This Statement of Work (SoW) details electrical equipment inspection, testing, and repair services for the U.S. Government Publishing Office (GPO) Power Branch. The project involves comprehensive testing and inspection of 96 low-voltage and 52 medium-voltage circuit breakers and protective relays across GPO's 1.5 million sq. ft. campus, requiring a NETA-certified contractor to perform secondary injection testing, verify trip settings, calibrate breakers, and update one-line diagrams.
Key requirements include delivering bi-weekly status updates, NETA MTS 2023 test reports, and two-year certification labels for each breaker. The work must be completed within 14 weeks from award, performed Monday-Friday from 7:00 AM - 3:00 PM EST at 732 North Capitol Street NW in Washington, DC. Strict security protocols are in place, including daily vehicle and tool inspections, U.S.-based personnel requirements, and mandatory visitor badge protocols. The contractor is responsible for all travel, equipment, and incidental costs, and must adhere to GPO safety guidelines and NFPA/OSHA requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SoW) for
GPO _ ELECTRICAL EQUIPMENT
INSPECTION, TESTING AND REPAIR
Facilities Management / Power Branch
Statement of Work (SOW) for
THE INSPECTION, TESTING AND REPAIR OF ELECTRICAL EQUIPMENT (MEDIUM
AND LOW VOLTAGE BREAKERS and RELAYS)
1. BACKGROUND:
The Government Publishing Office (GPO) Power Branch of the Facilities Management Division requires a NETA-certified contractor to inspect, test, and repair electrical breakers and protective relays throughout GPO’s 1.5 million sq. ft. campus. Breakers controlling critical incoming feeds require periodic testing to ensure safe, reliable operations and to protect personnel from fire, electrocution, or potential loss of life.
2. SCOPE: The contractor shall provide all labor, materials, supervision, tools, and reporting necessary to complete the following:
• Inspection of electrical control equipment (breakers and relays).
• Testing of equipment in accordance with NETA MTS 2023 standards, using required and optional tests.
• Secondary injection testing only; primary injection is NOT required.
• Field repairs when feasible (major repairs or component replacements require prior GPO approval).
• Reporting on all inspected/tested equipment.
• Update existing one-line drawings and AutoCAD originals as required.
• Contractor must deliver updated AutoCAD (.DWG) files and PDF versions.
Transformers are not included in this scope of work.
3. LIST OF EQUIPMENT:
The contractor shall inspect and test the equipment as outlined in the Detailed Equipment List that will be provided by the Power Branch, including but not limited to:
a) 96 Low-Voltage Circuit Breakers
• ABB breakers – Substation 9
• (9) Substation #9 Breakers: ABB
• (16) Substation #11 Breakers: Siemens
• (24) Substation #12 Breakers: Square D
• (23) Substation #10 Breakers: Square D
• (22) 480 Volt Switchboard Breakers, 1st floor Power Branch: Square D
• (2) FIRE PUMP GE Breakers – 208V, 2500A
b) 52 Medium-Voltage Breakers & Relays
• (26) 5kV & 15kV MV breakers
• Protective Relays for above circuit breakers
4. SPEC• IFIC TASKS:
• Perform testing using NETA MTS 2023 test methods and templates.
• Verify and document trip settings according to manufacturer specifications.
• Calibrate breakers using current and in-balance criteria.
• Perform secondary injection testing only (no primary injection).
• Restore all breakers to service after testing.
• Label each breaker with a two-year inspection certification.
• Rack breakers in/out as required.
+ Contractor racks the breakers.
+ GPO personnel will perform all breaker open/close operations.
• Update one-line diagrams as needed to reflect changes or corrections.
• Note: Cleaning of switchgear is NOT required for this project.
5. DELIVERABLES
The contractor shall provide:
1. Bi-weekly status updates in Microsoft Excel showing “before” and “after” conditions.
2. Updated one-line drawings where applicable.
3. Updated AutoCAD native drawing files (.DWG) and PDF versions.
4. Final compiled NETA MTS 2023 test reports, using:
o Official NETA MTS 2023 templates, or o GPO-approved test report formats.
5. Two-year certification labels applied to each breaker.
6. GOVERNMENT FURNISHED EQUIPMENT (GFE) / INFORMATION
• GPO will remove obstacles required to provide proper work clearance.
• GPO will provide 115V power for testing equipment.
7. PLACE OF PERFORMANCE
U.S. Government Publishing Office 732 North Capitol Street NW Building C, Room 127 Washington, DC 20401
8. PERIOD OF PERFORMANCE
Work must be completed within 14 weeks from award.
9. HOURS OF OPERATION
Monday–Friday, 7:00 AM – 3:00 PM (EST)
Exceptions may be permitted with prior GPO approval.
10. SECURITY REQUIREMENTS
10.1 Entry Requirements
• A valid federal or state ID is required for entry; expired IDs will not be accepted.
• Visitors must exchange ID for a GPO Visitor Badge.
• Visitor badges must remain visible at all times.
• Contractor personnel must be escorted or kept within line of sight unless they have an approved GPO Affiliate Badge.
• All personnel and all data processing must be U.S.–based; cloud or subcontracted work must reside within the United States.
10.2 Vehicle & Tool Inspections (Updated Requirement)
Per updated security directive:
• Vendor work vehicles, toolboxes, work bags, and equipment may be inspected daily, including upon exit each day.
• GPO Point of Contact:
Michael Crosby – Power Branch Supervisor Office: 2025121929, Work Cell: 202-803-1764
11. SPECIAL CONSIDERATIONS
• Contractor must hold NETA certification.
• All travel, lodging, meals, tools, equipment, and incidental costs are the responsibility of the vendor.
• Work must adhere to GPO safety guidelines and NFPA/OSHA requirements.
(End of SoW)