SOW GI 16 17 cabinets.pdf
PDF 124 KB Posted
- Solicitation number
- 70Z02920QPNH053
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_70Z02920QPNH053.pdf | ||
| 20200528_095235.jpg | JPG image | |
| 20200528_095213.jpg | JPG image | |
| output(3).jpg | JPG image | |
| 20200528_095156.jpg | JPG image | |
| output(4).jpg | JPG image | |
| output(2).jpg | JPG image | |
| 70Z02920QPNH053_Questions_Answers.pdf | ||
| Solicitation 70Z02920QPNH053_Mod_1.pdf | ||
| 70Z02920QPNH053_Questions_Answers.pdf | ||
| FAR CON-FFP.pdf | ||
| Solicitation 70Z02920QPNH053.pdf | ||
| WD LA20200038.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
USCG Base New Orleans
New Orleans, LA 70129
STATEMENT OF WORK
FOR
USCG Base New Orleans Housing
Grand Isle, LA 70358
CERTIFICATION OF MAINTENANCE TO REPLACE ENTIRE KITCHEN CABINETS IN
GOVERNMENT OWNED HOUSING AT UNIT #16 AND 17 PARATUS PL. GRAND ISLE
LA, 70358 FOR USCG BASE NEW ORLEANS HOUSING
PART 1 GENERAL
1.1 INTENT: Replace Units 16 and 17 Kitchen Cabinets.
1.2 SCOPE: This contract covers a service agreement that meets or exceeds the requirements covered herein and detailed in section 1.05 below.
1. Provide all kitchen cabinets and counter tops as per diagram “counter is to be quartz”.
2. Provide price quote with install.
3. Provide install tech “if not with associated with vender and vise verse”.
4. Insure tech will cut all holes for all sink, vents, drain and supply lines that run through cabinets.
5. Install cabinets, molding, hardware, and counter tops.
6. Reinstall microwave, vent hood exhaust, dishwasher lines, and ice maker line
“if needed”.
7. Caulk and seal all seams and openings.
1.3 GOVERNMENT FURNISHED: N/A.
1.4 CONTRACTOR FURNISHED: All labor, materials, and supervision in order to accomplish the below requirements
1.5 REQUIREMENTS: The Contractor shall meet the desired outcome listed below and perform to the standards indicated.
A. Contractor is to purchase all needed supplies and materials.
B. Contractor is to provide certification and insurance paper work.
C. Contractor is to provide Safety Policy “COVID-19”
D. Conduct site visit. “if needed”
E. Remove and disposal of all damaged materials.
F. Install new and needed parts.
G. Fix any damage cause by tech, vendor, or contract work party.
H. Read all attachments for desired outcome.
I. Test and certify all working function and pressures.
J. After inspection, contractor /vendor shall receive payment.
PART 2 INSPECTIONS AND ACCEPTANCE
2.1 Contracting Officer: The Contracting Officer has the overall responsibility for the administration of this contract. He or she alone is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, details or delivery schedules. The Contracting Officer may delegate certain technical responsibilities to a technical representative.
2.2 Inspection: Contractor will be accompanied by a member of Base New Orleans Housing
Office for duration of service visit. Contractor will provide all required documentation for service visit at the conclusion of servicing.
2.3 PR: