This document is a Statement of Work (SOW) for commercial dive operations and salvage services to cut and remove steel pile wreckage from the Horseshoe Beach channel in Florida. The U.S. Coast Guard Aids to Navigation Team St. Petersburg requires a contractor to provide all labor, materials, and insurance to remove 8 single H-pile markers that have become hazards to navigation. The contractor is responsible for mobilizing a dive crew and equipment, cutting the wreckage at the mudline, recovering the steel pile stumps, and properly disposing of the debris. The contractor must comply with environmental requirements to protect manatees and sea turtles. The Coast Guard will not provide any equipment or assistance. The work is estimated to be completed within 3 days.

The related federal contract opportunity is a sole source award by the U.S. Coast Guard Office of Procurement & Contracting Miami Detachment on behalf of U.S. Coast Guard Sector Aids to Navigation Team St. Petersburg. The contract was awarded to ANDERSON DIVING, INC. for $22,460.00 on June 7, 2024. The contract was awarded on an urgent, sole source basis due to the navigation hazards posed by the steel wreckage at Horseshoe Beach.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

Aids to Navigation Team St. Petersburg, FL

Statement of Work Commercial Dive Operations & Salvage for ATON in Horseshoe Beach

1. Description of Work: The contractor shall provide all labor, material, and insurance to cut and remove all steel pile wreckage in the Horseshoe Beach Channel. Wreckage remains at the following aid locations:

Horseshoe Beach Approach DBN 4 29-23-39.869N, 083-19-45.264W Horseshoe Beach Approach Light 9 29-24-35.361N, 083-18-26.840W Horseshoe Beach Channel DBN 12 29-25-21.038N, 083-18-03.851W Horseshoe Beach Channel DBN 13 29-25-21.201N, 083-18-05.180W Horseshoe Beach Channel DBN 14 29-25-44.191N, 083-17-47.677W Horseshoe Beach Channel Light 16A 29-26-07.131N, 083-17-31.731W Horseshoe Beach Channel DBN 21 29-26-12.087N, 083-17-34.470W Horseshoe Beach Channel DBN 23 29-26-11.871N, 083-17-38.486W

The period of performance is to be determined and the date of operations for this work is dependent on the weather. A total of three days will be given to complete the removal, recovery, and disposal.

The work consists of providing full time supervision, certified commercial divers (3), 30’ dive boat, surface supplied diving equipment, hard wire communications, underwater burning torch, diving related expendables, materials, and insurance to remove and dispose of 8 single h-pile markers as follows:

Provide mobilization of men (3) and equipment Provide truck, dive boat, and trailer Provide underwater burning equipment Provide dump truck for disposal of 8 pile remnants Provide lodging and sustenance for 3 men for 2 nights Attend site – cute 8 single h-pile marker sign at the existing groundline – recover steel pile stumps Provide proper disposal of damaged piling remnants and signs Demobilize crew and equipment

The contractor is responsible for removing all remaining wreckage off bottom of river floor and disposal. If Coast Guard property still attached the contractor is responsible to contact Aids to Navigation Team St. Petersburg, FL for pick up of property.

2. The Coast Guard will not provide any equipment or assistance for this project. ANT St. Petersburg will retrieve equipment from the contractor at the conclusion of the project. Upon completion of work and removal of piles/wreckage, the contractor will do their best to provide pictures or video footage of wreckage removed from the bottom.

3. The contractor is responsible to visit the area and submit their bid proposal.

4. The contractor shall comply with the Immigration and Nationality Act (INA).

5. The contractor shall comply with all industrial safety requirements, personnel protective equipment (PPE), and OSHA Safety and Health Standards Digest (latest version) throughout all the activities and operations surrounding this evolution.

6. The contractor shall coordinate all required work with the St. Petersburg Aids to Navigation Officer in Charge, BMC Brittany Barlow at (727) 272-6847 or via e-mail at Brittany.E.Barlow@uscg.mil.

7. Example of what one destroyed aid/wreckage needing to be cut and removed is attached with pictures below.

8. Environmental concerns and mitigations:

Steel wreckage that is cut at the mudline by the divers will be disposed of in a commercial dumpster being rented by the salvage company. Salvage company will be solely responsible for proper disposal of cut ATON markers and will ensure steel wreckage cut is not left on the seafloor.

Steel wreckage cut is approximately 6’ in length from the mudline to the waterline, + or – 1’. The stumps or steel wreckage that will be cut are small enough to fit in the dive boat being used by the salvage/dive company.

Dive company will not be using a barge or vessel that needs to spud down and disturb the seafloor.

Contractor is required to comply with Sea Turtle, Sawfish & Manatee Best Management Practices required by NMFS and USFWS.

STANDARD MANATEE CONDITIONS FOR IN-WATER WORK

The permittee shall comply with the following conditions intended to protect manatees from direct project effects:

a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act.

b. All vessels associated with the construction project shall operate at "Idle Speed/No

Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.

c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement.

d. All on-site project personnel are responsible for observing water-related activities for the presence of manatee(s). All in-water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation.

Animals must not be herded away or harassed into leaving.

e. Any collision with or injury to a manatee shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or in Vero Beach (1-772-562-3909) for south Florida, and emailed to FWC at ImperiledSpecies@myFWC.com.

f. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the FWC must be used. One sign which reads Caution: Boaters must be posted. A second sign measuring at least 8½ " by 11" explaining the requirements for “Idle Speed/No Wake” and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. These signs can be viewed at http://www.myfwc.com/WILDLIFEHABITATS/manatee_sign_vendors.htm. Questions concerning these signs can be forwarded to the email address listed above.

�������������
����������
���
�������������

������������������������������� !������"��##���!�#��$��������%�##�$�������"� &���������������"�%� �� ��������"�����"�&��� �����'& �"���������%�()**�+�"�� ��"�,�&����"��-������#�)%%����.,/-)0�1 ��������-�"�& ��"�2�3�"����.1-2045��6789:89;� <9:=9>� =?@8=A?>B���������������������������� !������"��##���"& ��������##��� "����#��""��������$��������� �'����� ����"� &������C�&��������������#�� �"������%�"�����"�� ��������&��� �����/������ ���,�����"�*���./,*0���������D� ����D�!!�#�1 ���������*���.DD1*0E�*##���F"����� �'������ "����#�� �� �"���"�C#��%� ��C"� 3����$��� F �#���������3����"�%� ������ �"������%�� ��������"�����"E�*##��� "����#�"��##�C����3�"����������� ��� ����3�#������ �!���#�����#���"�%� ��� !���G��� �""���G�� �H�##����#�"����"�����"������##�!� ����!�!!�#"E�������� !����$������ ��������"�����"������ �����#���C�����!���C��%�&����������� ��"���� ��G��#��"�� �3��$����� �#�3����!� ����!�!!�#�����/,*F#�"����"�����"����+����*�,�����"�.����"4II$$$E%�"�� ��"E����E��3I%���F"�����"0������������"&#����������&!���"��������3��C������!�#�����%� ������ �'���E��5E��JK=<L9A8B�& C�������& ����"G��%�&"��G�"��##�C��!�����%�!��� ��#����$������ ��������"�����"��������C���!��������#�������C�� ��&#� #��!����� �������3����� ��������"�����"���� ��!���E�*##��& C�������& ����"��������� ���F$��� ��M&��!����"��##�C��� ��� #��"��& ���$����!��� ��#"������ ��&������� �"H��%�� ��������"�����"�������#�!����������� ��!���E��E�N�F$��� �#���"�. ���G������G�������C#�G����#&���������#���"����"��& ���& C�������& ����"0�"��##�C��"��%%G���&�G��������F#������E�/O�!�#�"��%�"&���#���"�� �����3��!���#������"�� ����3����C#�"������������� ����#��#������������#�E�+#�O�C#����F$��� �#���"G�"&����"���#��� ����� �����#���"��������&#��#����� �����#�G�"��##�C�����#�"���������#�"����� � &CC� �"#��3�I�&C��������� ������������� �3��������#����% �!�#���������������#���E�N���##���"�����"G�����O��""�#����"��##�C���##�$����������$��� E�*##������ ����"��##�C������ ��"�% ���% �!��� �C����!�����"��� �""E�CE��& C�������& ����"��������� ���F$��� ��M&��!����"��##�C���#����������!���� ���������"�������� ���� ��������"�����"�$����������� �'����� �������!���!�P�"������O����������& �������%����� ��O�#&"����% �!������ �'����� ��E��E��& C������C� �� "�"��##�C����"�������������$��������!���!�P�"������O����������& �������%�� ��������"�����"��O�#&"����% �!��!�� �������C�����.�E�E�� �����#���C����G��� �C����!G�"��� �""0��������� �'����� ��E�QE��<96R8=7A>B+� ����"� &������$� H�������"����� �##��"������� ��.�E�EG�C� ��F!�&������M&��!����� ���������C� ���� �"��������%� �3� G�� �"�� �FC�"����M&��!�����O�����������������$��� 04��E�)�� �����"��%�!�3�����M&��!����"��##����"���%���� ��������"�����"��"��C"� 3���$������5ST�%�����%���� �����"E�������������������������������������������������5�D������"�� ��!�������&��� �����'& �"���������%�����UE,E�+�"������V�#�#�%��,� 3���E�

���/��012"3#454612�7!819462:�7!;369!<!24"=��'����

��)@A?�BAC�

������D ��D ������E���

��)@A?�BAC���

�F��

��� ��B�

����B�

��G��@� ����� ��H������ ��D ���@H?������ �������E��� ��D

�-�7!819462:� 61#54612"=E��� ��@)�����++B�� ��� ���I����� ��E����������

'��J��

�K��� ���I�����

�� �L����LM�.NOP/�M��QRR646125#�012R64612"=��'���

��������S19�5RR646125#�62T19<54612U�8#!5"!�V1245V4�WXQQ�S6"Y!96!"�Z[7X�\7]�54̂�>?���%���

���A ��P��N����� �)������)���B ���J�N�E �-��J�J��L�/.M�N��(������������� ��B���

��A '����N�

SOW - Horseshoe Beach
FWS_Manatee - Standard In-Water Work Construction Measures
Protected Species Construction Conditions

File details come from the government source that posted it. Updated .