SOW For Installation of a 15x48 Pad.doc

DOC document 139 KB Posted

Attached to
INSTALLATION OF A CONCRETE PAD AT FSP BLDG. 163J
Solicitation number
12305B22Q0152
Issued by

View the file

Other files

File Type Posted
12305B22Q0152 A002.pdf PDF
A002 Responses to Questions.docx DOCX document
12305B22Q0152 A1.pdf PDF
sConcrete Pad.doc DOC document
md44.txt TXT text file
12305B22Q0152.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF AGRICULTURE

BELTSVILLE AGRICULTURAL RESEARCH CENTER

FACILITIES SERVICE

ENGINEERING AND CONSTRUCTION BRANCH

BUILDING 426A, BARC-EAST

10300 BALTIMORE AVENUE

BELTSVILLE, MARYLAND 20705-2350

STATEMENT OF WORK AND SPECIFICATION

TO

INSTALLATION OF A 15’-0” X 48’-0” X 4” INCH STEEL REINFORCED CONCRETE PAD AT FSP BLDG. 163J

BELTSVILLE AGRICULTURAL RESEARCH CENTER

BELTSVILLE, MARYLAND

July 13, 2022

STATEMENT OF WORK

PROJECT NUMBER: FSP 163J Addition PROJECT LOCATION: Beltsville Agricultural Research Center (BARC), FSP Bldg. 163J, Beltsville, Maryland 20705 DESCRIPTION OF WORK: To provide all labor, materials, supplies, specialized equipment/tools, transportation, and supervision to fabricate, supply and install a 15’ x 48’ x 4” inch Steel Reinforced Concrete Pad at 163J Bldg. A construction project schedule shall be provided by the contractor prior to work start up.

HazMat: In accordance with this contract, the contractor shall provide all labor, material, equipment, and transportation to include all accessories and incidentals necessary to complete this job to government requirements. The facility under this contract may contain Asbestos and Lead materials. The contractor(s) is/are warned not to disturb any asbestos or Lead materials during the performance of this work. Should the contractor encounter any material that in their judgment may contain Asbestos or Lead, they must stop work immediately and notify the contracting officer (CO) and (COR) within 24 hours. See the Hazmat Testing Results for Asbestos and Lead.

Prior to commencing work, the contractor is required to obtain Construction Authorization, vehicle permits, and identification badges. These can be obtained from the Engineering and Construction Office, Building 426A, BARC-East, Beltsville, Maryland. Vehicle permits and identification badges shall be returned to the Government prior to the final payment being issued.

NOTE: THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT TECHNICAL REPRESENTATIVE ON 301-504-8434 at least 24 HOURS BEFORE ANY WORK IS SCHEDULED TO START. All contractor's work shall be monitored and inspected by BARC personnel and done in accordance with the Statement of Work and attached drawings, specifications, graphics, BARC Special Conditions, and performed in accordance with all federal, state, and local regulations as well as all applicable local building codes, Construction Standards and Codes, Americans with Disabilities Act, local and State traffic codes, Maryland Department of the Environment, the Maryland Highway Specifications, and the Maryland Department of the Environment Regulations concerning Clean Water Act. In the event of conflict, the most stringent regulation shall prevail.

Scope of Work:

The contractor shall provide all labor, materials, supplies, specialized equipment/tools, transportation, and supervision to fabricate, supply and install a 15’ x 48’ x 4” inch Steel Reinforced Concrete Pad at 163J Bldg. A construction project schedule shall be provided by the contractor prior to work start up.

The following work shall be performed:

A. Mobilization

· Mobilize all necessary personnel, specialized tools and equipment, shoring, soil stabilization approved materials, dumpsters, safety items, etc., to commence work after point of award of the contract and approval of submittals from the COR.

· Dumpster locations shall be coordinated with the COR as well as the final approval of that location.

· Contractor shall submit a construction schedule to the COR. Contractor shall coordinate with Using Activity through the COR for the construction schedule 10 business days after issuance of the Notice to Proceed and prior to beginning construction.

· Hours of service shall be Monday – Friday between 7:30 a.m. – 4:00 p.m. Contractor shall not work on government holidays or weekends. Any work performed other than normal working hours shall be approved by the CO in advance.

· Contractor shall request, through the COR, an outage to any utility a minimum of 2 days in advance. See general requirements and government special conditions.

B. Site Demolition

· The contractor shall protect areas that are not to be disturbed or not within the area of work from dust, debris, and possible damage.

· In accordance with this contract, the contractor shall provide all labor, material, equipment, and transportation to include all accessories and incidentals necessary to complete this job to government requirements. The facility under this contract may contain Asbestos and Lead materials. The contractor(s) is/are warned not to disturb any asbestos or Lead materials during the performance of this work. Should the contractor encounter any material that in their judgment may contain Asbestos or Lead, they must stop work immediately and notify the contracting officer (CO) and (COR) within 24 hours.

· Within a 15’ x 48’ area of the Bldg. 163J East end the Contractor shall remove all the existing gravel stones and stockpile them on site. The stockpile shall be near the bldg. but out of the construction site area. The COR will have to approve the gravel stockpile area.

· Special attention shall be considered when removing the existing grave and excavation around the existing so as not to undermine the structural integrity of the structural building system.

· Contractor shall protect the existing Bldg. 163J East end from damage caused by the construction activities such as demolition, earth work, excavation and concrete installation. Any such damage shall be the responsibility of the contractor to repair or replace at no cost to the Government.

· The contractor shall remove and dispose of Government property, all items indicated as to be removed. Such items become the property of the contractor and shall be loaded, transported per applicable DOT regulations, and disposed of at approved landfills.

· The contractor shall control the dirt from entering the adjacent building workspaces, storm water inlets, drain. The contractor shall remove and discard all debris off site at an approved land fill. The contractor shall not at any time use the USDA, ARS, BARC Waste Disposal System such as trash can nor dumpsters to discard project debris.

C. Installation of a 15’ x 48’ x 4” inch Steel Reinforced Concrete Pad at 163J Bldg. A construction project schedule shall be provided by the contractor prior to work start up.

· Within a 15’ x 48’ area of the Bldg. 163J East end the Contractor shall remove all the existing Gravel and stockpile it on site. The stockpile shall be near the Bldg. but out of the construction site area. The COR will have to approve the Topsoil stockpile area.

· The contractor shall excavate existing dirt approximately 15’ x 48’x 4” area and stockpile it on site. The stockpile shall be near the Bldg. but out of the construction site area. The COR will have to approve the Topsoil stockpile area.

· The contractor shall compact the existing soil to 95% compaction. Then install 4 Mil. Vapor Barrier, 4” of CR6 stone, 3,500 psi 4” thick Concrete Pad with steel reinforcing as shown on Drawing #1.The concrete pad shall be 15’-0” Wide x 48’-0” Long and 8” Thick. It shall have 3” from the bottom of the concrete pad a continues layer of Welded Wire Fabric 6x6 W2.9/W2.9 within 3” of all edges of the concrete pad along with on top of the welded Wire Fabric crossing one directions of the #4 Rebar tied together horizontally and perpendicular to each other as shown in Drawing #1. The concrete mix design is listed below with specifications.

The Low-Shrinkage, Crack-Free Mix (per cubic yard)

Cement - 530 lbs.
Macro Synthetic Fiber: Tuf-Strand SF - 4 lbs
Sand - 1,240 lbs
Air Content - 2.5%
Coarse Aggregate #67 - 1,750 lbs
water-cement ratio - 0.49
Coarse Aggregate #8 - 450 lbs
Slump - 7 inches
Water - 261 lbs
Shrinkage @ 28 days - 0.032%

High Range Water Reducer: Eucon 37 - 74 oz

· Heavy Duty Concrete Pad

· Construct a heavy duty reinforced concrete pad.

· Construct heavy duty floor by placing a heavy-duty bonded topping on a base slab which has had a rough slab finish left 50 mm 2 inches below final grade. Concrete in the base slab must be thoroughly hardened but not more than 30 hours old. The temperature of the fresh concrete topping must not vary more than 5 degrees C 10 degrees F plus or minus from the temperature of the base slab. The ambient temperature of the space adjacent to the concrete placement and of the base slab must be between 10 and 30 degrees C

50- and 90-degrees F.

· The contractor shall provide the following:

· Preparation Slab

· Keep the base slab continuously damp until topping is placed. Thoroughly clean the surface of the base slab with an air-water jet immediately before placing the topping. Thoroughly scrub a thin coat of neat cement grout of about the consistency of thick cream into the existing surface immediately ahead of the overlay placing. At the time the neat cement grout is placed, the existing concrete surface must be damp but no free water present.

Deposit the overlay concrete before the grout coat has had time to stiffen.

· CONCRETE PAD HARDENER

· Treat the concrete pad with a hardener applied after the concrete has been cured and then air dried for 14 days. Apply three coats, each the day after the preceding coat was applied. For the first application, dissolve 0.5 kg one pound of the silicofluoride in 4 liters one gallon of water. For subsequent applications, the solution must be 1.0 kg two pounds of silicofluoride to each 4 liters gallon of water. Mop the floor with clear water shortly after the preceding application has dried to remove encrusted salts. Apply proprietary hardeners in accordance with the manufacturer's instructions. Ventilate the area during application. Take precautions when applying silicofluoride due to the toxicity of the salts. Immediately remove any compound that contacts glass or aluminum with clear water.

· EXTERIOR SLAB AND RELATED ITEMS TESTING AND INSPECTION FOR CQC

· Perform the inspection and tests described below and, based upon the results of these inspections and tests, take the action required. Submit certified copies of laboratory test reports, including mill tests and all other test data, for Portland cement, blended cement, pozzolan, ground granulated blast furnace slag, silica fume, aggregate, admixtures, and curing compound proposed for use on this project.

· When, in the opinion of the Contracting Officer, the concreting operation is out of control, cease concrete placement and correct the operation.

· The laboratory performing the tests must be onsite and conform with

ASTM C1077. Materials may be subjected to check testing by the

Government from samples obtained at the manufacturer, at transfer points, or at the project site.

· The Government will inspect the laboratory, equipment, and test procedures prior to start of concreting operations and at least once for conformance with ASTM C1077.

· Grading and Corrective Action

· Fine Aggregate

· At least once during each shift when the concrete plant is operating, there must be one sieve analysis and fineness modulus determination in accordance with ASTM C136/C136M and COE CRD-C 104 for the fine aggregate or for each fine aggregate if it is batched in more than one size or classification.

Select the location at which samples are taken as the most advantageous for control. However, the Contractor is responsible for delivering fine aggregate to the mixer within specification limits. When the amount passing on any sieve is outside the specification limits, immediately resample and retest the fine aggregate. If there is another failure on any sieve, immediately report the failure to the Contracting Officer/COR, stop concreting, and take immediate steps to correct the grading.

· Coarse Aggregate

· At least once during each shift in which the concrete plant is operating, there must be a sieve analysis in accordance with ASTM C136/C136M for each size of coarse aggregate. Select the location at which samples are taken as the most advantageous for control. However, the Contractor is responsible for delivering the aggregate to the mixer within specification limits. A test record of samples of aggregate taken at the same locations must show the results of the current test as well as the average results of the five most recent tests including the current test. Limits may be adopted for control coarser than the specification limits for samples taken other than as delivered to the mixer to allow for degradation during handling. When the amount passing any sieve is outside the specification limits, immediately resample and retest the coarse aggregate. If the second sample fails on any sieve, report that failure to the Contracting

Officer. Where two consecutive averages of 5 tests are outside specification limits, the operation is be considered out of control and must be reported to the Contracting Officer. Stop concreting and take immediate steps to correct the grading.

Quality of Aggregates

Thirty days prior to the start of concrete placement, perform all tests for aggregate quality required by ASTM C33/C33M. In addition, after the start of concrete placement, perform tests for aggregate quality at least every three months, and when the source of aggregate or aggregate quality changes. Take samples for testing after the start of concrete placement immediately prior to entering the concrete mixer.

· Scales, Batching and Recording

· Check the accuracy of the scales by test weights prior to start of concrete operations and at least once every three months. Also conduct such tests as directed whenever there are variations in properties of the fresh concrete that could result from batching errors. Once a week check the accuracy of each batching and recording device during a weighing operation by noting and recording the required weight, recorded weight, and the actual weight batched. At the same time, test and ensure that the devices for dispensing admixtures are operating properly and accurately. When either the weighing accuracy or batching accuracy does not comply with specification requirements, do not operate the plant until necessary adjustments or repairs have been made. Immediately correct discrepancies in recording accuracies.

· Batch-Plant Control

Continuously control the measurement of concrete materials, including cementitious materials, each size of aggregate, water, and admixtures.

Adjust the aggregate weights and amount of added water as necessary to compensate for free moisture in the aggregates. Adjust the amount of air-entraining agent to control air content within specified limits.

Prepare a report indicating type and source of cement used, type and source of pozzolan or slag used, amount and source of admixtures used, aggregate source, the required aggregate and water weights per cubic meter yard amount of water as free moisture in each size of aggregate, and the batch aggregate and water weights per cubic meter yard for each class of concrete batched during each day's plant operation.

· Concrete Mixture

· Air Content Testing

Perform air content tests when test specimens are fabricated. In addition, make at least two tests for air content on randomly selected batches of each separate concrete mixture produced during each 8-hour period of concrete production. Perform additional tests when excessive variation in workability is reported by the placing foreman or Government inspector.

Conduct tests in accordance with ASTM C231/C231M for normal weight concrete and ASTM C173/C173M for lightweight concrete. [Plot test results on control charts. Submit the control charts weekly and make them readily available to the Government. Keep copies of the current control charts in the field by testing crews and results plotted as tests are made. When a single test result reaches either the upper or lower action limit, perform a second test immediately. Average the results of the two tests and use this average as the air content of the batch to plot on both the air content and the control chart for range, and for determining need for any remedial action. Plot the result of each test, or average as noted in the previous sentence, on a separate control chart for each mixture on which an

"Average line" is set at the midpoint of the specified air content range from paragraph AIR ENTRAINMENT. Set an upper warning limit and a lower warning limit line 1.0 percentage point above and below the average line, respectively. Set an upper action limit and a lower action limit line 1.5 percentage points above and below the average line, respectively. Plot the range between each two consecutive tests on a secondary control chart for range where an upper warning limit is set at 2.0 percentage points and an upper action limit is set at 3.0 percentage points. Samples for air content may be taken at the mixer, however, the Contractor is responsible for delivering the concrete to the placement site at the stipulated air content. If the materials or transportation methods cause air content loss between the mixer and the placement, take correlation samples at the placement site as required by the Contracting Officer/COR, and the control the air content at the mixer as directed.

· Air Content Corrective Action

Whenever points on the control chart for percent air reach either warning limit, immediately make an adjustment in the amount of air-entraining admixture batched. As soon as practical after each adjustment, make another test to verify the result of the adjustment. Whenever a point on the secondary control chart for range reaches the warning limit, recalibrate the admixture dispenser to ensure that it is operating accurately and with good reproducibility. Whenever a point on either control chart reaches an action limit line, the air content is considered out of control and the concreting operation immediately halted until the air content is under control. Make additional air content tests when concreting is restarted.

· Slump Testing

In addition to slump tests which are made when test specimens are fabricated during concrete placement/discharge, make at least four slumps tests on randomly selected batches in accordance with ASTM C143/C143M for each separate concrete mixture produced during each 8-hour or less period of concrete production each day. Also, make additional tests when excessive variation in workability is reported by the placing foreman or

Government inspector. [Plot test results on control charts. Submit the control charts and make them readily available to the Government. Keep copies of the current control charts in the field by testing crews and results plotted as tests are made. When a single slump test reaches or goes beyond either the upper or lower action limit, immediately perform a second test. Average the results of the two tests and use this average as the slump of the batch to plot on both the control charts for slump and the chart for range, and for determining need for any remedial action. Set limits on separate control charts for slump for each type of mixture. Set the upper warning limit at 12.5 mm 1/2 inch below the maximum allowable slump specified in paragraph SLUMP in PART 1 for each type of concrete and, set an upper action limit line and lower action limit line at the maximum and minimum allowable slumps, respectively, as specified in the same paragraph. Plot the range between each consecutive slump test for each type of mixture on a single control chart for range on which an upper action limit is set at 50 mm 2 inches. Take samples for slump at the mixer. However, the Contractor is responsible for delivering the concrete to the placement site at the stipulated slump. If the materials or transportation methods cause slump loss between the mixer and the placement, take correlation samples at the placement site as required by the Contracting Officer, and the slump at the mixer controlled as directed.

· Slump Corrective Action

Whenever points on the control charts for slump reach the upper warning limit, make an adjustment immediately in the batch weights of water and fine aggregate. The adjustments are to be made so that the total water content does not exceed that amount allowed by the maximum w/c ratio specified, based on aggregates which are in a saturated surface dry condition. When a single slump reaches the upper or lower action limit, deliver no further concrete to the placing site until proper adjustments have been made. Immediately after each adjustment, make another test to verify the correctness of the adjustment. Whenever two consecutives individual slump tests, made during a period when there was no adjustment of batch weights, produce a point on the control chart for range at or above the upper action limit, halt the concreting operation immediately, and take appropriate steps to bring the slump under control. Make additional slump tests as directed.

· Temperature

Measure the temperature of the concrete when compressive strength specimens are fabricated in accordance with ASTM C1064/C1064M. Report the temperature along with the compressive strength data.

Strength Specimens

Perform on at least one set of test specimens, for compressive strength as appropriate, on each different concrete mixture placed during the day for each 380 cubic meters 500 cubic yards or portion thereof of that concrete mixture placed each day. Perform on additional sets of test specimens, as directed by the Contracting Officer, when the mixture proportions are changed or when low strengths have been detected. Develop a truly random

(Not haphazard) sampling plan for approval by the Contracting Officer prior to the start of construction. Show in the plan that sampling is done in a completely random and unbiased manner.

· A set of test specimens for concrete with a 28-day specified strength in accordance with paragraph STRENGTH REQUIREMENTS in PART 2 consists of five specimens, two to be tested at 7 days, two at 28 days, and one cylinder held in reserve.[ A set of test specimens for concrete with a

[56-day] [90-day] strength in accordance with the same paragraph consists of eight specimens, two tested at 7 days, two at 28 days, two at [56] [90] days, and two held in reserve.]

· A strength test is the average of the strengths of at least two 150 mm by 300 mm 6 inch by 12-inch cylinders or at least three 100 mm by 200 mm

4 inches by 8-inch cylinders made for the same sample of concrete.

· Mold and cure test specimens in accordance with ASTM C31/C31M, and test in accordance with ASTM C39/C39M for test cylinders. Immediately report results of all strength tests to the Contracting Officer.

· Maintain quality control charts for individual strength "tests", ("test" as defined in paragraph STRENGTH REQUIREMENTS) moving average of last 3 "tests" for strength, and moving average for range for the last 3 "tests" for each mixture. Provide charts similar to those found in ACI 214R.

· Inspection Before Placing

Inspect foundations, construction joints, forms, and embedded items in sufficient time prior to each concrete placement in order to certify too the

Contracting Officer/COR that they are ready to receive concrete. Report the results of each inspection in writing.

· Placing

The placing foreman must supervise placing operations, determine that the correct quality of concrete or grout is placed in each location as specified and as directed by the Contracting Officer/COR, and be responsible for measuring and recording concrete temperatures and ambient temperatures hourly during placing operations, weather conditions, time of placement, volume placed, and method of placement. The placing foreman must not permit batching and placing to begin until it has been verified that an adequate number of vibrators in working order and with competent operators are available. Do not continue placing if any pile of concrete is inadequately consolidated. If any batch of concrete fails to meet the temperature requirements, take immediate steps to improve temperature controls.

· Cold-Weather Protection

At least once each shift and once per day on non-workdays, inspect all areas subject to cold-weather protection. Note any deficiencies, correct, and report.

· Mixer Uniformity

Stationary Mixers

Prior to the start of concrete placing and once every 6 months when concrete is being placed, or once for every 60,000 cubic meters 75,000 cubic yards of concrete placed whichever results in the shortest time interval, determine uniformity of concrete mixing in accordance with

ASTM C94/C94M.

· Truck Mixers

Prior to the start of concrete placing and at least once every 6 months when concrete is being placed, determine uniformity of concrete mixing in accordance with ASTM C94/C94M. Select the truck mixers randomly for testing. When satisfactory performance is found in one truck mixer, the performance of mixers of substantially the same design and condition of the blades may be regarded as satisfactory.

· Mixer Uniformity Corrective Action

When a mixer fails to meet mixer uniformity requirements, either increase the mixing time, change the batching sequence, reduce the batch size, or adjust the mixer until compliance is achieved.

· Reports

Report all results of tests or inspections conducted, informally as they are completed and in writing daily. Prepare a weekly report for the updating of control charts covering the entire period from the start of the construction season through the current week. During periods of cold-weather protection, prepare daily reports of pertinent temperatures.

These requirements do not relieve the Contractor of the obligation to report certain failures immediately as required in preceding paragraphs.

Confirm such reports of failures and the action taken in writing in the routine reports. The Contracting Officer has the right to examine all contractor quality control records.

· REPAIR, REHABILITATION AND REMOVAL

Before the Government accepts the structure and final payment is made, inspect the structure for cracks, damage and substandard concrete placements that may adversely affect the service life of the structure.

Submit a report documenting these defects, which includes recommendations for repair, removal and/or remediation to the Contracting Officer for approval before any corrective work is accomplished.

· Crack Repair

Prior to final acceptance, document and repair all cracks in excess of 0.50 mm 0.02 inches wide. Submit the proposed method and materials to repair the cracks to the Contracting Officer for approval. Address the amount of movement expected in the crack due to temperature changes and loading.

· Repair of Weak Surfaces

Weak surfaces are defined as mortar-rich, rain-damaged, uncured, or containing exposed voids or deleterious materials. Diamond grind concrete surfaces with weak surfaces less than 6 mm 1/4 inch thick to remove the weak surface. Remove and replace surfaces containing weak surfaces greater than 6 mm 1/4 inch thick, or mitigate in a manner acceptable to the

Contracting Officer.

· Failure of Quality Assurance Test Results

Do not proceed with proposed mitigation efforts to restore the service life until approved by the Contracting Officer.

· CLEAN-UP & FINAL PUNCH LIST: The contractor shall clean the site of any loose debris and schedule a final walk thru with Contracting Officer technical representative (COR) and Contracting Officer (CO). Upon completion of all punch list items, the parking passes and badges remitted to the (COR). The Contractor and the COR will instruct the CO that the contract has been to the completed in its entirety.

· The contractor shall provide at least a one-year warranty on the Work/Labor. The contractor shall indicate the years of the warranty upon submission of proposal.

· The contractor shall field verify all field conditions, measurements, quantities, and safety constraints prior to bidding and forward any discrepancies or concerns to the Contract Office Representative (COR). Otherwise, it’s our intent that all is inclusive of everything regardless of quantity, measurement or level of protection required to accomplish scope of work.

General:

A. Demolition: The contractor shall remove and dispose of Government property, all items indicated as TO BE REMOVED. Such items become the property of the contractor and shall be loaded, transported per applicable DOT regulations, and disposed at approved landfills.

B. Field Verification: The contractor is responsible for field verification of all measurements, quantities, and field conditions prior to commencing work.

C. Staging: All equipment, supplies and materials for this contract shall be stored in the work area at the contractor’s risk. The buildings and grounds at BARC will be secured at the end of each day by BARC Security. The security at BARC is not responsible for any of the contractor's stored material, equipment, either inside or outside the building at any time.

D. Construction Project Schedule: See contract, FAR 52.236-15 Schedules for Construction Contracts. The Contractor will not begin actual work until the construction project schedule has been approved by the Contracting Officer. The Contractor shall submit one electronic copy of the updated construction project schedule with each progress payment request.

E. Contract Inspector’s Daily Report: Contractor shall submit to the Contracting Officer a daily report listing the names of all those present on the job site each day, along with their Job Classification, hours of work and a brief description of the work performed by each on that day. The Contract Inspector’s Daily Report is to be submitted at the beginning of work each day for the previous day’s work and shall be maintained throughout the term of the contract.

F. Formal Meetings: Any meeting (deemed formal by the contractor, the COR, or the Contracting Officer) will have the minutes of said meeting prepared by the contractor (and a copy provided to the Contracting Officer). The minutes will include: Date, Name of Attendees (with contact info), Old Business, and New Business subjects (or narratives). Regardless of who requests a meeting (the COR or the Contractor or the Contracting Officer) the contractor may be required to provided hard copy pictures of the issues to be discussed. Each issue will be linked to a contract specification section number and/or subject area by page number. Issues discussed will also include an action/completion date.

G. Safety Submittals: Contractor shall submit a "site specific" Safety Plan to the Contracting Officer that describes how the contractor is to comply with all applicable OSHA standards and NFPA codes pertaining to construction work to include, but not limited to: General Safety and Health Provisions, Occupational Health and Environmental Controls, Personal Protective and Life Saving Equipment, Hand and Power Tools, Welding and Cutting, Electrical, Scaffolds, Fall Protection, Excavations, Demolition, Stairways and Ladders, Toxic and Hazardous Substances, Confined Space Entry, Lockout/Tagout, Respiratory Protection, Hearing Protection. Safety Plan shall identify Contractor and sub-contractor employees who are authorized/qualified to perform electrical work. No work shall proceed until written approval of the Safety Plan by the Contracting Officer. Safety Plan shall describe how the Contractor and/or sub-contractors are to secure equipment, supplies, tools, and chemical products. Contractor and/or sub-contractor equipment, supplies, tools, and chemical products are to be under the control of the Contractor at all times, equipment, supplies tools, and chemical products found not to be under the control of the Contractor or sub-contractor are subject to confiscation and will be reported to the Contracting Officer. Note see the enclosed sample of a Site-Specific Safety Plan.

H. The Contractor shall inspect the entire construction site daily, including days without construction work if there are NFPA 101 Life Safety Code deficiencies existing while construction work is shut down, the results of that inspection shall be documented on the attachment “DAILY INSPECTION FORM”, and the form is to be signed and submitted to the Contracting Officer.

I. Contractor shall provide continuous monitoring for noise, dust, chemical vapor generation, volatile organic compounds, and vibration. At no time shall noise exposure to any ARS staff exceed 75 dB. Contractor shall provide to the Contracting Officer a written weekly update of the all test results and also for proposed work for the subsequent two weeks (a two week “look-ahead”)involving any construction activity that will produce loud noises, heavy vibrations, strong smells, or significant dust inside ARS staff occupied space.

J. Contractor and sub-contractors shall notify in writing the Contracting Officer at least one week prior to executing high risk work (this may be included in the two week “look-ahead” update). High risk work includes, but is not limited to, tasks requiring Lockout/Tag Out, live electrical work, hot work, work at heights, trenching/ shoring, crane operations, and confined space entry. Contractor’s Competent Person shall provide the Contracting Officer written weekly documented safety inspection results.

K. Contractor shall provide to the Contracting Officer for approval, copies of Safety Data Sheets (SDS) for EVERY CHEMICAL WITHOUT EXCEPTION prior to bringing such chemical on the work site.

L. Hot and Grinding Work Permits: The Contractor will not be permitted to work without this permit when performing Hot and Grinding Work.

M. Scheduling: The total contract period shall be 60 calendar days from the point of contract award. A period of 5 calendar days shall be allotted for the submittal, 5 calendar days for review and re-submit process. A period of 10 days shall be allotted for ordering materials. The work on-site shall be limited to one sixty (60) calendar days. The final inspection shall be scheduled a maximum of 43 calendar days from point of contract award, leaving 2 days for punch list remedies. The contractor shall submit a copy of his proposed schedule to the CO for approval. Please note that the shipping timeline is 10 delivery time after approved submittals. The actual construction work period shall be 45 calendar days.

N. Submittals: The contractor shall submit the manufacturer’s technical data sheets and shop drawings for the items listed in the Submittal Registry 5 calendar days from the point of contract award. Each submittal shall be attached to a Submittal Transmittal Form (enclosed), signed by the Contractor, and delivered to the Contracting Officer. Provide 6 copies of each material submittal.

O. Coordination: The contractor shall coordinate with the COR, with adequate notice, all work which will require an inconvenience or work stoppage to Government personnel due to noise, dust, extreme temperatures, or interruption in utilities.

P. Complete Work: It is the intent of this project to contract for a complete, functioning mechanical and or electrical system, finished in all respects, accomplished by mechanics skilled in the trades involved and performed in the highest standards of workmanship.

Q. Contractor Guaranty and Warranty: All contracted work shall be guaranteed by the contractor for a period of one (1) year for labor from the date of final acceptance against defective materials, design, and workmanship. The material shall be as specified in the manufacture’s specifications but at least one year. Upon receipt of notice from the Government of failure of part or parts of the guaranteed equipment during the warranty period, the affected part or parts shall be replaced within 48 hours with new parts by and at the expense of the contractor. ALL WARRANTIES SHALL BE TURNED OVER TO THE COTR PRIOR TO FINAL INVOICING.

END