SOW GRAVING DOCK KEEL BLOCKS MATERIAL FY22.doc
DOC document 62 KB Posted
- Attached to
- NBSD Graving Dock Keel Blocks Federal contract opportunity
- Solicitation number
- N55236-22-R-0013
About this file
This sources sought announcement from the Department of the Navy Naval Sea Systems Command details requirements for graving dock keel blocks at the Naval Base San Diego. The Navy seeks to build 83 new concrete docking blocks, renew hardwood on 80 existing blocks, and dispose of 50 expired blocks. Interested parties must be able to provide all required materials by May 20th, 2022. Responses are requested by March 29th to include company information and certification as a small or large business according to NAICS codes 237990 or 321912. The purpose of this announcement is to identify potential sources to meet the Navy's requirements for graving dock keel block materials and repairs at the Naval Base San Diego.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
22 March 2022
1. SCOPE:
1.1 TITLE:
GRAVING DOCK BLOCKS – NEW KEEL BLOCKS
AND DISPOSE OF OLD BLOCKS
1.2 IDENTIFICATION:
UIC: 55262 ICN/KEP OP: 38GD0LOE /S01
SHIP/COMMAND: SWRMC GRAVING DOCK C-980
1.3 LOCATION:
SHIP/COMMAND ADDRESS: SWRMC CODE 980
3755 BRINSER ST. SUITE 1
SAN DIEGO CA, 91236
1.4
POC:
GRAVING DOCK Division Head:
Annie Tipton 619-572-5010
2. REFERENCES:
2.1 NAVSEA Drawing No. 845-5500948
3. JOB DESCRIPTION:
3.1 Vendor will build, deliver, and install 83 EA new Docking Blocks and renew the hard wood on 80 EA existing blocks listed on paragraph 4.1.
3.2 Vendor will dispose 50 each expired blocks in accordance with NAVSEA Drawing No. 845-5500948 and or NAVSEA Standard Items in accordance with reference 2.0, 2.2, 2.3, 3.0, 3.1, 3.2, 3.2.1, 3.2.2, and 3.3 at Contractor’s or Graving Dock.
3.3 Remove and dispose of existing White Oak Timbers on (80 EA total) keel blocks (top and bottom) 3.4 Dispose 50 EA concrete keel block with their timbers (300 EA timbers)
3.5 Install new White and Red Oak Timbers (83 EA total) New and (80 EA total) existing keel block “Top and Bottoms”
4. FEATURES REQUIRED:
4.1
Material List
| NOMENCLATURE |
| PART NUMBER |
| NSN |
| UNIT OF ISSUE |
| QTY |
| NEW FIXED CONCRETE KEEL BLOCKS 42” X 48” X 50” |
| N/A |
| N/A |
| EA |
| 83 |
| NEW WHITE OR RED OAK TIMBER |
| N/A |
| N/A |
| EA |
| 83 |
| NEW WHITE OR RED OAK TIMBER ON EXISTING KEEL BLOCK “TOP & BOTTOM” NOTE: 6 EA TIMBERS PER KEEL BLOCK |
| N/A |
| N/A |
| EA |
| 80 |
5. NOTES:
5.1 Vendor shall pick-up and replaces any incorrect materials or materials with any discrepancies that were delivered to SWRMC EPF Graving Dock Code 980 WITHOUT additional cost to the Government.
5.2 Vendor shall submit a MOD RDD extension request as soon as possible if known source vendor CANNOT meet RDD WITHOUT additional cost to the Government.
6. DELIVERY LOCATION:
6.1 Southwest Regional Maintenance Center (SWRMC)
Graving Dock Code 980 3755 Brinser Street Suite 1, San Diego CA 92136
7. PERIOD OF PERFORMANCE/REQUIRED DELIVERY DATES:
7.1 Required Delivery Date: 20 MAY 2022
File details come from the government source that posted it. Updated .