This document is a Statement of Work (SOW) for Heat Treatment Services required by the Fleet Readiness Center Southeast (FRCSE) located in Jacksonville, FL. The contractor shall provide all labor, supervision, tools, equipment, supplies, and other necessary items to properly process FRCSE's identified items requiring heat treatment processing. Services include aluminum/steel/titanium/beryllium copper heat treating, precipitation and age hardening, vacuum heat treating, quenching, hardening and tempering, and carburization. The contractor shall also provide inspection, hardness, and conductivity testing, as well as certifications of conformance and furnace charts. The government requires the contractor to be located within 30 miles of NAS Jacksonville to provide expedited services. Items will be picked up and returned to FRCSE, with normal services required within 5 business days and expedited services within 3 business days. The contractor must be certified to AS9100 and ISO9001 standards for heat treating services. The SOW details security, OPSEC, and safety requirements the contractor must comply with.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #1

HEAT TREATMENT SERVICES STATEMENT OF WORK

06 August 2024

STATEMENT OF WORK

HEAT TREATMENT SERVICES FOR

FLEET READINESS CENTER SOUTHEAST (FRCSE)

Submitted by: Melanie Baumgartner Contracting Officer’s Representative, JAX HJ45000Digital Signature:

Alternate Contracting Officer’s Representative: Theresa Eigenbrode, JAX HJ45000 Approved by: Digital Signature:

DISTRIBUTION STATEMENT C: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND THEIR CONTRACTORS FOR ADMINISTRATIVE OR OPERATIONAL USE, 15 OCTOBER 2018. OTHER REQUESTS SHALL BE REFERRED TO FLEET READINESS CENTER SOUTHEAST (FRCSE), ACQUISITION AND PROCUREMENT GROUP, NAS JACKSONVILLE, 101 WASP STREET, BLDG. 229, JACKSONVILLE, FL 32212. 

1. SCOPE

The Fleet Readiness Center Southeast (FRCSE) is an industrial facility that reworks, repair, and overhaul various aircraft, engines, and components. As a result of working in an industrial environment, FRCSE requires off-site heat treatment services to support these operations. This Statement of Work (SOW) defines the heat treatment services required by FRCSE.

2.APPLICABLE DOCUMENTS
2.1APPLICABLE NAVY INSTRUCTIONS AND MANUALS
a.SECNAVINST 5510 seriesDepartment of the Navy (DoN) Personnel

Security Program

b. MIL-STD-1537C Electrical Conductivity Test for Measurement of Heat Treatment of Aluminum alloy (Eddy-Current Method) (Attachment A)

2.2 APPLICABLE FRCSE INSTRUCTIONS AND NOTICES

a. LPS 1020: Heat Treatment of Metallic Materials and Components Local Process Specification (Attachment B)

b. LPS 1025: Heat Treatment of Low Alloy Steels (Attachment C)

c. LPS 1030: Heat Treatment of Aluminum Alloys (Attachment D)

2.3 OTHER APPLICABLE DOCUMENTS

2.3.1 Certifications: The contractor shall be certified ISO9001:2015 and AS9100 Rev D (2016) (Quality Management Systems), for heat treating and related services for ferrous, non-ferrous, and special application alloys for aviation, space, and defense applications.

2.3.2 Standards: The contractor shall comply with the applicable:

2.3.2.1 Aerospace Material Specifications (AMS)

a. AMS 2658: Hardness and Conductivity Inspection of Wrought Aluminum Parts

b. AMS 2759/3: Heat Treatment Precipitation-Hardening Corrosion-Resistant, Maraging, and Secondary Hardening Steel Parts

c. AMS 2759/4: Heat Treatment Austenitic Corrosion-Resistant Steel Parts

d. AMS 2759/5: Heat Treatment Martensitic Corrosion-Resistant Steel Parts

e. AMS 2759/11: Stress relief of Steel Parts

f. AMS 2728: Heat Treatment Wrought Copper Beryllium Alloy Parts

g. AMS 2769: Heat Treatment of Parts in a Vacuum

h. AMS 2771: Heat Treatment of Aluminum Alloy Castings

i. AMS 2801: Heat Treatment of Titanium Alloy Parts

2.3.2.2 American Society for Testing and Material (ASTM)

a. ASTM A681: Standard Specification for Tool Steel Alloys

b. ASTM E18: Standard Test for Rockwell Hardness of Metallic Materials

c. ASTM E1004: Electromagnetic (Eddy-Current) measurements of Electrical Conductivity

2.3.2.3 Society of Automotive Engineer (SAE)

2.3.2.4 Occupational Safety and Health Association

a. OSHA Standard Number 1910.132: Occupational Safety and Health Standards / Personal Protective Equipment Footnotes:

1.SECNAVINST (Secretary of the Navy Instruction)
2.OPNAVINST (Office of the Chief of Naval Operations Instruction)
3.COMNAVAIRINST (Commander, Naval Air Forces Instruction)
4.NAVAIRINST (Naval Air Systems Command Instruction)
5.SECNAVINST 5510.30C DON Personnel Security Program
6.FRCSEINST (Fleet Readiness Center Southeast Instruction)

Note:

a. These applicable documents may be revised during performance of the contract. The contractor shall comply with the latest version.

3.REQUIREMENTS
3.1GENERAL REQUIREMENTS

The contractor shall provide all labor, supervision, tools, equipment, supplies, and any other necessary items required to properly process the Items FRCSE identifies as requiring heat treatment processing.

The Contractor shall be responsible for pickup and return of the Items to FRCSE. Heat treatment orders will be placed based on an as needed basis.

Note: The Government requires the Contractor to be located within 30 miles of the NAS Jacksonville, FL, FRCSE in order to have the option to deliver and pick up Expedited Items.

The government Technical Point of Contract (TPOC) on site will assist the contractor’s understanding of tasks as needed. All services shall be performed by skilled/qualified contract employees, hereinafter called the contractor.

The TPOC-assigned tasks will identify the urgency of the request by providing a required return delivery date. The contractor shall immediately notify the TPOC if a required return delivery date will not be met. Notification shall include the extent of and reason for delay.

3.1.2 TRAVEL

No travel is required.

3.1.3 CONTRACTOR REPORTING REQUIREMENTS FOR ALL FRCSE SITES

The contractor shall comply with the following reporting requirements.

a. Contractor Operations Security (OPSEC) Plan: The contractor shall develop, implement and maintain a facility level OPSEC Program to protect critical information to be used at the facility during the performance of this contract. A Draft OPSEC Plan shall be submitted to FRCSE Industrial Security Department, within 90 days of contract award. A Final OPSEC Plan is due 45 days from the date that the Draft OPSEC Plan is approved. Reference CDRL A001 Operations Security (OPSEC) Plan.

3.1.4WORK SCHEDULE
3.1.4.1Hours of Operation:

FRCSE Jacksonville Core working hours are 0600 to 1530 Monday-Friday. The Contractor shall provide the services and staffing necessary to successfully perform tasks specified in this SOW.

3.1.4.2 Federal Holidays:

Normally, the contractor will not provide services on the following Federal Holidays:

FEDERAL GOVERNMENT HOLIDAYS:

New Year’s Day
1st day of January
Martin Luther King Jr.'s Birthday
3rd Monday of January
Presidents Day
3rd Monday of February
Memorial Day
Last Monday of May
Juneteenth National Independence Day
19th day of June
Independence Day
4th day of July
Labor Day
1st Monday of September
Columbus Day
2nd Monday of October
Veterans Day
11th day of November
Thanksgiving Day
4th Thursday of November
Christmas Day
25th day of December

When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday observance. There are occasions when the FRC reduces operations in conjunction with the following holidays: Thanksgiving Day, Christmas Day, and New Year's Day which encompass additional non-holiday workdays and weekends. When such a notice is given, the contractor shall modify their support level for the reduced operations.

3.1.4.3 Installation Closure:

When Federal facilities are closed by the Government, or when Federal employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or any other Government facility related problem that prevents Federal personnel from working at the Government facility, contractor personnel assigned to work at that facility in support of such Federal employees shall follow their parent company’s policies.

While generally contractor personnel may not perform work on-site at a government facility without oversight from Federal personnel, in very limited circumstances, work being performed by contractor personnel may be deemed mission essential and performance of such mission essential work may be authorized to continue at the Government facility despite the facility being otherwise closed for normal operations. The circumstances permitting work being performed by contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant Contracting Officer must concur with any determination that work being performed by contractor personnel is mission essential.

3.1.5 SUBCONTRACTORS

Provisions stated herein shall be clearly and effectively communicated to all subcontractors providing support under this contract. All provisions of this SOW shall flow down to subcontractors providing support under this contract.

3.1.6 MANAGEMENT OF CONTRACTOR PERSONNEL

The Government will neither supervise contractor employees, nor control the method by which the contractor performs the required tasks. The contractor shall manage its employees and guard against any actions that are of the nature of personal services or give the perception of personal services.

a.Supervisory Authority. The contractor is responsible for delegating team lead and supervisory authority to its workforce members to manage the work and internal QA responsibilities. Therefore, the contractor shall designate one person onsite to act as the primary site supervisor and shall identify supervisors or designated team leaders to the FRCSE COR and TPOC within one working day of changes. Supervisors shall assume all administrative duties and responsibilities for the contractor’s personnel, to include daily verification of hours worked and tasks assigned. Team Leaders or Supervisors shall assign and manage government tasks.
b.Contractor personnel shall identify themselves as a Contractor in all verbal and written communication means while performing work for the Navy. When attending meetings in support of the Navy, Contractor personnel shall introduce themselves as a Contractor employee working for the Navy. Contractor personnel shall sign a non-disclosure statement relative to Government business sensitive information.
c.Work Records: Upon request, the contractor shall make available to the government completed records of work, results of internal quality inspections, personnel investigations/disputes, physicals, proof of certifications and/or experience and training. Work will be reviewed by the government on a systematic basis for accuracy and completeness.
d.The Government reserves the right to refuse access to our facility any Contractor employee who endangers persons or property, fails to maintain and/or obtain certification(s), and/or whose behavior is inconsistent with the requirements of this contract. In such cases, the Contracting Officer, or designated representative, will advise the Contractor of the reason for refusing the employee. The refusal of such an employee shall not relieve the Contractor of the requirement to provide sufficient qualified personnel to adequately perform the services as set forth herein.
3.1.7MOBILIZATION

3.1.7.1 POST AWARD CONFERENCE (PAC)

The contractor shall participate in a PAC which will be held after contract award. The PAC date shall be coordinated between the contractor and the PCO. The contractor shall be prepared to discuss its proposed mobilization approach with the government team. The purpose of the PAC is to introduce contractor and government personnel, discuss details of the upcoming effort and resolve any concerns that may arise as a result of the discussion. The conference will be held virtually or at the government's facility in Jacksonville, FL.

3.2 SECURITY

All Contractor personnel must be eligible to perform Non-Critical Sensitive work as defined by SECNAVINST 5510.30C. All Contractor personnel are required to have a favorably adjudicated Tier-3 investigation from the Defense Counterintelligence and Security Agency. The Contractor shall provide FRCSE Security Office with the applicable forms for CAC application once contractor is eligible. The FRCSE Security Office may deny the Contractor access to Government facilities and information and may prohibit the Contractor from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor's eAPP or existing Defense Information Security System (DISS) record, in such cases, the Contractor employee may not perform work on the Contract.

The Contractor Facility Security Officer (FSO), or equivalent, (if applicable) shall pre- screen all potential employees for the contract in DISS. The Contractor shall not submit to the Government for processing documents concerning an individual with a past unfavorable determination or denied/revoked eligibility. Furthermore, if the Contractor submits documents concerning an individual with “No Determination Made” recorded in DISS, the individual, if employed by the Contractor, will not be granted a Common Access Card (CAC), but instead will be issued a 30-day visitor pass for access to the base. The pass will need to be renewed until final adjudication by Defense Counterintelligence and Security Agency (DCSA) Consolidated Adjudication Services (CAS). If it is determined that the “No Determination Made” will result in extended delays in CAC issuances; The Government Security Office may determine the individual ineligible for access within FRCSE facilities and the Contractor will need to provide a suitable replacement. In the event a prospective Contractor employee has an incident report on record in DISS, the Contractor shall exercise due diligence and investigate the underlying basis for the incident report, and the Contractor shall use sound judgment to determine whether the individual is trustworthy and suitable to provide support under the contract, thereby warranting submission of the required documents to the Government for processing immediately. If change in personnel occurs, the Contractor shall provide updated Visit Authorization Letter (VAL) or DISS visit request. The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of controlled unclassified information and to control distribution of controlled unclassified information in accordance with NISPOM Rule (32 CFR Part 117), National Industrial Security Program Operating Manual (NISPOM), and SECNAVINST 5510.36B. All Contractor facilities shall provide an appropriate means of storage for controlled unclassified information and materials. All controlled unclassified information shall be appropriately identified and marked as Controlled Unclassified Information in accordance with DoD Instruction 5200.48, Controlled Unclassified Information (CUI).

Controlled Unclassified Information including Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, Controlled Unclassified Information (CUI). available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24 (Distribution Statements on Technical Documents); and have this statement displayed per DoDI 5230.24, Enclosure 3.

All controlled unclassified technical information shall be appropriately identified and marked with the following distribution statement(s):

PUBLIC RELEASE. Any controlled unclassified information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S. government authority. Proposed public releases shall be submitted for approval prior to release through: Commander, FRCSE Security Office, 101 Wasp Street, Building 229 NAS, Jacksonville, FL 32212.

3.2.1 CITIZENSHIP REQUIREMENT

All contractor personnel performing work for the FRC shall provide proof of United States citizenship.

3.2.2 INVESTIGATIVE REQUIREMENTS

a. After providing citizenship proof, the individual shall submit to a full security back- ground check prior to being given access to the FRC computer network IAW DODM 5200.02 Procedures for the DOD Personnel Security Program of 3 April 2017, SECNAVINST 5510.30C DON Personnel Security Program, FRCSEINST 5510.14 Information, Personnel and Industrial Security Procedures and FRCSEINST 5510.15B Electronic Key Management System Documentation and Storage.

b. Unclassified: All Contractor personnel shall be eligible to perform Non-Critical/ Sensitive work as defined by DoDM 5200.02 Personnel Security Program and SECNAVINST 5510.30C DON Personnel Security Program. All Contractor personnel are required to have a favorably adjudicated Tier-3 investigation from the DCSA. The Contractor shall provide FRCSE Security Office with the applicable forms for CAC application once contractor is eligible. The Government Security Office may deny the Contractor access to Government facilities and information and may prohibit the Contractor from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor’s e-APP, in such cases, the Contractor employee may not perform on the Contract.

c. Classified: The Contractor is responsible for ensuring that all personnel receive the requisite investigation and are favorably adjudicated IAW DoD 5220.22-M, National Industrial Security Program Operating Manual. Contractor employees who fail to meet security clearance requirements may not access classified information or perform sensitive duties. In such cases, the Contractor employee may not perform on the contract.

3.2.3 COMMON ACCESS CARD (CAC) / PUBLIC KEY INFRASTRUCTURE (PKI), SYSTEM AUTHORIZATION ACCESS REQUEST NAVY (SAAR-N)

3.2.3.1 SAAR-N:

All contractor personnel requiring access to Government IT systems shall have approved forms on file, and complete required Annual Information Awareness Training pursuant to applicable clauses.

3.2.3.2 COMMON ACCESS CARD (CAC) / FRC BADGES:

Only authorized Contractors will receive U.S. government Common Access Card (CAC) and FRCSE badge. This is verified by the submission of the VAL containing all first, middle and last names of all eligible Contractors assigned to perform contract duties within FRCSE facilities or a Defense Information System for Security (DISS) visit request. The CAC shall be the principal identity credential for supporting interoperable access to installations, facilities, buildings, controlled spaces and government IT systems. Upon receipt of the DEERS Enrollment DD Form 1172, the Contractor will initiate the request for the contractor to complete a Standard Form 86 (SF 86, Questionnaire for National Security Positions). An SF 86 will not be required for an individual currently holding a valid national security clearance. A Tier 3 background investigation or equivalent is required for issuance of the CAC with full access. The CAC and FRC Badge may be issued granting facility access only upon favorable return of the Federal Bureau of Investigation (FBI) fingerprint check, confirmation of no existing adverse information in the DISS and submission of a completed SF 86 application. The CAC will be updated with full access (facility and IT systems) upon return of a favorable determination on the Tier 3 background investigation from the DCSA CAS.

3.2.4 INFORMATION SECURITY (INFOSEC):

Information or data that the contractor accesses shall be handled at the appropriate classification level, including unclassified information, which shall be handled as “Controlled Unclassified Information (CUI)”. Distribution is authorized to the FRCSE and supported Activity only. The contractor shall safeguard all Sensitive Information, and CUI. The contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of controlled unclassified information and to control distribution of controlled unclassified information in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), and SECNAVINST 5510.30C DON Personnel Security Program. All contractor facilities shall provide an appropriate means of storage for CUI and materials. All CUI shall be appropriately identified and marked as ”Controlled Unclassified Information” in accordance with DoDM 5200.01, Information Security Program: Controlled Unclassified Information (CUI) Volume 4 (enclosure 3).

3.2.4.1 Marking:

All documents shall have the appropriate distribution statement in accordance with DoD Instruction 5230.24, Distribution Statements shall be referred to FRCSE Security Office, 101 Wasp Street, Building 229 NAS, Jacksonville, FL 32212.

3.2.4.2 Public Release:

Any CUI pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S. government authority. Proposed public releases shall be submitted for approval prior to release through FRCSE Security Office, 101 Wasp Street, Building 229 NAS, Jacksonville, FL 32212.

3.2.4.3 OPSEC:

The contractor shall comply with activity OPSEC program instructions, guidance and contribute to organization-level OPSEC efforts. The contractor shall include OPSEC as part of its ongoing security awareness program and take all required activity OPSEC training. Training certification records should be forwarded initially and annually to the FRCSE Industrial Security Department. The contractor shall protect identified critical information, sensitive unclassified information and activities, which, if divulged, could further compromise classified or sensitive information or operations, or degrade the planning and execution of operations performed by the RO and contractor in support of the mission. Reference CDRL A001.

The contractor shall develop, implement, and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. This program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Presidential Memorandum 28 (NSPM 28), and at a minimum shall include:

(1)Assignment of responsibility for OPSEC direction and implementation.
(2)Issuance of procedures and planning guidance for the use of OPSEC techniques toidentify vulnerabilities and apply applicable countermeasures.
(3)Establishment of OPSEC education and awareness training.
(4)Provisions for management, annual review, and evaluation of OPSEC programs.
(5)Flow down of OPSEC requirements to subcontractors when applicable.

While performing aboard NAVAIR or NAVAIR sites, the contractor shall comply with facility OPSEC program instructions and contribute to organization-level OPSEC efforts; include OPSEC as part of its ongoing security awareness program; take all required Agency training; be responsive to the Supporting OPSEC Manager on a non-interference basis; and protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring Office (RO) and contractor in support of the mission.

3.3DETAILED SUPPORT REQUIREMENTS
3.3.1SUPPORT REQUIRED

The contractor shall provide Heat Treat Services, Inspection/Hardness/Conductivity Testing, Certification of Conformance, and Furnace Charts in accordance with the certifications and standards outlined in Section 2.0 Applicable Documents.

If the contractor is unable to heat treat the Items/s for any reason, the contractor shall notify the FRCSE TPOC, via electronic email, within 24 hours of discovery for disposition instructions.

3.3.1.1 Heat Treatment Services:

FRCSE shall determine items in need of Heat Treatment services. The TPOC shall contact the vendor to arrange pick up of items needing off-site heat treating at the contractor facility. Items will be picked up and dropped off at the following address:

Fleet Readiness Center Southeast 101 Wasp Street Jacksonville, FL 32212-0016 Attn-Bonded Material Storage (BMS) / BLDG 101/columnA16 POC: Sonseeah (Seeah) Meeker, 904-790-4482 Alternate POC: Jimmy Britt 904-790-4301 or DJ Fiordiliso 904-790-5421 TPOC/Manufacturing Direct Email: frcse_manufacturing@navy.mil

If the contractor is unable to pick-up the same day items marked as Expedited that the government has ready for pick-up before noon, the government reserves the right to deliver the item to the contractor facility for heat treatment.

Heat treatment services include:

a. Aluminum/Steel/Titanium/Beryllium Copper heat treating

b. Precipitation and Age hardening

c. Vacuum heat treating (tempering, hardening, high pressure quenching)

d. Hot oil quenching

e. Solution heat treating

f. Water quenching

g. Neutral hardening

h. Hardening and tempering

i. Carburization

3.3.1.2 Inspection/Hardness/Conductivity Testing: The contractor shall provide Inspection/Hardness testing in accordance with ASTM E18 (Standard Test for Rockwell Hardness of Metallic Materials). The contractor shall provide Conductivity Testing with ASTM E1004 (Electromagnetic (Eddy-Current) measurements of Electrical Conductivity), MIL-STD-1537 Electrical Conductivity Test for measurement of heat treatment of aluminum alloy, (Eddy-Current method), AMS 2658 Hardness and Conductivity Inspection of wrought Aluminum parts, LPS 1025 Heat Treatment of Low Alloy Steels and LPS 1030 Heat Treatment of Aluminum Alloys.

3.3.1.3 Certifications of Conformance: A Certificate of Conformance will be required for all items sent to contractor under this contract.

3.3.2 DELIVERY REQUIREMENTS.

3.3.2.1 Delivery Documentation:

The contractor shall provide the following information for each Item furnished to the contractor for services

a. Government Supplied Heat Treatment Processing Form will be provided for each item to be heat treated. The form will be signed by the contractor’s courier upon picking up each item at FRCSE for treatment and delivering each item when treatment is complete.

b. Inspection/Hardness/Conductivity test results

c. Certifications of Conformance

d. Furnace Charts-which include Copy of the heat treatment recipe, Process temperature chart from start to finish, Heat treatment process logs (Equipment used, Temperature, Soak Time, Quench (Air, Oil, Water, Furnace, Gas))

3.3.2.2 Delivery responsibilities:

a. Once an order has been identified, the TPOC will contact the contractor to arrange for pick-up of the items needing off-site heat treatment at the contractor’s facility.

b. The contractor shall complete the required services, notify the TPOC via electronic email upon completion, and return the Item back to FRCSE within five (5) business days of receipt of the Items for normal heat treat services.

On some occasions, FRCSE will require the Contractor to Expedite the completion of heat treatment services in three (3) business days.

For all Expedited Orders the contractor shall notify the TPOC immediately upon completion and return the Items back to FRCSE within three (3) business days of receipt of the Items.

c.The government will provide a completed form with the Heat treatment requested item. The form will provide the following information:
1.Expedited or Regular Processing Required
2.Work Order Number
3.Work Order Operations Number
4.BURR Tag
5.FRCSE TPOC contact information
6.Part number
7.Quanity
8.Weight (in pounds)
9.Part Dimensions
10.Alloy/Alloy form
11.Starting Metal Condition
12.Required Final Condition
13.Heat Treatment Services Required
14.Misc. Instructions/notes
15.Expected date to be returned to FRCSE

d. The TPOC will be responsible for tracking all orders placed and the total number of hours used for processing, for all items that are sent to and received back from Contractor.

e. If the Contractor is unable to heat treat the Item/s for any reason, the Contractor shall notify the TPOC within 24 hours of discovery for disposition instructions.

3.4 GENERAL SAFETY REQUIREMENTS:

The contractor shall comply with applicable federal, state and local codes and standards, including safety and occupational health requirements. The basis for safety will be technical OSHA Rules, Regulations & Instructions related to equipment and contractor employee health and safety as per the Department of Labor (DoL) and local state OSHA Rules, Regulations & Instruction, including 29 CFR 1910, and any other directive related to employee safety. The contractor is responsible for ensuring its employees comply with safety requirements.

a.Local Safety Requirements: Local Safety Requirements shall be observed by contractor employees while traveling, working, or using equipment in conjunction with performance of their duties under the contract.
b.Contractor Personal Protective Equipment (PPE): The contractor shall comply with OSHA Standard Number 1910.132 for all tasks that they perform under the contract. The government will provide all necessary PPE, with the exception of safety glasses and steel toed shoes/boots.
c.General Safety Rules:
1.Contractor personnel shall smoke in allowed designated locations only.
2.Contractor personnel shall wear hearing conservation, sound attenuators when conditions warrant.
3.Contractor personnel shall wear steel-toed shoes when working in the hangar, on the flight line, or in shop spaces that are identified as foot hazard areas.
4.Contractor personnel shall be familiar with firefighting equipment available in the hangar, shops, and flight line.
5.Contractor personnel shall comply with all local safety instructions to include the wearing of all PPE required by specific job requirements and compliance with activity FOD Program.
3.5RESERVED
3.6INCIDENT REPORTING AND INVESTIGATION

In the event of an incident, the contractor shall immediately contact appropriate local emergency responders.

a. The contractor shall report within two hours to the TPOC or the COR all available facts relating to each instance of actual or threat of damage to government property or personnel.

b. If the government elects to investigate the incident, the contractor shall cooperate fully and assist the government personnel until the investigation is completed and all action items resolved

3.7RESERVED
3.8RESERVED
3.9RESERVED
3.10ACRONYMS
CACCommon Access Card
CASConsolidated Adjudication Services
CDRLContract Data Requirements List
CFRCode of Federal Regulations
CORContracting Officer's Representative
DCSADefense Counterintelligence and Security Agency
DISSDefense Information Security System
DoNDepartment of the Navy
DoDDepartment of Defense
DoLDepartment of Labor
FBIFederal Bureau of Investigation
FRCSEFleet Readiness Center Southeast
FSOFacility Security Officer
IAWIn Accordance With
NASNaval Air Station
NAVAIRNaval Air Systems Command
NAVAIRINSTNaval Air Systems Command Instruction
NSNaval Station
NWCFNavy Working Capital Fund
OHSASOccupational Health and Safety Assessment Series
OPSECOperations Security
OSHOccupational Safety & Health
OSHAOccupational Safety & Health Administration
PACPost Award Conference
PCOProcuring Contracting Officer
PKIPublic Key Infrastructure
PPEPersonal Protective Equipment
SAAR-NSystem Authorization Access Request Navy
SECNAVINSTSecretary of the Navy Instruction
SOWStatement of Work
TPOCTechnical Point of Contact

image1.jpeg image2.png image3.png

File details come from the government source that posted it. Updated .