficient drying time between coats. Touch up any areas that require additional attention after the initial painting.
C. Repair Foyer Ceiling: Assess the condition of the foyer ceiling and identify any water damage, cracks, or structural issues. Repair or replace damaged ceiling materials such as drywall or plaster. Address any underlying issues causing the damage, such as leaks or poor ventilation. Apply a fresh coat of paint or finish to the repaired ceiling to match the existing décor.
D. Replacement of Aluminum Doors: Measure and procure new aluminum doors to replace the existing ones. Remove the old doors carefully, preserving any hardware that can be reused. Install the new aluminum doors securely, ensuring proper alignment and weather sealing. Test the doors for smooth operation, reusing locking mechanisms from removed doors, and insulation efficiency. Dispose of the old doors in an environmentally friendly manner.
1.2.4 Compliance and Permits: All construction activities will be carried out in compliance with local building codes, regulations, and safety standards. Necessary permits will be obtained prior to the commencement of construction, and inspections will be conducted as required throughout the repair process.
1.2.5 Documentation: Comprehensive documentation will be provided, including As-built drawings and specifications. Equipment manuals and certifications. Safety certifications and inspection reports. Any other relevant records or documentation related to the repairs.
1.2.6 Finishing Touches: Inspect the entire installation for quality and completeness. Make any necessary adjustments for a professional finish.
1.3 INSPECTION PRIOR TO BID: Prospective bidders are encouraged to visit the site to familiarize themselves with the existing conditions. The site visit will be predetermined by the Contracting Officer and will be displayed on the Bid Requests. All site visit arrangements should be made by contacting LT Clara E. Dahill at (787) 975-9470 or Clara.E.Dahill-Baue@uscg.mil at least three days prior to the site visit date. Prospective bidders must have a copy of this SOW to gain access to the Housing areas. Have a valid driver’s license, vehicle registration and no firearms.
1.4 SUBMITAL OF QUOTES: Quotes with a detailed and complete breakdown of all labor, equipment, and material (separately) shall be submitted by e-mail to the Contracting Officer.
1.5 HOURS OF OPERATION: The services under this contract shall be performed during the normal duty hours indicated as, 7:00 AM to 3:30 PM, Mondays through Fridays (excluding federal holidays), except as otherwise authorized by the Contracting Officer Representative.
1.6 AVAILABILITY OF UTILITY SERVICES: Reasonable amounts of electricity and potable water will be available to the Contractor without cost. The Contractor shall pay all costs incurred in connecting, converting, and transferring the utilities to the work. The Contractor shall be responsible for making connections. Temporary toilet facilities shall be provided and maintained by the Contractor for personnel.
1.7 CONTRACTOR SAFETY, SECURITY AND USE OF PREMISES: The Contractor will be working on a Coast Guard military installation and must be familiar with and obey established fire, safety, environmental and security regulations.
1.7.1 Security Passes: Contractor personnel shall obtain security passes from the Security Office prior to beginning work and must always carry this ID while working on this project. Each employee must show a valid driver’s license, birth certificate or company ID card to be issued a security pass. The Security Office, Building 146 Wing Road, is open to contractors for ID issuance Monday thru Thursday, 0800 – 1200. Personnel shall not stray from the immediate area of work or direct avenues of ingress and egress unless authorized in advance by the Contracting Officer's Representative (COR).
1.7.2 Safety Practices: The Contractor shall ensure that the work area is clearly marked at all times and take necessary precautions to ensure safety hazards are minimized and mitigated. Perform and conduct the work to minimize obstruction to the paved driveways and parking and walkway area, and other interference with Coast Guard operations. Contractor must follow the latest OSHA regulations on this project. The contractor shall prepare a Job Safety Analysis (JSA) and turn into COR. The contractor shall certify that all contracted personnel is qualified and trained in Safe Work Practices, Personal Protective Equipment (PPE) and Hazard Communication (HazCom and SDS). In the event of an accident, report immediately to COR and prepare an incident report.
1.7.3 Hazardous Materials: The Contractor shall provide the Government with a list of all hazardous materials to be used in the performance of this project and ensure Safety Data Sheets (SDS) are available at the work site for all hazardous materials used. The Contractor shall provide and have at hand spill kit materials and containers to collect any spillage. Immediately contain and clean up the release or spill of any hazardous material and report the incident to the Environmental Protection Specialist, Mr. William González Hernandez at (787) 600-2672 or William.GonzalezHernandez@uscg.mil. The contractor shall not use any toxic substances materials as Asbestos, PCB, Lead, or prohibited refrigerants.
1.7.4 Equipment, Tools, and Vehicles: The contractor shall inspect on a daily basis and ensure that all equipment, tools, and vehicles:
· Do not have leaks and/or deteriorated hydraulic hoses.
· All electrical cords and electrical extensions need to be in good conditions.
· Ladders need to be in good conditions and comply with the user’s weight.
1.7.5 Protection of Property: The Contractor shall protect the existing surrounding equipment, personal belongings, and property during the course of this work. Any damage caused by the Contractor shall be corrected at Contractor’s expense. The Contractor will be responsible for repair of any damage incurred to turf, landscaping, buildings, utilities, or pavement as a result of their work at no additional cost to the government.
PART 2 – GENERAL REQUIREMENTS
2.1 The Contractor is responsible for verifying all dimensions, quantities, and conditions at the job site prior to commencing work.
2.2 Minor materials and work not specifically mentioned herein but necessary for the proper completion of the specified work shall be furnished without additional cost to the Government.
2.3 Contractor shall be required to commence work under this contract within the next days after notice to proceed (NTP) given by the Contracting Officer. The project shall be completed within 45 days after commencement for a total of 50 days. The 50 days will include the time for submittals review and approved and to complete all project records (closeout documents). Any weather delays shall be immediately notified to the Contracting Officer’s Representative.
2.4 Contractor shall submit a schedule of activities prior project start and activity vision plan for the project.
2.5 The project is located at:
USCG Base Borinquen, 260 Hanger Road, Aguadilla, Puerto Rico 00603
2.6 Contractor shall request final inspection prior to departing the worksite. The Contractor shall request final inspection with at least 2 working days in advance for proper coordination and approval. The Contractor shall provide any materials, labor and equipment and others to provide a usable and complete project.
2.7 Contractor shall coordinate all work with the USCG Facilities Engineering Department (COR) Mr. Hector Laguer at (787)629-9556, the Facilities Engineer LT Clara E. Dahill-Baue at (787)975-9470, Local Housing Officer, and Environmental staff. Notify the USCG Facilities Engineering Department at least 3 working days in advance of work at the site to allow the USCG to provide notification to affected users.
2.8 The Contractor is authorized to work from 7:00 am – 4:00 pm Monday to Friday. Contractor shall provide the Contracting Officer with of names of all personnel who will be working on the site. The contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site. All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license ID or passport. The identification must be laminated and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises.
2.9 Warranty Document: Document shall state the manufacturer and/or contractor shall repair or replace the complete component if deterioration is caused by defective materials or workmanship. Also included shall be a paragraph certifying that all work was performed according to manufacturer’s recommendations. In addition, warranty shall specify that in the event of any deficiency created by an “Act of God” or any other event, if the contractor with the same original product does the repairs, the contractor shall continue honoring the existing warranty. Document shall be submitted to the COR or Facilities Manager Engineer for record.
2.10 The Contractor shall comply with the Immigration and Nationality Act (INA).
2.11 Contractor shall clean job site daily and dispose debris outside of USCG property.
2.12 Contractor shall conduct operations to cause the least possible interference with the normal operations, streets, driveways, parking areas and others.
2.13 Contractor shall store materials only in locations authorized by the Contracting Officer. No fire and hazardous materials or flammable liquids shall be stored or otherwise maintained within a building or structure, except as approved, and in accordance with the local fire regulations.
2.14 Contractor shall comply with all safety requirements, personnel protective equipment (PPE) and OSHA Safety and Health Standards Digest, latest version, in all their activities and operations to perform the work. The Contractor shall comply with EM-385 and PROSHA requirements.
2.15 Cleaning up: All clothes, cotton, wastes, sanding disks, and other cleaning materials which might constitute a fire hazard shall be placed in a metal container or destroyed at the end of each workday. Upon completion of the work, all staging, containers, and debris shall be removed from the site. Adjacent areas and surfaces negatively affected during the performance of this contract shall be left clean and returned to the original condition. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpster to dispose of cleaning materials.
2.16 Protection of Premises: The Contractor shall take all necessary precautions to protect the Government and private property from damage as a result of their operations. Existing property so damaged shall be promptly restored, repaired, or replaced to its original condition by the Contractor at their own expense.
2.17 Contractor shall coordinate all required work with the USCG Facilities Engineering Department, LT Clara E. Dahill Baue via e-mail at Clara.E.Dahill-Baue@uscg.mil, tel: (787) 975-9470.
Base Borinquen
*** END ***