SOW for water management contract Final 1.6.25.pdf

PDF 346 KB Posted

Attached to
SOURCES SOUGHT - WATER MANAGEMENT SERVICES FOR OKLAHOMA AREA IHS
Solicitation number
246-25-Q-0023
Issued by

About this file

This Statement of Work (SOW) outlines requirements for water management services for the Oklahoma City Area Office (OCAO) of Indian Health Services (IHS). The contractor must provide expert oversight of water management programs to ensure compliance with federal regulations, Joint Commission standards, CMS QSO 17-30, and AAMI Standard ST108 for medical device water processing. Key responsibilities include developing and implementing water management programs, conducting monthly and quarterly testing, providing oversight of water quality for Central Sterile Processing, and delivering reports to Facilities, Infection Prevention, and Safety departments.

The contract has a 12-month period of performance and requires the contractor to maintain secured communication methods through FedRamp-authorized systems. The contractor must provide a toll-free phone number for service calls during business hours (8:00 AM - 4:30 PM, Monday-Friday). While the government will provide facilities, equipment, and PPE, the contractor must furnish all personnel, materials, and supplies. The associated Sources Sought notice (246-25-Q-0023) indicates this opportunity will be awarded under Buy Indian Act authority, with responses due by January 31, 2025 at 12:30 PM CST to Contract Specialist Edson Yellowfish. Indian Small Business Economic Enterprises (ISBEEs) are particularly encouraged to respond.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Health and Human Services Indian Health Service

Statement of Work (SOW) Water Management Services

1. PURPOSE OF THE PROJECT

The Oklahoma City Area Office (OCAO), Indian Health Services (IHS) has a requirement to procure services to support and monitor water management to adhere water standards as set by federal regulations, the Joint Commission, CMS QSO 17-30, as well as the Association for the Advancement of Medical Instrumentation (AAMI) Standard ST108-Water for the Processing of Medical Devices.

2. DETAILED DESCRIPTION OF THE TECHNICAL REQUIREMENTS

The water management services will aid the facilities, Infection Prevention and Control (IPC) programs, and Environment of Care (EOC) programs to optimize water quality and safety for our patients, visitors, and staff. Developing, implementing, ongoing verification and validation of water management programs (WMP) for healthcare facilities to maximize efficiency and risk management.

The water management services will primarily be responsible for providing expert knowledge and oversight of the WMP. The water management services will provide oversight of the water quality for Central Sterile Processing. The water management services will help the Central Sterile Processing Departments within IHS, follow AAMI ST108.

The water management services will provide the following assistance to implement the following WMP:

1. Team—Identifying roles and responsibilities of each team member.

2. Risk Analysis/survey

3. Categories of water quality and selection (i.e., utility water, critical water, and/or steam)

4. Validation Plan

a. Water quality and operating parameters

b. Equipment

c. Process flow diagram

d. Monitoring and Corrective Action

e. Alert/Action levels/Control Measures

f. Program Support - Periodic review, training

3. PERIOD OF PERFORMANCE

The Period of Performance will be 12 months from start date.

4. LEVEL OF EFFORT

4.1. The contractor will perform monthly and quarterly testing. The reports will go to Facilities, Infection

Prevention, and Safety.

5. SPECIAL REQUIREMENTS

5.1. In accordance with HHSAR 304.1303, To ensure compliance with Homeland Security

Presidential Directive-12: Policy for a Common Identification Standard for Federal

Employees and Contractors (HSPD-12) It is the IHS policy that all staff and contractors who require physical access to federally controlled facilities and logical access to the IHS Information Technology (IT) networks and systems must obtain an HSPD-12-compliant access card. Individuals will be issued an access card upon meeting the HSPD-12 requirements and a favorable background investigation.

5.2. The OKC Area Office is a tobacco/smoke free environment (buildings and grounds). No tobacco/smoking use will be tolerated during service.

5.3. Security Requirements: Contractor personnel will be required to contact the government designated point of contact upon arrival when reporting for service calls or delivery supplies.

The contractor shall be responsible for the security of all organizational information.

Current rules and regulations applicable to the premises, where the work shall be performed shall apply to the contractor and its employees while working on the premises. These regulations include but are not limited to, escort by OKC Area Office official, presenting valid identification, smoking restriction and any safety procedures.

5.4. The contractor shall not disclose or cause to disseminate any information concerning operations of OKC Area Office. Such action(s) could result in violation of the contract.

5.5. All inquiries, comments, or complaints arising from any matter observed, experienced or learned of as a result of or in connection with the performance of the contract, the resolution of which may require the dissemination of official information, shall be directed to the Contracting Officer Representative (COR).

6. DELIVERABLES AND REPORTING REQUIREMENTS

6.1. Reports must be submitted via secured mail to the IHS or through a verified and approved

FedRamp not just hosted in a Fedramp authorized cloud. It should be listed as authorized on the FedRamp Marketplace.

6.2. Contractor Point of Contact: The contractor shall furnish one designated point of contact (POC) to the government’s designated representative for coordination of services. The POC will be empowered to make daily decisions to ensure that the contract implementation and day-to-day maintenance meets the terms and conditions of this contract.

6.3. Contractor’s Phone Numbers: The contractor shall provide a toll-free telephone number for service calls, which must be answered during at least eight working hours, between 8:00 am and 4:30 pm, Monday through Friday.

7. GOVERNMENT FURNISHED PROPERTY, FACILITIES AND SERVICES

The Government shall provide the facilities, equipment and PPE for the use by the contractor for the provision of the services required under this contract.

8. CONTRACTOR FURNISHED PROPERTY, FACILITIES AND SERVICES

Required personnel, materials, supplies and equipment: The contractor shall furnish all personnel, materials, supplies and equipment required to perform work under the contract.

9. CHANGES TO THE STATEMENT OF WORK (SOW)

Any changes to this SOW shall be authorized and approved only through written correspondence from the Contracting Officer. Costs incurred by the contractor through the actions of parties other than the Contracting Officer shall be borne by the contractor.

10. DELIVERABLES/PERFORMANCE MATRIX

10.1. Reports to Facilities, Infection Prevention, and Safety.

10.2. Program monitoring

10.3. Corrective Action Plan

Department Supervisor Signature:___________________1/6/25_____

Chief Operating Officer Signature:_________________________

Statement of Work (SOW)
2. DETAILED DESCRIPTION OF THE TECHNICAL REQUIREMENTS
3. PERIOD OF PERFORMANCE
4. LEVEL OF EFFORT
5. SPECIAL REQUIREMENTS
6. DELIVERABLES AND REPORTING REQUIREMENTS
7. GOVERNMENT FURNISHED PROPERTY, FACILITIES AND SERVICES
8. CONTRACTOR FURNISHED PROPERTY, FACILITIES AND SERVICES
9. CHANGES TO THE STATEMENT OF WORK (SOW)
10. DELIVERABLES/PERFORMANCE MATRIX

File details come from the government source that posted it. Updated .