SOW Forklifts.docx
DOCX document 27 KB Posted
- Attached to
- Forklift Rental For WOTC
- Solicitation number
- 52600PR
About this file
This document outlines the requirements for a scope of work for forklift services and maintenance. The contractor shall provide various material handling equipment at the specified durations, including one 5,000lb diesel forklift with side shifting capabilities for 12 months, one 5,000lb diesel forklift for 3-6 months, one 6,000lb diesel telehandler with a 34-36 foot lift for 3-6 months, and one 4,000lb electric walk behind forklift that can maneuver in 7 foot rack lanes for 12 months. The contractor will also be responsible for maintaining operational capability of all material handling equipment listed to ensure no equipment is down for more than one week at a time. The period of performance is a one year base period from DATE through September 30, 2024 with three additional one year option periods through September 30, 2027.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR_Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Surface Acquisition Logistics Center Cutter Transition Division
711 E. Ordnance Rd Baltimore, MD 21226 Phone: (571)-610-3728
Thru:
Scope of Work for Forklift Services and Maintenance For Cutter Transition Division
REQUIREMENTS
The contractor shall provide the following services:
1. Provide the various material handling at various durations listed below
a) One 5,000lb Diesel Forklift with ability to side shift, collapse and expand the width of the forks for 12 months.
b) One 5,000lb Diesel Forklift for 3-6 months.
c) One 6,000lb Diesel Telehandler with 34-36 ft lift for 3-6 months
d) One 4,00lb electric Walk Behind forklift for 12 months must be able to maneuver between 7’ rack lanes.
2. The Contractor shall be responsible for maintaining operational capability for all material handling equipment listed on the material handling equipment list at the US Coast Guard Waterfront Operations Training Center in Baltimore Maryland. The objective of this responsibility is to ensure that no equipment is down for no more than 1 (one) week at any given time.
Period of Performance:
The period of performance for this contract is a one-year base period with three one-year option periods as follows:
Base Period NEW DATE***, 2023 through September 30, 2024 Option Period One October 1, 2024 through September 30, 2025 Option Period Two October 1, 2025 through September 30, 2026 Option Period Three October 1, 2026 through September 30, 2027 image1.wmf oleObject1.bin
File details come from the government source that posted it. Updated .