This is a Scope of Work document issued by the United States Coast Guard Base Los Angeles Long Beach for the renovation of two restrooms located in Building 33 (Base Exchange). The project encompasses comprehensive restroom renovations including removal and replacement of toilets, sinks, faucets, water supply valves, and water lines; removal and reinstallation of fixtures such as mirrors, handicap rails, paper towel holders, and soap dispensers; repair and painting of drywall; removal of vinyl flooring and installation of new ceramic tile with matching cove base; replacement of ventilation fans and ceiling repairs; installation of new LED lighting fixtures and light switches; and operational testing of all newly installed fixtures witnessed by the Contracting Officer's Representative. The project is located at 1001 South Seaside Avenue, San Pedro, California 90731. Contractors must submit written notification to the Contracting Officer five business days in advance of commencing work and five business days prior to final inspection readiness. All on-site work must be performed between 7:00 AM and 4:00 PM, Monday through Friday, excluding federal holidays, unless otherwise approved. Contractors are required to provide a list of all on-site personnel, including subcontractors and suppliers, five days prior to commencing work for security clearance and must provide 48 hours advance notice of all material deliveries.

All bids must include a detailed breakdown of costs for labor and materials. This is a Total Small Business Set-Aside contract under NAICS code 236118 (Residential Remodelers). Contractors must be registered in the System for Award Management (SAM.gov) and possess a DUNS number prior to award. All products must meet Buy American and Buy America Act requirements as specified in DFARS 225 and FAR 25.103. Contractors are responsible for all costs associated with utility connections and disconnections, though water and 120-volt electricity are available at no cost for consumption. Contractors must comply with OSHA Safety and Health Standards, California Code of Regulations Title 8, and Army Corps of Engineers EM385-1-1, with the more restrictive standard applying when standards differ. An Accident Prevention/Safety Plan must be submitted before work commences. All refuse and waste materials become the contractor's property and must be disposed of off government property in accordance with federal, state, and local regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

BASE LOS ANGELES LONG BEACH

1001 South Seaside Ave.

SAN PEDRO, CALIFORNIA 90731

Scope of Work

FOR

Renovate Restrooms located at Building 33 Dated: 06/04/2026

Base Los Angeles Long Beach Initial Date

TBD

Contracting Officer (KO)

Paul Nelson Paul.L.Nelson@uscg.mil

Contracting Officers Representative (COR)

LT Harrison Stanley

BASE FACILITY ENGINEER

mailto:Paul.L.Nelson@uscg.mil

GENERAL REQUIREMENTS

PART 1 GENERAL

1.01 SCOPE OF WORK: Provide all labor, materials, and equipment necessary to renovate two restrooms located at building 33 (Base Exchange). The work includes, but is not limited to, the following:

A. Remove and replace with new: toilet, sink, faucet, water supply valves, and water lines.

B. Remove all items on walls including mirror, handicap rails, paper towel holder, toilet paper holder, and soap dispenser (save paper towel dispenser and handicap rails for reinstall). Repair all holes and any damage to drywall. Paint all walls floor to ceiling.

C. Remove vinyl flooring and prepare floor for install of new ceramic 2’x1’ tile (see photo of sample below). Replace all cove base to match existing.

D. Remove old vent fan and replace with new vent fan. Repair any damage to ceiling then paint ceiling.

E. Replace light switches to match existing. Install new mirror and toilet paper holder. Reinstall handicap rails.

F. Replace all lighting in restrooms with new LED lighting fixtures.

G. Contractor must perform an operational test on all newly installed fixtures to be witnessed by COR before project closes out.

1.02 LOCATION: Project site is located at Building 33 at US Coast Guard Base Los Angeles Long

Beach, 1001 South Seaside Avenue, San Pedro, CA 90731. Contracting Officer’s Representative

(COR) for this project is Paul Nelson Paul.L.Nelson@uscg.mil.

1.03 SITE INVESTIGATION: Investigate the site per FAR 52.236-3 to ascertain the general and local conditions which can affect the work or its cost. Contact: Paul L Nelson via email to arrange site access. Vendors must have DUNS and be registered at System for Award Management

(SAM.gov) prior to be awarded a government Purchase Order.

1.04 CONTRACTOR SECURITY REQUIREMENTS: For this Coast Guard facility, the Contractor shall provide a list of all on-site personnel on the provided access request form, including sub-contractors and suppliers, to the Contracting Officers Representative (COR) 5 days prior to commencing work for clearance (clearance can take up to 3 business days). The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility.

Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.

Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. If identification does not indicate United States citizenship, Coast Guard Security will require proof of the legal right to work in the United States. Contractor and delivery personnel will be subjected to an immigration status and outstanding criminal warrants check.

mailto:Paul.L.Nelson@uscg.mil

Contractors shall provide the COR with 48 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise access to the Coast Guard facility may be denied.

1.05 CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facilities normal operations. Notify the COR 3 business days in advance of any shutdowns.

Contractor is required to coordinate Lock Out/Tag Out Processes and Procedures with the

COR. Perform all on-site work between the hours of 7:00 AM and 4:00 PM, Monday through

Friday (Federal Holidays excluded), unless otherwise approved by the COR or the Facility Engineer

(FE).

1.06 NOTIFICATION OF START AND COMPLETION OF WORK: The Contractor shall notify the

COR in writing (email) five (5) business days in advance of the date they intend to commence work, and five (5) business days prior to the date that work will be ready for final inspection. All notifications must be approved by the COR, in writing, prior to commencing or completing work.

1.07 RECYCLING AND DISPOSAL OF REFUSE: Refuse, excess, or waste materials resulting from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposals shall be done in accordance with federal, state, and local laws and regulations.

1.08 SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health

Regulations for Construction and California Code of Regulations, Title 8, Div. 1, Ch 4, Subchapter 4

Construction Safety Orders, and Army Corps of Engineers EM385-1-1. When the standards differ, the more restrictive standard shall apply. The contractor shall provide barriers, temporary fencing, ventilation, trench covers, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents. Return work site to original condition after completion of work by cleaning and removal of all construction material. An Accident Prevention/Safety Plan shall be submitted by the contractor prior to any commencement of work.

1.09 SUPPLIES AND SERVICES: All products must meet the requirements of the Buy American and

Buy America Acts as amended in DFARS 225 and the FAR 25.103.

1.10 TEMPORARY FACILITIES:

A. STORAGE: The location for exterior stock piling or lay down area of materials will be available on base with location to be determined by COR and Facility Engineer depending on size. The

Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The Coast Guard assumes no responsibility for material or equipment left in the storage area.

B. SANITARY FACILITIES: Toilet facilities are available for use located in Buildings 33.

C. WATER AND ELECTRICITY: Water and 120V electricity are available at no cost to the Contractor.

Cost of these utility connections and disconnections shall be the responsibility of the Contractor.

Personnel using extension cords to bring power from another location for construction, maintenance, remodeling, etc., shall employ portable ground fault circuit interrupters (GFCIs), even if connecting to building wiring. Use of portable generators and compressors is authorized at contractor expense to operate portable equipment.

1.11 All bids submitted shall include breakdown of cost for labor and materials.