SOW_HIRMC-508-26_Redacted.pdf
PDF 194 KB Posted
- Solicitation number
- N32253-26-Q-0043
About this file
This document is a Specifications for Work to be Accomplished (Performance Work Statement) issued by the Department of the Navy for a shipyard availability work order designated HIRMC-508-26, including all changes through May 6, 2026.
The specification establishes requirements for two distinct work items on a naval vessel. Item 077-00-001 addresses hazardous waste control throughout the ship, requiring the contractor to manage and dispose of all hazardous waste in accordance with the Resource Conservation and Recovery Act (RCRA) and Federal Hazardous Materials Transportation Act. The contractor must obtain EPA or delegated state environmental agency identification numbers, complete required manifests, and distinguish between contractor-generated, Navy-generated, and co-generated hazardous waste. Estimated waste types include acid solutions, ethylene glycol, sodium hydroxide, cleaning solvents, fluorocarbons, paints, paint strippers, oils, bilge water, and metal dust/debris. The contractor must provide a comprehensive report identifying the type, amount, and disposal cost of all hazardous waste removed, including analysis methodology and efforts to minimize waste generation. Pricing for hazardous waste management and disposal is set at zero dollars with cost adjustments subject to equitable adjustment based on actual waste generated.
Item 311-10-001 requires repair of two Ships Service Turbine Generators (SSTG), Northrop Grumman manufactured units located in the engine room. Work includes disassembly, inspection, and repair performed by qualified OEM representatives with 30 days of technical assistance support, in-place machining and grinding operations, static tuning and testing, dynamic tuning and micro-balancing, and issuance of OEM Certificates of Completion for unrestricted operations. The contractor must coordinate with Pearl Harbor Naval Shipyard & IMF (PHNSY & IMF) for confined space entry, radiological monitoring, and provision of rigging and crane services. Materials are furnished under a separate contract, with PHNSY & IMF responsible for interference removal and waste disposal.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
HRMC (NMD)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: HIRMC -508-26
INCLUDES ALL CHANGES THROUGH 5/6/2026
INDEX
SHIP: HIRMC -508-26
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-26 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO. TITLE CHANGE DATE CHANGE
009-001 General Criteria; accomplish 09/04/2024 Original
009 002 Environmental Compliance Report for Material Usage; accomplish 07/22/2024 Original
009 003 Toxic and Hazardous Substance; control 07/22/2024 Original
009-004 Quality Management System; provide 09/16/2024 Original
009 005 Temporary Access; accomplish 11/18/2024 CH 1
009 006 Maintaining Protection and Cleanliness from Non Radioactive Operations;
accomplish
07/22/2024 Original
009 007 Confined Space Entry, and Certification; accomplish 09/04/2024 Original
009 008 Shipboard Fire Protection and Fire Prevention; accomplish 09/30/2024 Original
009 010 Asbestos Containing Material (ACM); control 09/16/2024 Original
009 018 Mine Warfare Ships Magnetic Material; control 09/04/2024 Original
009 019 Provisioning Technical Documentation (PTD); provide 07/22/2024 Original
009 020 Government Property; control 07/22/2024 Original
009 021 Alteration Verification, Logistic and Technical Data; provide 07/22/2024 Original
009 023 Interference; remove and install 11/18/2024 CH 1
009-024 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/16/2024 Original
009 034 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 07/22/2024 Original
009 039 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for
Commercial Equipment/Component; accomplish
07/22/2024 Original
009 040 Contractor Crane, Multi Purpose Machine and Material Handling Equipment at a
Naval Facility; provide
07/22/2024 Original
009 060 Schedule and Associated Report for CNO Availability; provide and manage 09/16/2024 Original
009 061 Shipboard Use of Fluorocarbons; control 09/16/2024 Original
009 067 Integrated Total Ship Testing; manage 09/16/2024 Original
009 068 Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO)
Availabilities; provide
09/16/2024 Original
009 069 Heavy Weather/Mooring Plan; provide 09/16/2024 Original
009 070 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
09/16/2024 Original
009 072 Physical Security at a Private Contractor Facility; accomplish 09/16/2024 Original
009 073 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
09/16/2024 Original
009 074 Occupational, Safety and Health Plan; accomplish 09/16/2024 Original
009 080 Ship Facility; maintain 09/16/2024 Original
009 081 Compartment Closeout; accomplish 09/16/2024 Original
009-082 Installation of Equal Component Vice Specified Component; report 07/22/2024 Original
009 084 Threaded Fastener Requirement; accomplish 07/22/2024 Original
009 088 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS Contaminated Tank, Space, and Piping; certify
09/16/2024 Original
009 093 Emergency Planning and Community Right to Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
07/22/2024 Original
ITEM NO. TITLE CHANGE DATE CHANGE
009 099 Ship Departure Report; provide 09/16/2024 Original
009 100 Ship's Stability; maintain 09/16/2024 Original
009 101 Ship Transit and Berthing; accomplish 09/16/2024 Original
009 106 Work Authorization Form Coordinator (WAFCOR); provide 09/16/2024 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 07/22/2024 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 07/22/2024 Original
009 111 Schedule and Associated Report for Non CNO Availability; provide and manage 09/16/2024 Original
009 117 Combat Systems, Light Off Suport; provide 09/17/2024 Original
009 118 CG Deck Loading; accomplish 07/22/2024 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/17/2024 Original
009 122 Temporary Padeye; install and remove 11/18/2024 CH 1
009 125 Boat 65 Feet (20meters) Long and Less; accomplish 11/18/2024 CH 1
009 126 Schedule Model Review (SMR); accomplish 09/17/2024 Original
099 001PH Waste Generated on Government Property, including Satellite Accumulation area (SAA), Managing and Disposing of Hazardous Waste (HW) and non HW;
accomplish
11/27/2024 Original
099 002PH Dry Dock Requirement; accomplish 11/27/2024 Original
099 003PH Additional Environmental Requirements; accomplish 11/27/2024 Original
099 004PH Industrial Wastewater/Oily Wastewater Disposal; accomplish 11/27/2024 Original
099 007PH Radiological Fallout Controls; accomplish 11/27/2024 Original
099 008PH Safety of Ship Requirement; provide 11/27/2024 Original
099 008PH Safety of Ship Requirement; provide 02/11/2025 CH 1
099 009PH Additional Requirements for Process Control Procedure (PCP; provide and accomplish
02/11/2025 CH 1
099 040PH Additional Requirements for Contractor Cranes, Multi Purpose machine, and
Material Handling Equipment at Joint Base Pearl Harbor Hawaii; accomplish
11/27/2024 Original
099 069PH Pier Laydown for Pearl Harbor Naval Shipyard & IMF (PHNSY & IMF)
Availability; accomplish
02/11/2025 CH 1
ITEM NO. TITLE
Hazardous Waste Produced on Naval Vessels; control077-00-001
No. One and No. 2 Ships Service Turbine Generator (SSTG); repair311-10-001
SHIP: ITEM NO: 077-00-001
COAR: 26 PCN: EE01-L646
CMP: NONE
PLANNER:
SSP: HIRMC -508-26 1 of 5 ITEM NO: 077-00-001
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.2 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number
SHIP:
SSP: HIRMC -508-26 2 of 5 ITEM NO: 077-00-001 issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ ____________ __________
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
SSP: HIRMC -508-26 3 of 5 ITEM NO: 077-00-001
Methyl Ethyl Ketone _____ ____________ __________
Spent Abrasive Blast Material _____ ____________ __________
(contaminated with a known hazardous waste)
Trichloroethane _____ ____________ __________
Miscellaneous Chemicals _____ ____________ __________
(Rust Preventative)
Miscellaneous Chemicals _____ ____________ __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ ____________ __________
(Reactive)
Oil (Synthetic) _____ ____________ __________
Paints (Enamel, Latex, _____ ____________ __________
Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)
Paints (May include lead, _____ ____________ __________ cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
Sludges (Contaminated with _____ ____________ __ a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)
Lube/Fuel Oil Soaked Rags _____ ____________ __________
Paint/Flakes (Pressure Washing _____ ____________ __________
Ext Hull Surfaces)
Fuel Oil(Residual) _____ ____________ __________
Bilge Water _____ ____________ __________
Oil/Water _____ ____________ __________
AFFF/Water _____ ____________ __________
MEK Contaminated Rags _____ ____________ __________
Metal Dust / Debris _____ ____________ __________
3.5.1 Provide zero dollars for managing and disposing of all
hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.
SHIP: )
SSP: HIRMC -508-26 4 of 5 ITEM NO: 077-00-001
3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS), or
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states
SSP: HIRMC -508-26 5 of 5 ITEM NO: 077-00-001 listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: ITEM NO: 311-10-001
COAR: 26 PCN: EE01-L645
EE01-L644
CMP: NONE
PLANNER:
SSP: HIRMC -508-26 1 of 3 ITEM NO: 311-10-001
1. SCOPE:
1.1 Title: No. One and No. 2 Ships Service Turbine Generator (SSTG);
repair
1.2 Location of Work:
1.2.1 Engine Room
1.3 Identification:
1.3.1 Quantity: (One EA), No. One, SSTG, Mfr: Northrop Grumman
1.3.2 Quantity: (One EA), No. 2, SSTG, Mfr: Northrop Grumman
2. REFERENCES:
2.1 Standard Items, FY-26
2.2 S9311-DE-MMO-010, Turbine Generator Set Technical Manual
2.3 6511E72, Steam Turbine Generator Assembly
2.4 S9G-N3B-TG-2.1, TG SETS, GDEB TEST PROCEDURE
2.5 1TS-3835, VACL SSTG Field Service THR Tuning Procedure
2.6 SHIPALT 4950D, SSTG Mag Bearing Axial Sensor and Wirewell Mod
2.7 Security Requirement, Work Item Addendum
3. REQUIREMENTS:
3.1 Provide 30 days of qualified Original Equipment Manufacturer (OEM) technical assistance to PHNSY for each unit listed in 1.3, located in 1.2, in support of Catcher Bearing removal and reinstallation of equipment performed by PHNSY shipyard personnel. See Note 4.1.
3.2 Accomplish the disassembly, inspection and repair of the equipment listed in 1.3.1 and 1.3.2, for the location listed in 1.2.1, in accordance with the requirements of 2.1 through 2.7.
3.2.1 Provide the services of a qualified Original Equipment
Manufacturer (OEM) representative to disassemble, clean free of corrosion, and inspect, the No. 1 Turbine High Pressure (THP) bearing assembly, THP Radial Rotor, Turbine Low Pressure (TLP) Bearing Assy, Generator Coupling End (GCE) Bearing Assy, Turbine to Generator Coupling, Thrust Rotor, inboard and outboard Thrust Stator Assembly of the equipment listed in 1.3, for signs of overheating or defects, in accordance with the requirements of 2.2, 2.3 and OEM proprietary drawings and specifications. Record the inspection results.
3.2.1.1 Coordinate with PHNSY C270.2 for joint initial entry
into each SIM-T enclosure for inspection. Record as-found condition.
3.2.1.2 Submit one legible copy, in approved transferrable
media, of a report listing results of 3.2.1 to the SUPERVISOR.
3.2.2 Remove existing and install new material listed in 4.5, in
SSP: HIRMC -508-26 2 of 3 ITEM NO: 311-10-001 accordance with the requirements of 2.2, 2.3, 2.6 and OEM proprietary drawings and specifications.
3.2.2.1 Accomplish Shipalt 4950D, for equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.6.
3.2.3 Accomplish in-place machining and grinding to final finish, the THP Radial Rotor and Sensor target area in accordance with the requirements of 2.2, 2.3, 2.7 and OEM proprietary drawings and specifications. Record final dimensional readings.
3.2.3.1 Submit one legible copy, in approved transferrable
media, of a report listing results of 3.2.2 and 3.2.3 to the
SUPERVISOR.
3.3 Accomplish SSTG Static Tuning, grooming, and SSTG testing in accordance with the requirements of 2.2 through 2.5, 2.7, and OEM proprietary drawings and specifications. Record the results.
3.3.1 Submit one legible copy, in approved transferrable media, of a report listing the requirements of 3.3 to the SUPERVISOR.
3.3.1.1 Upon receiving PHNSY concurrence on reports referenced in 3.3.1, provide one legible copy, in approved transferable media, of a ‘Certificate of Completion’ letter detailing completion of requirements of 3.3 to the SUPERVISOR.
3.4 NORTHROP GRUMMAN personnel involved in SSTG Dynamic Tuning shall receive training and qualifications for Pearl Harbor Naval Shipyard Radiological personnel to monitor radiation exposure during the SSTG Dynamic Tuning evolution. See Note 4.4.
3.4.1 Submit one legible copy, in approved transferrable media, of a letter which gives permission to Pearl Harbor Naval Shipyard Radiological personnel to monitor the radiation exposure of NORTHROP GRUMMAN personnel involved in the SSTG Dynamic Tuning evolution, to the SUPERVISOR, two weeks prior to SSTG Dynamic Tuning.
3.4.2 Submit one legible copy, in approved transferrable media, of a report listing the NORTHROP GRUMMAN personnel who will be involved in the SSTG Dynamic Tuning evolution, and their current level of radiation exposure, to the SUPERVISOR, two weeks prior to SSTG Dynamic Tuning.
3.5 Accomplish SSTG Dynamic Tuning and micro-balancing in accordance with the requirements of 2.2 through 2.5, 2.7 and OEM proprietary drawings and specifications. Record the results. See Note 4.4.
3.5.1 Provide OEM engineering services onsite for analysis, data review and technical recommendations specific to Dynamic Tuning and micro-balancing evolution.
3.5.2 Submit one legible copy, in approved transferrable media, of a report listing the requirements of 3.5 to the SUPERVISOR.
3.6 Upon satisfactory completion of work, provide one legible copy, in approved transferable media, of OEM ‘Certificate of Completion’ letter releasing each unit into service for Unrestricted Operations, to the
SUPERVISOR.
4. NOTES:
4.1 Known source for OEM qualified Technical Representative:
SSP: HIRMC -508-26 3 of 3 ITEM NO: 311-10-001
NORTHROP GRUMMAN MARINE SYSTEMS
401 E HENDY AVE
SUNNYVALE, CA 94086
Point of contact:
- Northrop Grumman Field Service Manager
Cell: , Email:
4.2 Northrop Grumman Freight Shipping Address:
NORTHROP GRUMMAN
ATTN:
500 E CALIFORNIA AVE
SUNNYVALE, CA 94086
Phone:
4.3 PHNSY Shipping Address:
PEARL HARBOR NAVAL SHIPYARD & IMF
667 SAFEGUARD ST, BLDG 167 RECEIVING
JBPHH, HI 96860
ATTN:
4.4 SSTG Dynamic Tuning requires reactor plant operation. NORTHROP GRUMMAN personnel are required to wear a thermo luminescent dosimeter (TLD) monitoring device during this evolution.
4.5 Bill of Materials furnished on contract N32253-23-C-0003, CLINs 0003 and 0004.
4.6 All interference shall be removed by ships force and PHNSY & IMF as required.
4.7 PHNSY & IMF shall provide all rigging and crane service as required.
4.8 PHNSY & IMF and ships force shall be responsible for the disposal of all solid and liquid waste generated during the execution of this contract.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.