SOW Generator Control System Repair.pdf
PDF 131 KB Posted
- Attached to
- Generator System Repair Service -West Point FY24
- Solicitation number
- W911SD24R0145
About this file
This document is a Sources Sought Notice for a federal contract opportunity to repair the Generator Control System at the United States Military Academy at West Point. The key details are:
The U.S. Government desires to procure services to repair the Caterpillar 3512B (1230KW) generator control system in the central power plant, which can no longer automatically start due to changes made at Substation B. The required work includes reprogramming the automatic control system to restore black start capability to the generator. Additional work on the generator and/or commercial buses may also be needed.
This is a small business set-aside opportunity, with an anticipated NAICS code of 811310 (Commercial & Industrial Machinery Repair and Maintenance Services). The government is seeking responses from interested small businesses, including 8(a), small disadvantaged, HUBZone, service-disabled veteran-owned, and women-owned, to determine capability. Responses are due by June 21, 2024 and should include company information, experience, pricing, and recommendations to improve the procurement approach.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
West Point Generator Control System Repair
1. PROJECT SUMMARY:
The Caterpillar 3512B (1230KW) in the central power plant is no longer capable of automatically starting as it was at the completion of the Generator #1 Control System Upgrade. The reason for the generator being unable start automatically is due to the changes made at Substation B. Reprogramming the automatic control system in the central power plant will be required to return black start capability to the Caterpillar 3512B.
Additional work on the generator and/or commercial busses may be required as well.
2. SCOPE OF WORK:
The contractor will provide the necessary field service personnel, tools, materials and approved test equipment to perform the scope of work as described herein. The contractor shall review the existing PLC and HMI screens and make an onsite visit to understand the current state of the system.
No electrical or mechanical field work will be performed.
3. COMPLETION:
Upon completion of the software research and investigation, the contractor will supply a field report highlighting the findings and recommendations for how to restore the black-start capabilities of the caterpillar 3512B. Any additional findings that may impact the function of the Caterpillar 3512B should also be included in the report.
4. DELIVERY:
The scheduling of work will be mutually agreed upon between the Government and the contractor.
5. QUALIFICATIONS / CLARIFICATIONS:
• All work to be completed at straight time, Monday through Friday except for scheduled outages, if necessary.
• There will not be any applicable sales tax.
6. SAFETY TRAINING OF CONTRACTOR FIELD PERSONNEL:
All contractor field personnel received training to comply with OSHA CFR1910 Electrical Safety Standard, which sets minimum safety rules and practices for the design, operation, and maintenance of high-voltage systems (over 600 volts). Safety standards are in place to meet or exceed NFPA 70E requirements, and appropriate Personal Protective Equipment (PPE) have been issued.
The customer is responsible to ensure that any supporting personnel have also be fully trained in electrical safety and provided with the appropriate personnel protective equipment.
7. SAFETY ARC-FLASH PROVISIONAL STATEMENT:
The customer supplied Arc-Flash study along with their labeled equipment to meet NFPA requirements will be used to determine the Personal Protective Equipment (PPE) required to perform the work required for this proposal. When a current study and labeling is not available, the time required to determine the proper PPE will be at the current rate per hour, unless included within the contractor scope of work. The contractor will not perform work activities in situations where the proper level of PPE is not practical. At no time will work be performed when the arc-flash exposure levels are above 40 cal/cm2.
8. DIVISION OF RESPONSIBILITY
Contractor Responsibilities:
• The contractor shall furnish test engineers, field technicians, support personnel, tools, equipment, materials, supplies and transportation as required.
The Government Will Be Responsible For The Following:
• Supplying a complete set of electrical plans, including the plant single-line diagram, specifications, and any pertinent change orders to the contractor before commencement of work.
• Providing free access to equipment within their facility.
• Ensuring that all equipment is available upon arrival of the contractor personnel, including removal from service to permit continuous progression of work. Delay time in making equipment available will be treated as an extra.
• Identifying site contact for this project.
• Coordinating all outages and perform all switching to de-energize and isolate equipment to be serviced.
• Ensuring that all circuits to be de-energized have been clearly identified and that all plant personnel and downstream operations are aware of the required outage date, time and duration. This includes maintaining power to vital or necessary plant equipment and processes during the performance of this scope of work.
• Supply a suitable and stable source of power for operation of test and motorized equipment at each test site when normal power is removed or authorize The contractor to obtain a source of auxiliary power, The contractor shall specify requirements. Any non-standard generators rentals will result in a price adder to this proposal.
• Providing a place to receive and unload replacement equipment, test equipment or other supplies.
| West Point Generator Control System Repair |
| 1. PROJECT SUMMARY: |
| 2. SCOPE OF WORK: |
| 3. COMPLETION: |
| 4. DELIVERY: |
| 5. QUALIFICATIONS / CLARIFICATIONS: |
| 6. SAFETY TRAINING OF CONTRACTOR FIELD PERSONNEL: |
| 7. SAFETY ARC-FLASH PROVISIONAL STATEMENT: |
| 8. DIVISION OF RESPONSIBILITY |
| Contractor Responsibilities: |
| The Government Will Be Responsible For The Following: |
File details come from the government source that posted it. Updated .