This is a Statement of Work (SOW) for Ordnance Assessment (OA) testing of Tomahawk Electric Initiators for the Naval Surface Warfare Center, Indian Head Division. The SOW requires comprehensive testing of 24 fleet-returned Tomahawk Electric Initiators (P/N 2220343-1) and 3 additional stockpile Tomahawk Standard Initiators (P/N 76Z2843-3) as test setup units. The testing will include non-destructive, environmental, and functional assessments across multiple stages: visual inspection, leak testing, electrical testing (dielectric withstanding voltage, insulation resistance), shock and vibration testing, and functional performance testing at temperatures ranging from -65°F to 160°F.

The contract is intended to be sole-sourced to Pacific Scientific Energetic Material Co. in Hollister, CA, under solicitation N00174-25-SIMACQ-E2-0036. The government will provide all test units as Government Furnished Material (GFM), and the contractor must deliver a comprehensive data pack within 15 working days after completing functional testing. Interested parties may identify their capabilities by May 28, 2025, at 10 AM EST, with the Navy seeking clear evidence that competition would be advantageous. The resulting contract will be a firm fixed-price agreement, with the NAICS code 541380 and FSC code H214.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW-2220343-FY25OA

STATEMENT OF WORK

FOR ORDNANCE ASSESSMENT TESTING OF

TOMAHAWK ELECTRIC INITIATOR (P/N 2220343-1)

1. INTRODUCTION

Scope. This statement of work (SOW) defines the efforts to conduct non-destructive, environmental, and functional (performance) testing of twenty-four (24) fleet-returned Tomahawk Electric Initiators (P/N 2220343-1, PacSci P/N 103377-432). Three (3) additional stockpile Tomahawk Standard Initiators (P/N 76Z2843-3, PacSci P/N 103377-32) will used as test setup units (TSU) during functional testing. The initiators will be provided as government furnished material (GFM) by Naval Surface Warfare Center, Indian Head Division (NSWC IHD).

Background. The last ordnance assessment testing was conducted at Pacific Scientific Energetic Materials Co. located in Chandler, AZ in June 2023 under contract N00174-22-P-0190. Data resulting from non-destructive, environmental, and functional testing of government furnished fleet returned units is used to evaluate ordnance safety, performance, and reliability of the aged in-service parts.

Government Furnished Material (GFM). The Government shall provide the following GFM to the contractor for use in performance of this contract:

Tomahawk Electric Initiator (P/N 2220343-1, PacSci P/N 103377-432)24 each
Tomahawk Standard Initiator (P/N 76Z2843-3, PacSci P/N 103377-32)3 each

0. The property will be delivered at the Government’s expense to the contractor’s facility.

0.0.1 Only the property listed above and on the GFP Attachment will be furnished by the Government. All other property required for performance of this contract shall be furnished by the contractor.

0.0.2 Within 30 days after GFM is determined by the contractor to be lost, damaged, destroyed, no longer usable, or no longer needed for the performance of the contract, the contractor shall notify the Contracting Officer, in writing, thereof.

0.0.3 Disposition instructions for the GFM are as follows: All units shall be destroyed by the contractor.

0.0.4 The contractor shall provide the GFM inventory within 30 days of completion of functional testing in accordance with Government Property Inventory Report for non-sustainment CDRL A001.

On-Site Visit and Coordination. The contractor shall notify NSWC IHD at least ten (10) working days prior to functional testing so government representative(s) can make travel arrangements to witness testing.

Test Failures. In the event of any failure, the contractor shall be limited to verifying the respective test setup and photographing test item and test setup. Contractor shall notify the Government representative before proceeding with testing.

APPLICABLE DOCUMENTS

Drawings:

PacSci Drawing 103377-432, Electric Initiator PacSci Drawing 103377-32, Electric Initiator Specifications.

Raytheon Specification Number 76Z2843, Specification for Electric Initiator Test Procedures:

PacSci Document Number ATP103377-12, -32, -122, -432, Acceptance Test Procedure (ATP) for 103377-12, 103377-32, 103377-122, and 103377-432 Initiator, Electrical

REQUIREMENTS

Test Procedure. The contractor shall provide the latest revision of ATP103377-12, -32, -122, -432 and the Shippable Work Order (SWO) to the Government. The Government shall review the SWO and provide approval at least 15 working days prior to start of test program in accordance with CDRL A002.

Test Program. Conduct testing in order shown in Table 1, and in accordance with SOW section 3.2 in its entirety. A data pack, including all inspection and test results, test data, traces, photographs (pre-test, test set ups, and post-test units), non-conformance reports, and equipment and calibration list, in the below subsections shall be delivered in accordance with CDRL A003.

Table 1. Test Matrix

P/N 103377-432

TEST REQUIREMENT
SOW SECTION
A
B
C
Total
Visual Inspection
3.2.1.1
10
7
7
24
Leak
3.2.1.2
10
7
7
24
Dielectric Withstanding Voltage
3.2.2.1
10
7
7
24
Insulation Resistance
3.2.2.2
10
7
7
24
Bridgewire Resistance
3.2.2.3
10
7
7
24
Thermal Transient Test
3.2.2.4
10
7
7
24
Radiographic Inspection (X-ray)
3.2.1.3
10
7
7
24
Shock
3.2.3.1
10
7
7
24
Vibration
3.2.3.2
10
7
7
24
TSHA
3.2.3.3
10
7
7
24
Leak
3.2.1.2
10
7
7
24
Dielectric Withstanding Voltage
3.2.2.1
10
7
7
24
Insulation Resistance
3.2.2.2
10
7
7
24
Bridgewire Resistance
3.2.2.3
10
7
7
24
Thermal Transient Test
3.2.2.4
10
7
7
24
No Fire Current
3.2.2.5
10
7
7
24

Functional (Performance) Test*

Ambient Temperature (70F)
3.2.4.1
10
Cold Temperature (-65F)
3.2.4.1
Hot Temperature (160F)
3.2.4.1
7
7

0.0.5 Non-destructive Testing. Non-destructive inspections and test results shall be recorded. Test and inspection results, photographs, and associated non-conformance reports shall be delivered.

Visual inspection shall be conducted on initiators for defects in workmanship, service-related damage, and conformance to applicable drawings and specifications. Photographs shall be taken of each pre-fire unit documenting the as received condition, to include, but not limit to, markings, condition of the output closure, condition of the interfacial seal and pins, and any damage or non-conformance. Inspection results shall be provided in the data pack.

Leak testing shall be conducted on all units in accordance Table I and ATP103377-12, -32, -122, -432. The interfacial seals may be removed to perform leak testing. Leak test results shall be recorded and provided in the data pack.

Radiographic inspection (x-ray) shall be conducted on all units in accordance with Table 1 and ATP103377-12, -32, -122, -432. If possible, all units shall be on one board for x-ray. Radiographic inspection report and digital x-ray images shall be provided in the data pack.

0.0.6 Electrical Testing. Electrical test results shall be recorded. Test results, FET data sheets, photographs of each test setup, and associated non-conformance reports shall be delivered.

Dielectric Withstanding Voltage (DWV) testing shall be conducted on units in accordance with Table 1 and ATP103377-12, -32, -122, -432, before and after environmental testing. If a unit does not meet DWV requirement, clean the pins and pin cavity per local instructions, reconduct the DWV test, and make note on the test data sheet. DWV test results and FET data sheet shall be provided in the data pack.

Insulation Resistance shall be conducted on units in accordance with Table I and ATP103377-12, -32, -122, -432, before and after environmental testing. Insulation resistance test results and FET data sheets shall be provided in the data pack.

Bridgewire resistance shall be conducted on units in accordance with Table I and ATP103377-12, -32, -122, -432, before and after environmental testing. Bridgewire resistance test results and FET data sheets shall be provided in the data pack.

Thermal Transient Testing (TTT) shall be conducted on units in accordance with Table 1 and PacSci local instructions (1 amp for 10 ms max, sample: 0.1 ms) to measure the electro-thermal characteristics of the internal bridge circuit and the explosive interface, before and after environmental testing. For reference only, the TTT dV readings shall be 85 to 220 mV. TTT test results and FET data sheets shall be provided in the data pack.

No-fire testing shall be conducted on units in accordance with Table 1 and ATP103377-12, -32, -122, -432, after environments and before functional testing. No-fire test results shall be provided in the data pack.

0.0.7 Environmental Testing. Environmental test results shall be recorded. Test results, photographs, fixture evaluations, and associated non-conformance reports shall be delivered.

Shock testing shall be conducted on units in accordance with Table 1 and ATP103377-12, -32, -122, -432. Shock exposure records, profiles and results, and test set up and post-tested unit photographs shall be provided in the data pack.

Vibration testing shall be conducted on units in accordance with Table 1 and ATP103377-12, -32, -122, -432. Vibration exposure records, profiles and results, and test set up and post-tested unit photographs shall be provided in the data pack.

Temperature Shock/Humidity/Altitude (TSHA) testing shall be conducted on units in accordance with Table I and ATP103377-12, -32, -122, -432. TSHA exposure records and results, temperature/humidity-time plots, and test set up and post-tested unit photographs shall be provided in the data pack.

0.0.8 Functional (Performance) Testing. Functional test results shall be recorded, and test results, data traces, test equipment and calibration list, conditioning chamber temperature profile, photographs and associated non-conformance reports shall be delivered.

Functional testing shall be conducted on units in accordance with Table I and ATP103377-12, -32, -122, -432, except temperature conditioning at -65F, 70F, and 160F. Temperature conditioning time for hot and cold conditions shall be a minimum of 4 hours and no greater than 24 hours.

Lot numbers and serial numbers of sample units will be determined by NSWC IHD prior to shipping the GFM, after which NSWC IHD will provide the sample matrix to the contractor defining the functional test conditioning temperature required for each unit by serial and lot number.

The Kistler gauges shall be re-greased after every tenth firing. Three (3) TSU initiators (P/N 76Z2843-3, PacSci P/N 103377-32) will be for conditioning the closed bomb and checking the test equipment after Kistler gauges are re-greased.

A photograph shall be taken of the ready-to-fire test setup with a unit installed.

Photographs shall be taken of the post-fired test setup and each post-fired unit, including photos of the pin cavity, output cavity, and side showing evidence of any hot gas leaks around the threads or o-ring.

Test data shall include maximum pressure and function time, and data traces shall record current and pressure vs. time. Test results, data traces, digital raw data (.csv files), conditioning chamber temperature profiles, photographs and associated non-conformance reports shall be provided in data pack.

DELIVERABLES

Government Property Inventory Report (CDRL A001).

First Submission – Contractor shall submit a report of GFM inventory within 30 days after completion of functional testing.

Test Procedure (Work Order). (CDRL A002) First Submission – Contractor shall submit a draft of the Shippable Work Order to the Government for review and approval at least 15 working days prior to start of test program. Submittal shall include the most current revision of the ATP103377-12, -32, -122, -432 that is referenced in the Shippable Work Order. The Government shall provide comments on the Work Order within 7 working days.

Subsequent Submission –Contractor shall submit the final revision within 7 working days after receipt of comments from the Government.

Technical Report–Study/Services (Data Pack). (CDRL A003) First Submission – Contractor shall submit the completed SWO and Test Data Pack including non-destructive inspection data sheets, radiographic inspection reports, digital x-ray images, electrical test data sheets (including FET data), environmental test data sheets, (including plots and profiles), functional test data sheets, current and pressure time traces and digital raw data (.csv files), conditioning chamber temperature profiles, photographs, non-conformance reports, and test equipment and calibration list to NSWC IHD within 15 working days after completion of functional testing.

Subsequent Submission – Contractor shall address comments and submit final test data within 7 working days.

Table 2. CDRL Submittals

CDRL

Number

Title
First Submission
Subsequent Submission
A001
Government Property Inventory Report (SOW sections 1.3.5 and 4.1)
Within 30 days after completion of functional testing
-

A002 Test Procedure (Work Order) - (SOW sections 3.1and 4.2)

Within 15 working days prior to start of test program
Within 7 working days after receipt of government comments

A003 Technical Report -Study/Services (Data Pack) – (SOW sections 3.2 (in its entirety) and 4.3)

Within 15 working days after completion of functional testing
Within 7 working days after the completion of functional testing

0.1 Points of Contact and Deliverable Addresses.

NSWC IHD

4393 Benson Rd, Suite 101 Indian Head, MD 20640-5092

Technical Representative:

Zachary Schiffman, Code E24ZS zachary.r.schiffman.civ@us.navy.mil 301-744-2134

WAWF Acceptor:

Chrissy Fish-DeAtley, Code E24CF christina.m.fishdeatley.civ@us.navy.mil 301-744-2313