SOW for B747-400 SIM Fy26-FY28_Redacted.pdf
PDF 192 KB Posted
- Attached to
- 747 Training / GR CTFVC-25B
- Solicitation number
- F1S0BB5076A001
About this file
This Statement of Work (SOW) details simulator training requirements for the USAF 418th Flight Test Squadron's VC-25B test pilots using a B747-400 flight simulator. The objective is to conduct full-motion simulations semi-annually through FY26-FY28, with two 4-hour training sessions per year to maintain pilot proficiency in flight test planning and Safety Review Boards. The contractor will be responsible for providing all management, personnel, equipment, facilities, and engineering support to configure and make available the B747-400 simulator, with training sessions scheduled for June and December of 2025 and 2026 at Edwards Air Force Base in California. The associated federal contract opportunity is a small business set-aside with a NAICS code of 611512 (Flight Training) and a size standard of $34,000,000, seeking a multi-year contract to provide simulator flight training services.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work – SOW
USAF 418th Flight Test Squadron (418 FLTS) / Global Reach Combined Test Force (GR CTF) B747-400 Flight Simulator
May 7, 2025
1. Background
The Purpose of this Statement of Work (SOW) is to outline requirement to support the USAF 418th Flight Test Squadron (418 FLTS)/ Global Reach Combined Test Force (GR CTF). The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government. The contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this SOW.
2. Objective
The goal of this effort is to allow 418th VC-25B test pilots to maintain proficient in the B747-
400. Test Pilots assigned to VC-25B program will require training to execute Flight Test planning, and Safety Review Boards (SRBs).
3. Scope
The objective is to conduct full-motion B747-400 simulations to accomplish USAF 418th FLTS The SIM training conducted semi-annually for 2 four-hour sessions to allow for proficiency and familiarization on Flight Test Plans.
4. Task Description
Individual simulator sessions will be scheduled semiannually through FY26-FY28. The contractor shall configure the simulator as a standard B747-400 and an airfield with various instrument approach types.
5. Responsibilities
A. The contractor shall provide:
1. All management, personnel, equipment, facilities, tools, materials, supervision, and other items and engineering support services to configure and make available the B747-400 simulator as described in the task description at section 4.
2. 4-hours per session of simulator time for USAF test pilot training semi-annually.
B. The government will provide:
1. Any changes to scheduled milestones with 2 weeks’ notice.
File details come from the government source that posted it. Updated .