This document is a Statement of Work (SOW) for a federal contract opportunity to provide Grit Removal Services on the USCG Fast Response Cutter DONALD HORSLEY. The contractor shall remove approximately 160 tons of 80 mesh garnet grit from inside the enclosure, dust drums, dust collector, surrounding area, and the deck of the vessel. The period of performance is from June 13, 2024 to June 25, 2024, with work hours between 7 PM and 6 AM daily, including weekends and holidays. The contractor must have the capability to remove 15 tons of grit per day. The government will provide utilities, material handling services, and disposal site information, while the contractor must furnish all other equipment, personnel, and supervision required to complete the work to a commercially reasonable standard. Payment will be made upon completion of work and acceptance by the Contracting Officer.

View the file

Other files for this federal contract opportunity

Other files attached to 80 MESH GARNET GRIT REMOVAL, newest first.
File Type Posted
70Z04024Q60136Y00 RFQ.docx DOCX document
WAGE DETERMINATION.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

PR2124404Y4274K96004, TAS:70X4743, FRC DONALD HORSLEY HULL #1117

NONHAZARDOUS GRIT REMOVAL AND DISPOSAL

POC: Jann Blevins, Cell: (410) 320-1286, Email: Jann.A.Blevins@uscg.mil

SCOPE: The Contractor shall provide all personnel, equipment, tools, supervision, and other items necessary to perform Grit Removal Services FROM INSIDE THE ENCLOSURE AND FROM THE DECK OF THE VESSEL, DUST DRUMS, DUST COLLECTOR, and SURROUNDING AREA except for those items specified as government furnished property and services. The contractor shall perform to the standards in this order, if no standards are specified then to a commercially reasonable standard.

· Blast grit removal and disposal inside an enclosure containing a 154’ Fast Response Cutter and onboard the Cutter to include: the entire concrete ground; the enclosure’s metal scaffolding and wheel track channels; the surfaces, angles and ship lift carts and foundation; dust collector drums; the ship’s exterior main deck and the gangway and stair/steps tower to the ship. The following are option items: Boatswain Storage (2-A-0-A), FWD damage control locker (1-10-2-A), and AFT damage control locker (1-34-3-A).

· Approximately 160 tons (by weight) of grit is to be removed from inside the enclosure and from the DECK OF THE VESSEL and not to exceed the requesting amount without notifying PROCUREMENT OFFICAL. Contractor must have the capability of removing 15 tons a day. All grit shall be removed regardless of condition; including wet and compacted grit which might require the use of shovels and other removal methods beyond vacuuming.

· All contractor equipment, including hoses, containers, and brooms must be stored outside the enclosure following the completion of work each day. Clean around blasting equipment, such as blasting hoses and nozzles; do not touch them as the hoses and attached flashlights have been accidentally damaged in the past due to movement.

· Period of performance will be from 06/13/2024 to 06/25/2024 Work hours will be between 7 PM and 6:00 AM , Unless notified directly by the Ship Superintendent, work shall be performed every day, including weekends and holidays, regardless of the amount of grit and debris present.

· On the last day of the performance period, and after removal of all sand blasting grit from designated areas, the contactor shall vacuum clean the ground and steel wheel track channels to a “broom swept” condition. “Broom swept” is defined as free of all visible dirt, dust and debris. **See Photos below for examples of acceptable and unacceptable final conditions.

Disposal and Measurement: The Contractor will provide a weight ticket showing TARE weight and GROSS loaded weight from a certified commercial scale approved by the Contracting Officer. Contractor selected disposal sites must be an authorized Non-Hazardous Grit disposal site.

Weight tickets and non-regulated waste manifests shall accompany invoices for each removal, so that payment may be processed for each service performed. Additionally, a copy of all weight tickets and invoices shall be submitted to the shop planner on the next business day after disposal with the contract number and delivery order number for services clearly marked on the weight ticket and invoices.

Disposal of the sandblast grit shall meet all local, state, and federal standards and regulations, and is to be substantiated by the submittal of a non-regulated waste manifest to the Contracting Officer or the Contract Administrator and additional copy shall be furnished to the authorized caller. The Contractor shall be solely responsible for the transportation and proper disposal of the grit. If Contractor elects to use dumpsters for holding or transportation of grit, dumpsters must be covered to prevent grit from getting wet and becoming airborne.

The Coast Guard Yard has no control over landfill rates and cannot guarantee either the cost or the availability of disposal sites. The Contractor shall be responsible for locating primary yard alternative disposal site.

GOVERNMENT FURNISHED ITEMS AND SERVICES:

Services: The Government shall provide material handling services to load and unload Contractor machinery and for the set up of equipment. The Coast Guard Yard shall endeavor to provide timely assistance as requested by the Contractor. The Contractor shall provide 48 hour notice to the Government when there is a need for material handling services.

Utilities: The Government will provide water, compressed air, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work.

Compressed Air: The Government shall provide a source of compressed air for Contractor machinery. The Contractor shall be responsible for ensuring that their compressed air hookup connections are compatible with the Yard’s compressed air sources.

Electricity: The Government shall provide up to 200 amps and up to 480 volts of electrical services.

Hazardous Materials and Waste: If it comes to the Contractors attention that the coating materials requiring removal are suspected hazardous material and would produce hazardous waste (Code of Maryland Regulations, Title 26, Subtitle 13 and 40 CFR 260-267), the Contractor must cease work immediately and notify the COR. If the surface coating being removed contains lead, cadmium, chromium or Polychlorinated Biphenyl or PCB’s, the Contractor will notify the COR immediately. The Government will have the responsibility to dispose of any hazardous materials and waste. The Contractor will have the responsibility to provide its full cooperation with the removal and disposal process.

CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:

General: The Contractor shall furnish all equipment and services required to perform work under this SOW, other than those explicitly addressed in government furnished services.

The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the time period and quantity specified.

Nonhazardous Grit Removal and Disposal: The Contractor shall perform all services, management, planning, supervision, personnel, labor, materials, transportation and equipment necessary required by the task order to a commercially reasonable standard and in accordance with this SOW.

Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning equipment and tools to complete assigned work. The following tools and equipment are required:

a. Safety Equipment

b. Trucks – Two trucks are required with two hundred (200) feet of hose for each truck.

Equipment Standards: Contractor’s trucks and equipment shall be maintained in an operable condition that meets all Federal, State of Maryland, and local safety requirements. All equipment must meet the permissible noise limits in accordance with this SOW.