-SOW For New ChlorKing-.docx
DOCX document 505 KB Posted
- Attached to
- NextGen ChlorKing Chlorine Generator with Installation Federal contract opportunity
- Solicitation number
- FA480924Q0045
About this file
This document is a Statement of Work (SOW) for the removal of an old CHLORKING unit and installation of a new, updated CHLORKING 20R unit. The contractor shall provide all labor, tools, hardware, and equipment necessary to complete the requested work, including removing the old unit, installing the new unit, providing appropriate piping and tubing, and disposing of the old unit. The work will be performed at the F2MTRP 352 BA TS AF NO MILSBILLS PROC CP 2106710947 location in Pope Army Airfield, North Carolina. The contractor shall provide a one-year warranty on all workmanship. This SOW is related to a federal contract opportunity for a NextGen ChlorKing Chlorine Generator with Installation, solicitation number FA480924Q0045, issued by the Department of the Air Force Air Combat Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Brand Name Justification NEXGEN Chlorine Generator_Redacted.pdf | ||
| Solicitation - FA480924Q0045.pdf | ||
| WD 2015 - 4377 Rev No. 24 - Cumberland Hoke.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
1. PURPOSE: This statement of work defines the tasks required for the removal of the old CHLORKING unit and installation of a new, updated CHLORKING 20R
2. SCOPE: The contractor shall provide all labor, tools, hardware, and equipment necessary to complete the requested work. Upon notification to proceed, the contractor shall coordinate shipping, and installation timelines with authorized Government personnel.
a. Provide labor to remove old unit.
b. Install new unit.
c. Provide appropriate piping and tubing with proper connections to prevent leaks.
d. Dispose of old unit and all its peripheral parts
3. LOCATION OF INSTALLATION:
F2MTRP 352 BA TS
AF NO MILSBILLS PROC CP 2106710947, 1 MATERO DR POPE ARMY AIRFIELD, NC 28308-2727
UNITED STATES
4. MATERIALS: All materials will be furnished by the contractor. All relevant technical guidance in addition to manufactures instructions will be furnished from the contractor and any relevant Government instructions.
5. WARRANTY: The contractor shall provide a one-year warranty period on all workmanship. The warranty period shall start upon shipment and return of materials.
6. WORKMANSHIP: All workmanship will comply with standard trade practices. The contractor shall provide qualified personnel, equipment, and services required to complete requested work.
7. CURRENT CONFIGURATION:
image2.jpeg image3.jpeg image4.jpeg image1.jpeg
File details come from the government source that posted it. Updated .