This statement of work outlines requirements for a procurement of grab net barrier spare parts for Naval Base Coronado entry control points. The Navy seeks to purchase two 60-foot grab net barriers, 29 lower net encasements, 29 upper net encasements, and 116 temper wires from a contractor by 120 days after contract award. Products must meet dimensions specified in attachment sheets and be shipped to a Navy warehouse in San Diego, California between 0730 to 1530 hours Monday through Friday, excluding federal holidays and weekends. Invoicing can occur once shipment is received and accounted for. The purpose is to replace a barrier damaged in a vehicle impact and maintain force protection posture at the entry control points per Department of Defense instructions.

View the file

Other files

File Type Posted
BNSS Grab Net Barriers-ECP2.pdf PDF
Combined Synopsis N0024423Q0222.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVY REGION SOUTHWEST (NRSW)

N34 PROGRAM FOR FORCE PROTECTION (CT)

FY23 GRAB NET BARRIER SPARES-ECP2

STATEMENT OF WORK

1.0 OBJECTIVE

Procure additional sets of spare Grab Net Barriers for Naval Base Coronado (NBC) Inbound/Outbound Entry

Control Point (ECP) at the request of NRSW REGCOM.

2.0 BACKGROUND

NBC utilizes Grab Net barriers as an Active Vehicle Barrier for the Inbound, Outbound, and CVIS ECPs.

Grab Net barriers are custom fabricated; lead-time from purchase to procurement varies from 6-12 weeks depending on size of barrier ordered, material availability, and vendor workload. On 18 March 2023 a vehicle impacted the Grab Net barrier at the NBC inbound ECP. With no spare barrier, the ECP is without an active vehicle barrier for approximately 8 weeks. Based on this duration, NRSW REGCOM has directed purchase of additional ECP barriers

3.0 REFERENCE DOCUMENTS

a. Global Grab Price Quote

b. NBC Inbound ECP Grab Net barrier dimensions sheet

c. NBC Outbound ECP Grab Net barrier dimensions sheet

d. NBC CVIS ECP Grab Net barrier dimensions sheet

e. Per USFF OPORD 3300-22, DoDI 2000.16, UFC 4-010-0, installations are required to maintain a force protection posture to protect DoD assets IAW the installation Risk Assessment.

4.0 REQUIREMENTS

4.0.1 Contractor shall ensure all Installations Grab Nets meet the dimensions specified in the barrier dimension sheets.

4.0.2 Contractor shall include shipping & handling in bid price

4.0.3 Contractor shall shall ship NLT 120 days after receipt of order

4.1 SHIPPING:

Contractor shall ship all products listed in SEC 4.2 to the following address:

N3 WAREHOUSE

ATTN: GLEN ZAMORA

4635 PACIFIC HIGHWAY

BLDG 4 ROOM 4

SAN DIEGO CA 92132

4.2 PRODUCTS REQUIRED:

2 ea - K8 GRAB Net - 60’ PN: 300695.60.400

29 ea. - Lower Net Encasement PN: 500092

29 ea. Upper Net Encasement PN: 500096

116 ea. - Temper Wire PN: 001179

5.0 GOVERNMENT FURNISHED RESOURCES

Not required.

6.0 INVOICING

6.1 ONCE SHIPMENT HAS BEEN RECEIVED BY THE WAREHOUSE AND ALL COMPONENTS

ACCOUNTED FOR, CONTRACTOR MAY SUBMIT THE INVOICE INTO WAWF FOR PAYMENT.

7.0 PERIOD OF PERFORMANCE:

7.1 THIS IS A ONE-TIME PROCUREMENT.

7.2 DELIVERY SHOULD BE WITHIN 120 DAYS AFTER AWARD OF CONTRACT.

8.0 DELIVERABLES.

8.1 Deliverables identified in SEC 4.2 – Requirements

9.0 HOURS OF OPERATION.

9.1 Monday through Friday – 0730 to 1530

9.2 NO Federal Holidays, Weekends or extended daily hours for deliveries

10.0 POINT OF CONTACT (POC).

10.1 COR & Program POC: ELLEN THOMPSONBEATY 619-756-2045

ellen.d.thompsonbeaty.civ@us.navy.mil

10.2 Alternate Program POC: DAN HALL: 619-705-5331 daniel.c.hall26.civ@us.navy.mil

10.3 FINANCIAL POC: JACKI BYRNE: 619-705-5807

jacqueline.a.byrne.civ@us.navy.mil mailto:daniel.c.hall26.civ@us.navy.mil