SOW for Licenses.docx
DOCX document 31 KB Posted
- Attached to
- MASTERCAM LICENSES
- Solicitation number
- 70Z04025Q60623Y00
About this file
This Statement of Work (SOW) and associated solicitation outline requirements for MasterCAM software licenses for the US Coast Guard Yard in Baltimore, MD. The Coast Guard seeks to procure two MasterCAM mill licenses with 2D & 3D surfacing capabilities, two MasterCAM lathe licenses, and MasterCAM limited maintenance support, with a period of performance from January 2, 2025 to January 2, 2026.
The work will be performed at the Coast Guard Yard's Inside Machine Shop in Building 8A, with quotes due by February 14, 2025 at 12:00 PM Eastern. The solicitation will result in a Firm Fixed Price Purchase Order awarded on a Best Value basis. Key requirements include RAPIDGate program participation for facility access, 48-hour advance notice for material handling services, and contractor responsibility for all equipment and services except government-furnished utilities. Contractors must provide notice 24 hours before arrival, and work hours are 7:00 AM to 3:30 PM. The Coast Guard will not make advance payments, and payment terms are Net 30 through the IPP system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - Services.docx | DOCX document | |
| Smart Matrix _ Acquisition.GOV.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
1.0 SCOPE: The Contractor shall provide MAsterCAM licenses for stand alone computer . The contractor shall perform to the standards in this order, if no standards are specified, the Contractor shall meet industry standards.
Contractor shall provide dongle licenses for the following listed below.
2.0 REQUIREMENTS/TASKS: The following is to be completed by contractor on all listed below.
· Quantity of 2 MasterCAM mill licenses 2D & 3D surfacing
· Quantity of 2 MasterCAM lathe licenses
· MasterCAM limited maintenance
3.0 SITE VISIT: Contractors are responsible for verifying existing conditions, critical dimensions, and the scope of the work required to complete the project in full. Failure to visit the site does not relinquish the Contractor from this responsibility. Arrange site visits with Melvin Dash at melvin.dash@uscg.mil.
4.0 PERIOD OF PERFORMANCE: All work shall be started within 30 days from award date. Period of performance 02 January, 2025 to 02 January, 2026 in accordance with the intervals listed above. Work hours will be between 7:00 AM and 3:30PM. Notify contract 24 hours before arrival.
5.0 PLACE OF PERFORMANCE: The work to be performed under this contract will be performed at the U.S. Coast Guard Yard, Buildings 8A Inside Machine Shop, 2401 Hawkins Point Road, Building 78, Curtis Bay, Baltimore, MD 21226.
6.0 GOVERNMENT FURNISHED ITEMS AND SERVICES:
Services: The Contractor shall provide 48 hour notice to the Government when there is a need for material handling services.
Utilities: The Government will provide water, compressed air, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work.
Compressed Air: The Government shall provide a source of 110 PSI compressed air for Contractor machinery. The Contractor shall be responsible for ensuring that their compressed air hookup connections are compatible with the Yard’s compressed air sources.
Hazardous Materials and Waste: If it comes to the Contractors attention that the coating materials requiring removal are suspected hazardous material and would produce hazardous waste (Code of Maryland Regulations, Title 26, Subtitle 13 and 40 CFR 260-267), the Contractor must cease work immediately and notify the COR. If the surface coating being removed contains lead, cadmium, chromium or Polychlorinated Biphenyl or PCB’s, the Contractor will notify the COR immediately. The Contractor will have the responsibility to provide its full cooperation with the removal and disposal process.
7.0 CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:
General: The Contractor shall furnish all equipment and services required to perform work under this SOW, other than those explicitly addressed in government furnished services.
The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the time period and quantity specified.
The Contractor shall perform all services, management, planning, supervision, personnel, labor, materials, transportation and equipment necessary required by the task order to a commercially reasonable standard and in accordance with this SOW.
Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning equipment and tools to complete assigned work. The following tools and equipment are required:
a. Safety Equipment
Equipment Standards: Contractor’s trucks and equipment shall be maintained in an operable condition that meets all Federal, State of Maryland, and local safety requirements. All equipment must meet the permissible noise limits in accordance with this SOW.
9.0 OTHER APPLICABLE CONDITIONS
SECURITY: The Coast Guard Yard is a controlled access area. All contractors and subcontractors performing work on this contract shall utilize the RAPIDGate program. RAPIDGate manages the non-Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard Yard. All Contractor employees are required to identify themselves with company identification on their hard hats and/or uniforms. Any Contractor employee not following Coast Guard rules and regulations will be removed from performance on this contract and may be barred from reentering the Coast Guard Yard.
Contractor employees shall not enter restricted areas in accordance with CG Yard security regulations and policies. Before Contractor employees can work at the CG Yard, the Contractor shall complete a security investigation on all Contractor employees in connection to this contract. Any Contractor employees with a criminal background must get prior authorization before they can gain access to the CG Yard. All personnel for the Contractor shall be supplied to the government prior to arrival conference for proper access to the Coast Guard Yard.
All personnel shall receive a visitor pass and clearance form from the CG Yard Security located at the Main Gate. A list of personnel needing access shall be provided to the Project POC at least twenty-four (24) hours prior to requiring access. Personnel will be required to provide full name, picture I.D. (valid driver’s license preferred), and date of birth. Non- US citizens will not be granted access to the work location under this contract. The following forms of identification are authorized:
| - CAC | - Foreign passport containing appropriate visas |
| - TWIC | - Green Cards |
| - Passport | - MOST state IDs |
The following state IDs will not be accepted:
- Maine - Missouri* - Minnesota - Washington* - Montana
* Enhanced Driver’s License (EDLs) will be accepted
The contractor may be required to work outside of the normal working hours and possibly on weekends due to Yard work activities. Advance notice will be given to the Contractor as much as practical.
TRAVEL: The Contractor is responsible for any travel in the performance of this work.
PROTECTION OF INFORMATION: The CG Yard will not submit or provide any outside authorities of any personal information pertaining to the workforce of the Contractor. A list with all approved workers will be submitted to the Contracting Officer (KO), COR, the POC for this contract, and the security gate office.
DELIVERABLES:
All deliverables for the Contractor, if needed during the construction process, will be addressed to the following address:
POC: Melvin Dash, Building 58 2401 Hawkins Point Rd.
Baltimore, MD 21226
File details come from the government source that posted it. Updated .