SOW FOR SUPPLIES_office bathroom trailer.pdf
PDF 105 KB Posted
- Attached to
- Office / Bathroom Trailer Federal contract opportunity
- Solicitation number
- W50S7Z-23-Q-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo 23-Q-0004_office bathroom trailer.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR SUPPLIES
LOUISIANA AIR NATIONAL GUARD (LA ANG)
159MXG/CRF
DATE: 31 JAN 2023
TITLE: CONNEX OFFICE/BATHROOM PURCHASE
1. PURPOSE: Provide 159MXG/CRF with an office/bathroom Conex at the Hush House.
2. SCOPE OF WORK: The contractor shall provide all materials and support necessary to meet the required specifications to supply a conex (shipping container, cargo container, storage container) designed with an office and bathroom layout.
3. DELIVERY LOCATION AND DELIVERY DATE: The contractor shall deliver and install the conex behind the 159MXG/CRF, Building 565, located at 400 Russell Ave., NAS-JRB, New Orleans, Louisiana 70143 not later than Sept 15, 2023. The contractor shall visit installation location prior to delivery. Any issues that may hinder proper installation of conex shall be discussed with 159MXG representative.
4. QUANTITY REQUIRED: 1 EA
5. SPECIFICATIONS REQUIRED:
5.1. Dimensions of conex shall be approximately 20’ length x 8’ width x 8’6” height.
5.2. Conex layout shall consist of an office area (OA) and bathroom area (BA).
5.2.1. The office area (OA) shall be approximately 7’ L x 14’W x 8’ height.
5.2.2. The OA shall have 3 standard 4’ light fixtures, each with 2 – 4ft LED tubes, controlled with wall switches.
5.2.3. The OA shall have at least 6 (pre-wired) duplex 110V outlets and one data pass through.
5.2.4. The bathroom area (BA) shall be approx. 6’9”L x 4’W x 8’ height and be walled off from OA with access through an 2’ wide (min) interior personnel door.
5.2.5. The BA shall consist of a standard sized toilet, cabinet vanity sink and a mirror.
5.2.6. The BA shall have a ventilation fan installed with wall switch control and at least one duplex
GFCI 110V outlet.
5.2.7. The BA shall have at least one LED light fixture with wall switch controls.
5.2.8. The BA will have a 6.5kw (min) electric water heater and a water purification system with filter.
5.3. All exterior walls of conex shall be fully insulated with closed cell spray foam.
5.4. The interior side of walls shall consist of 1/4” painted wood paneling over wood 2”x4” wall framing.
5.5. All exterior sections of conex shall be primed and painted with exterior-grade paint in a standard light grey color.
5.6.The conex flooring shall have a grey anti-skid epoxy coating throughout the conex interior.
5.7. The conex shall be environmentally controlled with a mounted 2-Ton (or equivalent) Commercial HVAC Unit with Heat, supply and return grilles and digital programmable thermostat.
5.8. The conex shall have at least one LED external security light fixture near to entrance door.
5.10 The conex shall have two 3’x 3’ windows installed in OA.
5.11 The conex shall have a 125A capacity (minimum) electric breaker panel with an 50 amp (minimum) exterior disconnect..
6. INSTALLATION: Container shall be installed on slab currently located behind Building 565
(159MXG/CRF Hush House)
6.1. The contractor shall ensure all water and electrical supply services are connected IAW applicable state and federal guidelines.
6.2. The contractor shall ensure conex is properly restrained to meet/exceed hurricane winds.
END
File details come from the government source that posted it. Updated .