SOW for 45RB-M HOSE KIT.doc

DOC document 38 KB Posted

Attached to
PARTS KIT, HOSE ASSEMBLY, NONM
Solicitation number
HSCG40-21-Q-DZ145
Issued by

About this file

This document contains a statement of work and related federal contract opportunity notice. The statement of work specifies the fabrication of 45-foot hoses according to supplied drawings and pressure testing standards. Key deliverables include pressure testing certificates and labeling of hoses. The period of performance is approximately 30-45 days from purchase order receipt. The related federal contract opportunity is a solicitation for parts kits consisting of hoses and assemblies. The solicitation is set aside for small businesses and seeks fixed price quotes for 10 kits to be delivered by 23 September 2021. The solicitation contains standard terms for commercial item contracts and requires offerors to submit representations and certifications. Evaluation will be based on lowest technically acceptable offer.

View the file

Other files

File Type Posted
45RBM HOSE AND HOSE ASSEM DWG.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK FOR

45’ RB-M Hose Fabrication

CONTENTS

1. Introduction

2. Scope of work

3. Period of performance

4. Deliverables

5. Schedule

6. Acceptance Criteria

7. Quality Assurance

8. Contracting Officer’s Representative

9. Notes

1.0 INTRODUCTION

The vendor shall fabricate hoses as listed in the attached drawing and pressure test IAW the following standard specifications.

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems

2.0 SCOPE OF WORK

1. Hydrostatic Test. The Contractor shall hydrostatically test all hose assemblies prior to installation as follows:

Draw a circumferential chalk line around the hose next to each fitting attachment. Measure the distance from the lines to fitting edges at four places 90° apart.

Using fresh water or other appropriate liquid (hose assembled for water systems shall be tested with only fresh water), apply a hydrostatic proof pressure equivalent to twice the rated hose working pressure reference Coast Guard Drawing 45 RB-M 505-001. Hold this pressure for ten (10) minutes. Hose shall not burst, leak or show signs of fitting separation.

Upon completion of test, measure the distance from chalk lines to fittings. Any change in measurement from those is reason for rejection of the tested hose assembly.

Flush. After hydrostatic testing, the Contractor shall flush the hose assembly with water between 130°F and 180°F for a period between 5 and 10 minutes. Flush shall be straight through and not recirculated.

For hydraulic system hoses the Contractor shall flush each new hose assembly to remove all contaminates to achieve cleanliness Grade “A”.

Treatment after testing. Upon completion of pressure tests and flushing, the Contractor shall dry the hose assembly and cap or plug the end fittings to prevent damage and to keep out dirt. Install the tested hose assembly as soon as practical after completion of tests.

2. Labeling. The Contractor shall attach hose tags to all renewed hose assemblies in accordance with SFLC Std Spec 5000, paragraph C2.2.1.4 which includes the CMS code listed on the drawing.

3. Vendor is to prepare for shipping and ship to;

USCG IPD Sault STE Marie

Attn: Devan Truelove

337 E. Water St.

Sault STE Marie MI. 49783

USCG IPF New Orleans

Attn: Joshua Hutchinson

1790 Saturn Blvd.

New Orleans La. 70129

USCG SFLC Boston

ATTN: Jonathan Voeltner

427 Commercial St.

Boston MA. 02109 USCG IPF Miami ATTN: Daniel Gentile

100 Macarthur CSWY

Miami Beach Fl. 33139

USCG IPF Honolulu

ATTN: Adam Brown

400 Sand Island PKWY Honolulu HI. 96819

· USCG SFLC Boston should receive 2 kits.

3.0 PERIOD OF PERFORMANCE

Based on market research, the performance period shall approximately 30-45 days from the date the purchase order is received.

4.0 DELIVERABLES

The contractor shall provide the following:

Pressure testing certificate identifying hose identification number and test pressure. Document should be enclosed inside a protective material and located inside the packaging with the material.

5.0 ACCEPTANCE CRITERIA.

The government reserves the right to witness, assist and stop the repair process if felt the process appears unsafe.

The government will assess the replacement in its entirety prior to issuing approval.

6.0 QUALITY ASSURANCE.

All work shall be completed IAW supplied drawings, manufactures specifications, and CG supplied process guides.

7.0 Point of Contact.

The Point of Contact for the U. S. Coast Guard will be CWO William K. Bryant 410.762.6180.

The alternate Point of Contact for the U. S. Coast Guard will be LT Harold Piper 410.762.6188.

8.0 NOTES.

All Government Furnished Information and work product shall remain the property of the U.S. Coast Guard and shall not be released to any third party or published without prior approval from the COR.

File details come from the government source that posted it. Updated .