SOW five below.docx
DOCX document 51 KB Posted
- Attached to
- Five Below Road Construction
- Solicitation number
- 1240LT24Q0066
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for the construction of a 2.46-mile native surface, single-lane road with turnouts for logging purposes on behalf of the U.S. Department of Agriculture (USDA) Forest Service.
The SOW provides details on the scope of work, which includes constructing the new road according to the provided plans and specifications. The contractor is required to have a minimum of 5 years of experience operating equipment and building native surface roads in high elevation mountainous conditions. The key deliverable is a monthly status report, and no travel is required. There are no government-furnished items, security requirements, data rights, or Section 508 considerations. The related federal contract opportunity, solicitation number 1240LT24Q0066, is for the construction of this 2.46-mile road.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination Rio Grande County Colorado.pdf | ||
| Specifications.docx | DOCX document | |
| Five_Below TS Road Const drawings SIGNED.pdf | ||
| 1240LT24Q0066.pdf | ||
| SOI five below road construction.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 3 |
| 5.0 Deliverables / Schedule | 3 |
| 6.0 Travel | 3 |
| 7.0 Contractor’s Key Personnel | 3 |
| 8.0 Security Requirements | 3 |
| 9.0 Data Rights | 3 |
| 10.0 Section 508 – Electronic and Information Technology Standards | 3 |
| Attachment | 3 |
Project Five Below Road Construction
General Information
1.0 Scope of Work
Provide a brief statement of the overall project, including goals and objectives.
Construction of 2.46 miles of a new road. The road will be native surface and single lane constructed, with some turnouts, for logging purposes.
2.0 Background
Construction of new road to access timber for removal. The area is currently forested primarily with aspen trees. Downed trees (logs) are present along construction route. This project is constructing a new road to provide access for timber and fuels treatments.
Contractor Requirements
3.0 Technical Requirements / Tasks
The p-line will be flagged by the government and the contractor shall construct a new native material roadway with some turnouts per the FP-14, the plans, and specifications.
4.0 Government Furnished
Not Applicable.
5.0 Deliverables / Schedule
Key Deliverables
| Item No. |
| Deliverable / Item Title |
| Description |
| Frequency |
| Delivery Format |
| Due By |
| 1 |
| Monthly Status Report |
| Monthly report documenting tasks and issues identified during the month |
| Once per month |
| Via email to COR |
| The 5th day of each month after contract award |
6.0 Travel
Not applicable.
7.0 Contractor’s Key Personnel
The contractor shall identify the point of contact for field work. The point of contact and the equipment operators shall have a minimum of 5 years of operating equipment with additional experience building native surface roads and working in high elevation mountainous conditions.
8.0 Security Requirements
Not applicable
9.0 Data Rights
Not applicable
10.0 Section 508 – Electronic and Information Technology Standards Not applicable
Attachment Plans and specifications are attached.