This document is a Statement of Work (SOW) for the construction of a 2.46-mile native surface, single-lane road with turnouts for logging purposes on behalf of the U.S. Department of Agriculture (USDA) Forest Service.

The SOW provides details on the scope of work, which includes constructing the new road according to the provided plans and specifications. The contractor is required to have a minimum of 5 years of experience operating equipment and building native surface roads in high elevation mountainous conditions. The key deliverable is a monthly status report, and no travel is required. There are no government-furnished items, security requirements, data rights, or Section 508 considerations. The related federal contract opportunity, solicitation number 1240LT24Q0066, is for the construction of this 2.46-mile road.

View the file

Other files

File Type Posted
Wage Determination Rio Grande County Colorado.pdf PDF
Specifications.docx DOCX document
Five_Below TS Road Const drawings SIGNED.pdf PDF
1240LT24Q0066.pdf PDF
SOI five below road construction.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Government Furnished3
5.0 Deliverables / Schedule3
6.0 Travel3
7.0 Contractor’s Key Personnel3
8.0 Security Requirements3
9.0 Data Rights3
10.0 Section 508 – Electronic and Information Technology Standards3
Attachment3

Project Five Below Road Construction

General Information

1.0 Scope of Work

Provide a brief statement of the overall project, including goals and objectives.

Construction of 2.46 miles of a new road. The road will be native surface and single lane constructed, with some turnouts, for logging purposes.

2.0 Background

Construction of new road to access timber for removal. The area is currently forested primarily with aspen trees. Downed trees (logs) are present along construction route. This project is constructing a new road to provide access for timber and fuels treatments.

Contractor Requirements

3.0 Technical Requirements / Tasks

The p-line will be flagged by the government and the contractor shall construct a new native material roadway with some turnouts per the FP-14, the plans, and specifications.

4.0 Government Furnished

Not Applicable.

5.0 Deliverables / Schedule

Key Deliverables

Item No.
Deliverable / Item Title
Description
Frequency
Delivery Format
Due By
1
Monthly Status Report
Monthly report documenting tasks and issues identified during the month
Once per month
Via email to COR
The 5th day of each month after contract award

6.0 Travel

Not applicable.

7.0 Contractor’s Key Personnel

The contractor shall identify the point of contact for field work. The point of contact and the equipment operators shall have a minimum of 5 years of operating equipment with additional experience building native surface roads and working in high elevation mountainous conditions.

8.0 Security Requirements

Not applicable

9.0 Data Rights

Not applicable

10.0 Section 508 – Electronic and Information Technology Standards Not applicable

Attachment Plans and specifications are attached.

image1.png

File details come from the government source that posted it. Updated .