SOW for AC plant 3-cui_Redacted.pdf

PDF 281 KB Posted

Attached to
Portsmouth Naval Shipyard R114 Repair
Solicitation number
N3904024PSE2816
Issued by

About this file

This document is a Statement of Work (SOW) for the overhaul of the replacement #3 refrigeration air conditioning (RAC) plant compressor/motor at the Portsmouth Naval Shipyard (PNSY). The contractor, Johnson Controls, will perform a complete overhaul of the provided R-114 centrifugal air conditioning compressor and motor assembly, including teardown, condition assessment, replacement of wear parts, reassembly, and testing. The overhaul must be completed by June 25, 2025, with a target start date as soon as possible. PNSY will ship the compressor/motor assembly to the contractor's facility, and the contractor will return the overhauled unit to PNSY upon successful testing. The contractor will provide all required tooling and equipment, and PNSY will review the condition report and test data provided by the contractor. This SOW is related to a pre-solicitation for a Firm Fixed Price contract to support this requirement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Controlled By: Portsmouth Naval Shipyard Controlled By: Code 220P

CUI CATEGROY: OPSEC

DISSEMINATION CONTROLS: FEDCON

STATEMENT OF WORK FOR

REPLACEMENT #3 RAC PLANT COMPRESSOR/MOTOR OVERHAUL

ON

Perform Overhaul of replacement #3 RAC Plant Compressor/Motor for Perform overhaul at Johnson Controls/

1.0 BACKGROUND

1.1 This Statement of Work (SOW) describes overhaul to be performed by Johnson Controls (Contractor) in support of repair of the #3 RAC Plant, component overhaul is to be performed at the vendors site. The contractor will provide the equipment and work required to generate the deliverables outlined below.

1.2 The overhaul requires contractor expertise and equipment to certify that the replacement compressor/motor asset for the #3 RAC Plant on is acceptable for installation shipboard. The Engineering and Planning Department (EPD) of PNS has determined that to meet the Department of Navy and Department of Defense commitments in support of the it is in the Government’s best interest to have the equipment and service be provided by Johnson Controls (Contractor).

1.3 Control Specifications/References:

(A) S6230-BM-TMM-A10, Revision 0, Change F - Refrigerant-114 Duplex Hermetic Single-Stage Centrifugal Chilled Water Air Conditioning Plant 150 Ton Capacity

2.0 OBJECTIVE AND SCOPE

2.1 Overall Objective: The contractor will perform overhaul, motor testing, painting and operational air run and lube oil pressure/flow test of the replacement #3 RAC Plant Compressor/Motor in accordance with Reference (A). The contractor is provide all material for overhaul. Upon successful testing, contractor shall ship replacement #3 RAC Plant Compressor/Motor back to PNSY. Upon successful testing, the contractor shall provide copies of test data to PNSY, .

2.2 Scope: The contractor will be required to support the overhaul and testing of the replacement #3 RAC Plant Compressor/Motor on or about September 2024. Specific start date is request to be as soon as possible. Overhaul must be completed no later than 6/25/2025. These dates are projected dates and are subject to change.

2.2.1 PNSY will crate and ship the R114 asset to vendor’s site.

2.2.2 Vendor will perform overhaul of provided asset to include tear down of unit, motor will have condition checked and rotor and stator will be tested, wear parts in motor and compressor will be replaced, compressor will be air run, compressor to be set up on a test stand and ran to verify oil pressure, unit to be reassembled with nitrogen blanket and be painted.

2.2.3 Vendor will provide a condition report of motor and compressor components along with test data to PNSY Code 260.

2.2.4 Vendor will crate and ship unit back to PNSY.

3.0 PERFORMANCE OBJECTIVES

3.1 The required Tooling and Equipment is to be provided by the contractor (Johnson Controls) at their facility as needed to support overhaul as specified in with of Reference (A).

4.0 QUALITY ASSURANCE

4.1 Final verification and acceptance of system cleanliness will be based upon satisfactory overhaul of replacement #3 RAC Plant Compressor/Motor in accordance with Reference (A).

5.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

5.1 1/EA: R-114 150 Ton Capacity Centrifugal Air Conditioning Compressor and Motor Assembly.

6.0 GENERAL

7.0 POINTS OF CONTACT

7.1 Contracting Officer Representative:

7.2 Technical POC: