REPAIR AND REPOINT STONE WALLS AT RIVER
Solicitation number
140P5224R0014
Issued by

About this file

This document is a Statement of Work (SOW) for the repair and repointing of historic stone walls at the Fort Donelson National Battlefield. The Department of the Interior's National Park Service is issuing a combined synopsis/solicitation (Solicitation Number: 140P5224R0014) to procure these services. The contractor will be required to provide all labor, equipment, supervision, and materials necessary to complete the repair and repointing work. The NAICS code for this acquisition is 238140. The contract will be a firm fixed price award based on an evaluation of the offerors' cost, technical approach, and relevant experience. Proposals must be submitted electronically to the Contracting Officer by the closing date noted in the solicitation. The Contracting Officer's Representative is Craig Davis, the Facility Management and Park Structural Fire Coordinator for the Fort Donelson National Battlefield/Cemetery.

View the file

Other files

File Type Posted
B03_Wages.pdf PDF
Sol_140P5224R0014.pdf PDF
Solicitation_Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Donelson National Battlefield Dover, TN

STATEMENT OF WORK:

Repair and Repoint Stone Walls at River Battery (Civilian Conservation Corps (CCC) Walls)

DATED:

September 29th, 2023

NATIONAL PARK SERVICE

Interior Region 2 South Atlantic Gulf

STATEMENT OF WORK

Repair and Repoint Stone Walls at River Battery Fort Donelson National Battlefield

I. GENERAL. The National Park Service, Fort Donelson National Battlefield, has a need for Repair and Repoint Stone Walls at River Battery in Dover, Tennessee, The historic stone walls of the River Battery Loop encompass the Loop Road and parking area at Fort Donelson. The two stone walls were built during the 1930s by the Civilian Conservation Corps (CCC), are significant historical resources on the cultural landscape. The loop area is on the tour route, and the most visited location of the national park.

Repointing of mortar joints has been undertaken at several times, with various types of mortar mixes used. Of the 3330 sq. ft total of wall located at the River Battery around 90% will require joint repointing. Also, there are around 120 limestone blocks that are spalling due to freeze/thaw induced weathering and require either conservation or replacement in kind. Of the 120 historic stones that are fractured around 40 are possibly beyond conservation pointing and will require replacement in kind. Finally, weep holes through the retaining wall portions must be cleared and stabilized to ensure functionality.

II. REQUIREMENTS. Contractor shall provide all labor, tools, equipment, materials, and supervision required to accomplish this Statement of Work. The contractor shall follow all the Park’s policies, procedures and guidance with regard to performing work activities on federal lands. The contractor shall exercise management and operational control over and retain full responsibility for performance requirements as set forth in this SOW. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

Visitors are the park’s primary customers. While the River Battery Loop will be open to visitors during the period when this work occurs, occasional contact with visitors by the contractor is possible. As all resources and operations of the NPS are ultimately paid for by the U.S taxpayer, any visitors that the contractor comes into contact with while accomplishing this work should be considered a customer and be accorded all reasonable courtesy.

This area is currently in operation and all work shall be done in a way that allows for this continued operation. Safe visitor and/or employee access to the area must be maintained at all times.

This is the most visited location of the park and when planning safety, methods that need to be taken to protect workers/work site from visitor vehicles.

All demolition materials shall be properly disposed of in an approved landfill off NPS property. No demolition or construction materials can be disposed of on NPS property, nor can they be disposed of in NPS dumpsters or trash receptacles. Items suitable for recycling will be delivered to an appropriate facility.

Protect exterior landscaping, building walls/foundations, paved walkways, and parking surfaces, from trampling and impact damage while the work is being executed.

All prospective Bidders, and their Subs, as appropriate are strongly encouraged to visit and examine the existing conditions of the Project prior to submission of Bid in order to better understand the Work and aid in forming any questions prior to the submission of Bid. Lack of knowledge of the existing conditions will not be allowed as a basis for extra compensation. Offerors are encouraged to incorporate process improvements and industry best practices in their proposals.

Quality Assurance: The services to be performed by the contractor shall be supervised by the Contracting Officer or his/her authorized representative. Inspection by the COR will be made daily or more frequently. Contractor shall maintain a qualified crew throughout the duration of the work and ensure quality control. Only qualified journeypersons as defined by local jurisdiction shall be engaged in stone work. Apprentices may be employed provided they work under the direct supervision of a qualified journey person in accordance with trade regulations.

During work stoppages (including overnights) and at completion of the project, clean work areas and properly dispose of all waste materials, debris, and supplies and store or remove equipment. Do not leave materials where employees or visitors could access when contractors’ employees are absent from work area.

CLIN 0010 – Contractor shall install a moisture barrier such as Bituthene 3000 Flexible Waterproof Membrane by Grace (or COR Approved Equal) with drainage mat and rigid fiberboard to provide protection from penetration, per manufacturer's recommendation, on below grade portion of retaining wall.

While work is being performed along the back side of this wall archeological monitoring will be conducted. Which the NPS will coordinate with contractor when the schedule has been received

CLIN 0020 – Contractor shall determine which limestones are the most severely fractured and mark them for removal and replacement (with COR Approval).

Prior to repointing the stone walls determine which limestones are the most severely fractured and mark them for removal and replacement with COR Approval. Limestone’s that are severely fractured will be replaced with stones that will emulate the original historic fabric and the proportion of the stone removed.

Wall Materials – Method for In-Kind Replacement and Mortar Matching The scope of services includes identifying an in-kind source of replacement limestone material. Replacement limestone will match the color, texture and properties of the original material and will be available in sizes to match the original sizes of removed masonry units. Finishing of exposes surfaces of replacement masonry units will mimic the rockface tooling of the original units. https://quarriesandbeyond.org/states/ky/ky-photos2.html The scope of services includes mortar analysis performed by the National Center for Preservation Technology and Training (NCPTT) to develop a compatible mortar mix for repointing and setting mortar. Goals for the mortar analysis are to establish the Sand: Cement: Lime ratio based on the historic mortar AND to recover a cleaned sand sample that will be the basis for the sand incorporated into the new mortar. Sand is the primary component of any mortar and has the greatest impact on the final visual appearance of the repointed joints. Therefore, color control of the sand is critical to the success of the repointing campaign.

Stone Evaluation and Treatment - Severely fractured masonry units will be replaced. Prior to repointing the stone walls, determine which limestone masonry units are the most severely fractured, possibly up to 40, marking them for replacement in kind, matching the original historic fabric and the proportions of the stone removed. Masonry units proposed for replacement will be marked with a China Red wax pencil to allow the NPS Contracting Officer Representative to backcheck and confirm the scope of proposed replacement CLIN 0030 – Contractor shall remove old cement that had been used for re-pointing which does not match original mortar and replace it with a lime and sand mortar.

Remove all deteriorated mortar and replace missing mortar to maintain the structural properties, and historic fabric, improve the appearance, and form weather tight joints. Due to the stone walls being original from the 1930s Civilian Conservation Corps time period it is recommended that hand tools be used in the removal of deteriorated mortar, so as not to damage the masonry units surrounding the mortar. Contractor will be responsible for removing all debris from the site and park.

Mortar Evaluation and Treatment - Examine all mortar joints on both historic stone walls to determine which specific areas of joints require repointing. Mortar joints that are cracked, deteriorated, eroded, contain voids, or are poorly bonded to masonry should be repointed. All historic repointing projects should conform to ASTM Standard Guide for Repointing Historic Masonry, E2260- 03. Deteriorated mortar joints will be marked with a China Red wax pencil to allow the NPS Contracting Officer Representative to backcheck and confirm the scope of proposed repointing.

Remove all deteriorated mortar and replace missing mortar to maintain the structural properties, and historic fabric, improve the appearance, and form weathertight joints. Due to the stone walls being original from the 1930s Civilian Conservation Corps time period it is recommended that hand tools be used in the removal of deteriorated mortar, so as not to damage the masonry units surrounding the mortar. Contractor will be allowed to use power tools to remove masonry units scheduled for replacement. Contractor will be responsible for removing all debris from the site and park.

Wall Specs:

The exterior loop road wall, roadway side, is 255 feet long x 3 ft. high, for a total square footage of 765 sq. ft.

The exterior loop road wall, riverfront side, is 255 feet long x 8 ft. high, and 22 inches wide, for a total square footage of 2,040 sq. ft.

The interior loop road wall, earthworks side, is 175 ft. long, 3 ft. high, and 18” thick, for a total square footage of 525 sq. ft.

Total square footage of walls is 3330.

Project Conditions:

Do not repoint mortar joints or repair masonry unless air temperatures are between 40 to 95 degrees Fahrenheit and will remain so for at least 48 hours after completion of work. Prevent mortar used in repointing and repair work from staining surface of surrounding masonry and other surfaces. Immediately remove mortar in contact with exposed masonry and other surfaces. Protect sills, ledges and projections from mortar droppings Sequencing/Scheduling:

Perform masonry restoration in the following sequence:

1. Clean wall exterior stonework prior to repointing; use either pressure washer (low psi) or use brushes.

2. Rake out existing mortar from joints indicated to be repointed to a minimum depth of 2 to 2-1/2 times the width of the joint (for most joints, this will approximately 1 inch). Do not remove mortar in excess of one third the depth of the masonry unit above. Remove mortar using hand tools only. Do NOT use electric or pneumatic chisels. Do not spall or chip masonry. Any damaged masonry must be repaired.

3. Clean joints with water, rinse with maximum 100-psi pressure. Masonry joint should be damp and without standing water.

4. Mix mortar carefully, measuring and mixing carefully to assure visual and physical characteristics. Dry ingredients should be measured and volume and be thoroughly mixed before the addition of any water (more information on mix below).

5. Perform field test of new repointing work on masonry (a 3’ x 3’ area on the least visible masonry facade). Contact NPS Southeast Region Project Manager for approval of field test prior to continuing with work. This field visit should occur at a minimum of 72 hours after the field test is performed to ensure that the repointing areas have cured. See additional information below.

6. Repoint existing mortar joints for remainder of structure or building, or as specified by project. (See additional information below).

7. Clean existing masonry surfaces after repointing work is completed. Clean mortar from masonry face promptly to prevent staining. If necessary, after 24 hours of set time, scrub and wash surface to remove laitance using water and detergent, but no chemicals. Use natural sponges and bristle brushes. Wire brushes are not to be used.

8. Protect repointing and replacement stones during curing. Cover with burlap or similar material so that repair work is not in direct sun or exposed to rain. Mist the repair work periodically depending on ambient temperature and humidity to maintain favorable conditions for cure.

Mortar Materials:

Ensure the consistency of the mortar, color, texture and tooling techniques match the original mortar. According to ASTM C 270, the mortar used in pointing should be pre-hydrated in order to reduce the amount of shrinkage that can occur after it is placed in the joints.

CEMENT: ASTM C 150, Type II, white, non-staining unless it can be established that the original mortar used grey cement. For stonework and other masonry indicated, provide non-staining white cement complying with staining requirement of ASTM C91 for not more than 0.03% water-soluble alkali.

HYDRATED LIME: ASTM C 207, Type S or SA, Hydrated Lime for Masonry Purposes. This is high plasticity lime (not air entrained) instead of quicklime.

AGGREGATE: ASTM C 144, unless otherwise indicated.

SAND: Use natural rounded sand, clean, sound and washed. Provide sands that will produce final mortar color and texture to match the existing, and with aggregate type and grading similar to existing mortar. The color of the sand shall be the primary factor used to make mortars that match original. Sand should generally meet ASTM C 144, although sieving the sand may be needed to match the historic particle appearance and gradation.

WATER: Clean, free of oils, acids, alkalis and organic matter. No antifreeze compounds or other admixture shall be used. {Water access is ¼ mile away} CHEMICALS: No modern chemical additives should be used. Mortar Analysis: A visual analysis of the masonry is important to understand the mortar mix, proportions, and removal and application techniques needed. For structures of high historic significance, a mortar analysis by a qualified laboratory is recommended.

Mortar Mixes:

PRE-BLENDED MORTAR MIXES: Pre-blended masonry cement/mortar mix should not be used since it is designed to produce mortars with compressive strength beyond what is common on most historic mortars.

PRE-BLENDED LIME MORTAR: Pre-blended lime mortars are also not recommended in most cases since the mortar will often not be an exact match to historic mortar. Pre-blended lime mortar should never be used for “spot repointing” projects. If for complete repointing projects, the Historic Preservation Office confirms through a test panel that the pre-blended lime mortar is very close to color, composition and texture to historic mortar then it may be permissible. However, in no circumstances shall the mortar differ from the mortar proportions requirements specified below.

MEASUREMENT AND MIXING: Measure cementitious and aggregate material in a dry condition by volume or equivalent weight. Do not measure by shovel, use known measure, mix materials in a clean mechanical batch mixer.

MIXING MORTAR: Thoroughly mix cementitious and aggregate materials together before adding any water. Then mix again adding only enough water to produce a damp, unworkable mix that will retain its form when pressed into a ball. Maintain mortar in this dampened condition for one to two hours. Add remaining water in small portions until mortar of desired consistency is reached. Use mortar within 30 minutes of final mixing; do not re-temper or use partially hardened material.

ADMIXTURES: Do not use admixtures of any kind in mortar.

TOOLS: Use a pointing tool sized and shaped to the proper width for the joint being pointed. Match the profile and tooling of the existing joints exactly. Apply mortar using wooden trowel to simulate the original mortar coating.

Mortar Proportions:

SPECIFICATIONS: NEW MORTAR MUST MATCH ORIGINAL IN COLOR, COMPOSITION, TEXTURE AND TOOLING. New mortar must have greater vapor permeability and be softer than masonry units. It should also be as vapor permeable and at least as soft as the historic mortar (not harder).

The original mortar should be carefully analyzed by a person trained in this field. A preservation architect is highly preferred to help determine the appropriate proportions in advance of the project. In all cases, there should be a site visit with the contractor and Historic Preservation Office to perform a visual analysis of the mortar prior to the initiation of the project.

MIX PROPORTIONS BELOW ARE EXAMPLES ONLY AND MUST BE REVISED TO SUIT PROJECT REQUIREMENTS ONCE EXISTING MORTAR HAS BEEN ANALYZED.

For structures dating from 1930 or earlier:

The final mortar mix shall have no more than 25% of total volume of the lime and Portland cement – combined – consisting of Portland cement unless testing of historic mortar demonstrates a higher Portland cement content. Generally, the proportions fall within ASTM Type K to L range. The range of acceptable mortar proportions is below:

1/10-part white Portland cementTO1-part white Portland cement
3 parts lime4 parts lime12 parts natural sand15 parts natural sandWaterWater

Test Sample:

Prepare one test sample at inconspicuous location. Test sample shall be approximately nine square feet in size and let cure at a minimum of 72 hours. Protect test sample from dirt and moisture. The regional Historical Architect and park staff will review the test sample once sample has cured, and only proceed with project once NPS COR approval is obtained.

Warranty: The contractor shall provide a warranty all work. Any and all repairs to included parts shall be paid by the contractor during this one-year period.

III. STIPULATIONS

A. FODO Contractor Site hours of operation for this project: Monday through Friday, 7:00am to 3:30pm. If different hours are required, please submit a request 72 hour in advance to the COR.

B. The Government will provide for a staging area if requested

C. SAFETY - The Contractor shall protect from damage all existing improvements and utilities at or near the work site, the locations of which are made known to or should be known by the Contractor, but contractor shall verify all locations. The Contractor shall repair at no cost to the government any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

1. General - The Contractor must comply with all Federal and State OSHA requirements. The contractor shall be responsible for the safety of their employees and equipment, and for any injury or damage done to or by them from any source or cause. The contractor shall save and hold the United States free from all claims for damages to any and all persons and (or) property arising from the execution of the work covered by these specifications.

Contractor may not interrupt visitor use of the site, especially visitor use of the parking area and visitor pedestrian traffic on the concrete walkways. Contractor may not operate vehicles on or across concrete walkways, nor use walkways as a route to transport materials.

2. Accident Prevention - The Contractor shall conduct operations to prevent accidents, injuries, and damages. Additionally, the Contractor shall comply with applicable state and local safety, health and sanitation laws.

3. Accident Reporting - All reportable accidents, which are those resulting in death, occupational disease, traumatic injury to employees or the public, fires, and property damage by accident in excess of $100, shall be reported to the Contracting Officer and COR immediately. Within 7 days of a reportable accident, the contractor shall fill out and forward to the Contracting Officer an Accident/Property Damage Report (Form CM-22).

If the Government determines that the Contractor did not use reasonable care for Government property and caused damage to or loss of said property, the Contractor shall repair the damage or replace the property, at no cost to the Government. If the Contractor fails or refuses to make such repairs or replacement, the Contractor shall be liable for the cost, which will be deducted from the contract payment.

4. Physical Security

a) The contractor shall cooperate with Government personnel in safeguarding Government facilities and property.

b) The contractor will secure all doors or gates given access to after the completion of contracted work activities.

c) The contractor shall be responsible for reporting to the COR all acts of vandalism, larceny, pilferage, or any other damage that is discovered. Reports shall be made no later than within 24-hours after discovery. Notification must be made via telephone or in person and followed-up in writing.

5. Environmental Program

a) The Contractor shall comply with all Federal, State, and local laws, regulations and standards regarding environmental protection.

b) The Contractor shall conduct all contracted activities in a manner to prevent contamination of Government land and property.

c) The Contractor shall ensure all lubricants, petroleum products, cleaning materials, or any other hazardous substances are not spilled, leaked or disposed of on Government property.

d) The contractor shall dispose of all hazardous substance in accordance with environmental regulations.

e) If spills or contamination occur, the Contractor shall be responsible for cleanup and any associated costs in accordance with Federal, State and Local Law. Such spills shall be reported to the COR immediately.

f) The Contractor shall identify all hazardous waste associated with conducting required work items, and properly label, handle, and dispose of such waste in accordance with applicable regulations.

g) The Contractor shall address hazardous materials and hazardous waste on a Job Hazard Analysis form prior to commencing work contained within this contract.

h) The Contractor shall furnish the COR copies of the Safety Data Sheets (SDS) and an inventory list for all items stored, or being used by the Contractor employees on the Government facilities

6. Conduct of Contractor Employees

a) All contractor employees and subcontractors performing work under this contract shall conduct themselves in a professional and safe manner at all times.

b) Continued or egregious unprofessional or unsafe behavior will be grounds for the permanent removal of the individual from performing work under this contract, as determined by the COR.

c) The contractor shall permanently remove from service under this contract, as described above, individuals whose behavior has been determined by the COR to be contrary to the public interest or inconsistent with the best interests of the NPS.

d) The CO or the COR may require the Contractor to immediately remove from the work site any employee or subcontractor who is incompetent, endangers persons or property, or whose physical or mental condition would impair their ability to satisfactorily perform the work. Notification to the Contractor will be promptly made in writing if time and circumstances permit. Otherwise, notification will be verbal and confirmed in writing as soon as possible.

e) All criminal activity or conduct unbecoming resulting in the dismissal of an employee by the contractor shall be reported to the COR.

f) No such removals of contractor employees as described above will reduce the contractor's obligation to perform any of the work required under this contract.

g) Contractor personnel shall not smoke inside government buildings, or within 50 feet from an entrance to government buildings. The use of e-cigarettes is also included in this restriction.

7. Identification of Contractor Employees and Vehicles

a) The contractor shall furnish their employees that are performing work under this contract with a uniform shirt and outer garments that include the company's name as identification. Contractor employees shall wear company identifying clothing at all times when performing work under this contract. Any subcontracted work shall follow the same guidelines, whereby the subcontracted company's employees shall also have company identifiable clothing worn at all times while performing work on NPS property.

b) All contractor owned vehicles that are to be used while perming work under this contract shall have the company's name prominently displayed in not less than two-inch letters on the outside of both front doors of each vehicle in such a manner as to provide a readily visible means of identification.

8. Damage or Loss of Contractor’s Supplies and Property

a) The Contractor shall be responsible for taking action necessary to protect Contractor and their employee property from loss, damage or theft. Government assumes no responsibility for loss, damage, or theft, of the above. All incidents of theft (or suspected theft) of contractor materials, supplies, or equipment from the government facility shall be reported to the COR.

9. Insurance - The Contractor must be insured in accordance with the State of TN insurance regulations. The Government will not be responsible in any way for damage to Contractor’s equipment, vehicles, tools or materials or the Contractor’s employees and their belongings brought onto the Government’s premises, occasioned by fire, theft, accident, or otherwise. Nor will the Government accept any liability as a result of Contractor or Contractor employee negligence.

10. The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the contractor shall remove the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Unsightly materials and debris including excess materials, garbage, and equipment should be removed as required; while materials should be scheduled for delivery only as required for immediate use.

11. Stop Work - At any time during the Project, the Contracting Officer reserves the right to Stop Work for protection of employees or visitors, security, or any other reason at his/her discretion.

12. ACCIDENT PREVENTION PLAN: Before on-site work begins, submit to the COR for acceptance an accident prevention plan containing at minimum the following information:

1. EMERGENCY INSTRUCTIONS: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

2. Name of responsible Arborist or Supervisor to carry out the program.

3. Emergency Planning - Planning for possible emergency situations including fires, windstorms, lighting storms etc.

4. First aid procedures - Provide adequate facilities for the number of employees and the type of construction at the site. Provide adequate training to ensure prompt and efficient first aid.

5. Training - Ensure that all employees have adequate training for the tasks that they perform.

6. Housekeeping - Keep project site in a clean, neat, and safe condition at all times.

7. All workers under Contractor’s employ will wear all required Personal Protective Equipment (PPE) including hard hat, eye protection, hearing protection, and sturdy work boots. Gloves shall fit tight to the wrist, no “gauntlet style” gloves shall be worn during chipping operations.

8. The Contractor is responsible for all traffic and pedestrian control, including but not limited to signage, and or flagger when working on or adjacent to on roads, or sidewalks. Designated flaggers are required when working over a road and sidewalks.

9. The Contractor shall comply in rectifying all unsafe or unhealthy conditions called to his/her attention by the COR.

10. The Contractor shall allow for formal or informal, announced, or unannounced, safety inspections at the worksite.

11. All tools and equipment used on any project must meet all OSHA regulations.

12. There will be no smoking in or around any building, smoking will be permitted only in designated areas.

13. Drug and alcohol use while on the site will not be tolerated, Contractor shall ensure no workers are under the influence during work hours on the site.

14. Contractor shall decide if possible respiratory protection from silica is a requirement for this work, by referencing any Federal and State OSHA requirements

13. PROTECTION OF PARK PROPERTY:

a) Work must be completed without damage to any landscape features or resources, such as earthworks, monuments, grave markers, walls, fences, irrigation, signage, road, trails, pathways, trees not to be removed, or other property. The Contractor will be financially liable to the park for any costs incurred because of repairing and/or replacing any of the aforementioned items or for the value of the item as assessed by a qualified NPS resource specialist.

b) Operations resulting in depressions in the soil greater than ½ inch shall cease until conditions change or a plan to mitigate for the damage is agreed upon with the COR. Skidding of logs will not be permitted. No work shall be allowed for at least a 24-hour period following a rain accumulation of one-quarter (1/4) inch or more during the proceeding 24-hour period. After any work stoppage, it will be the responsibility of the COR to determine when work may re-commence. CO, COR, and Contractor will coordinate together on any extension of time in the period of performance lost due to any unforeseen work stoppage.

c) All vehicles and other heavy equipment involved in the completion of this contract will be restricted to roads, parking areas, and road shoulders unless given case-specific permission by the COR.

d) All vehicles should be equipped with absorptive pads while on park property in order to quickly contain any spills of fuel, oil, or hydraulic fluid. Immediate action shall be taken by the Contractor and/or their workers on site to contain, absorb, and/or clean up any spills of equipment fluids or other possibly toxic substances. Any such spills must be reported to the COR as soon as is safely possible who will in turn notify the park Safety Officer and Facility Manager.

14. Sequencing/Scheduling:

During masonry wall work, closures will be along only one wall at a time and extending no further than halfway into a portion of the roadway will be permissible. The roadway is two lanes wide but only allows one-way traffic. Closures along one wall at a time and extending only into a portion of the roadway will still allow enough distance for vehicular traffic to pass on opposite sides safely. Contractor shall this is followed and propose their plan for accomplishing this requirement and " must comply with all Federal and State OSHA requirements".

IV. QUALIFICATIONS. Offeror must submit with proposal a list of five similar projects successfully completed by the staff proposed for use in this project.

V. BID FORMAT

I. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

II. Product Information: Include the following, as applicable:

1. Product name and model number.

2. Manufacturer's name.

3. Color, pattern, and texture.

4. Material and chemical composition.

5. Reordering information for specially manufactured products.

A. Required Submittals:

a. Designation letter and description of qualifications of Superintendent.

b. Designation letter and description of qualifications of Assistant Superintendent.

c. Schedule of Values

d. Accident Prevention / Safety Plan

e. Work Schedule

f. Coordination Meeting Summary Report

g. Landscape Protection Plan including shop drawing attachment

h. Implementation Plan

i. Qualification Proposal stating and showing where they completed work on similar masonry and projects – 2 previous projects are required at a minimum

j. Mortar mix, color sample and sand proposed for mortar repointing.

k. Cleaning Materials for wall - (Manufacturer and Product Literature)

l. Limestone replacements- (Manufacturer and Product Literature)

m. Moisture Barrier - (Manufacturer and Product Literature)

n. Drainage Mat - (Manufacturer and Product Literature)

o. Rigid Fiberboard - (Manufacturer and Product Literature)

p. Traffic Control Plan

q. Provide a Quality Control Plan

i. The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which they assure themselves that their work complies with the requirement of the contract.

r. Warranty: The contractor shall provide 12-month warranty to start upon date of final invoice that covers all painted finishes that the contractor must correct at no additional cost any discrepancies of workmanship, or color fading caused by product or application.

B. Bid format:

1. Cost for labor, materials, disposal and other fees broken down by CLIN

2. Statement on bid form that all components meet or exceed the specifications contained in this statement of work.

3. Applicable taxes.

4. Statement of numbers of on-site days needed to do the work.

5. Submit qualifications (described above.)

IV. PROJECT SCHEDULE

A. The Contractor shall coordinate work with the Contracting Officer or his/her designated representative. Contractor shall provide the government 5-days advance notice of when work is to begin. Work on Saturday and Sunday or federal holidays will not be allowed without the approval of the Contracting Officer or the COR.

B. Period of Performance: Work shall be completed within 60 days of issuance of the notice to proceed. The Contractor must work around any and all special events at Fort Donelson National Battlefield. The contractor must stop work and not continue again until the special event is finished.

C. On-site period of performance: The Contractor must schedule the work so that is does not coincide with special events (check with COR) at Fort Donelson National Battlefield. Once mobilized on site, the contractor must work continuously until the project is complete.

V. INSPECTIONS

A. The Government will conduct inspection upon completion of project work. Final payment will not be made until all noted discrepancies are corrected by the contractor.

VI. CONTRACTOR PAYMENT SCHEDULE.

A. A single invoice based on completion and acceptance of the work.

VII. PROJECT COORDINATION. The NPS Contractor Officer’s Representative and Project Manager for this action is:

Craig K Davis, FMP Chief of Facilities, Fort Donelson National Battlefield 174 National Cemetery Drive Dover, TN 37058 931-627-0569 Craig_K_Davis@nps.gov

A. Note: All communication shall be routed through the above names, unless other people are authorized by the COR for the project. If additional staff are authorized by the COR, they will send out an email announcing such action to all parties involved. COR shall be included in all communications, preferably from the beginning of the conversation. Nothing is approved or changed without the KO or CORs approval.

I. If any actions are done without KO or COR prior approval the park employee and contractor are putting themselves at risk.

B. Daily reports shall be submitted daily. A sample Daily Reporting Form is provided in Attachment A. Project management submittals will be submitted and approved as indicated on the Transmittal Register. Product submittals will be approved in advance of procurement and installation.

VIII. ADDRESS FOR INVOICES. Provided in the contract award documents.

End of Statement of Work

Attachment A NPS Daily Progress Report Form

Attachment B – Photos of Area

2 | Page image4.png image5.png image6.png image7.png image8.png image9.png image1.wmf image2.png image3.png

File details come from the government source that posted it. Updated .