This Statement of Work outlines a construction project at the Detroit Fisher House to remove and replace existing sidewalks, catch basins, gutters, curbing, and add landscaping along Bethune Street. The project is divided into two phases: Phase 1 involves removing/replacing 1,500 sqft of damaged sidewalk and adding 180 sqft of new sidewalk at the Fisher House entry, while Phase 2 includes replacing 220 LF of curbing/gutter/catch basins, expanding the irrigation system, adding green space, and planting six Bosque Elm canopy trees.
The technical specifications require 6" thick 3500# concrete with control joints doweled into adjoining slabs using NO. 13 (½") bar, all work meeting City of Detroit D.P.W. standards. The landscaping portion requires 6" depth topsoil, new irrigation lines tied to existing system, and 4" riser pop-up spray heads. The contractor must install safety fencing, coordinate with the City of Detroit, obtain necessary permits, and complete all work within 45 calendar days after Notice to Proceed. Work hours are restricted to 7:00am-4:30pm Monday through Friday. This SOW is associated with VA solicitation 36C77625Q0115, which has an estimated value between $100,000-$250,000 and is planned for advertising in March 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77625Q0115.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Fisher House Sitework, Detroit, MI
Description of Work
The construction project will remove and replace existing sidewalk, catch basins, gutter, curbing, and provide landscaping along Bethune Street at the Detroit Fisher House as described below. It is anticipated that the work will be broken up into two (2) phases. Phase one will remove and replace fifteen hundred (1500) sqft of damaged sidewalk along Bethune Street and add one hundred eighty
(180) sqft of new sidewalk at the Fisher House entry. Phase two will remove and replace two hundred twenty (220) LF of curbing, gutter, and catch basins, tie into, and expand on the existing irrigation system, add green space, and plant six (6) new Trees. The contractor is responsible for installing safety fencing to keep pedestrian and automobile traffic out of work site, coordinating all work with the City of Detroit, and obtaining all city permitting for the satisfactory completion of all work. Work shall be performed during the hours of 7:00am – 4:30pm Monday through Friday located at John D. Dingell VA Fisher House, Detroit, Michigan. All work shall be completed within forty-five
(45) calendar days after receipt of Notice to Proceed.
Remove and Replace Existing Sidewalk(s):
Existing sidewalk concrete shall be replaced in accordance with design specifications, and city of Detroit engineering division D.P.W standards and details. Remove and replace concrete as described below.
Remove existing concrete, haul off site, and dispose of as required by local law. Recycle concrete as much as possible.
Install new concrete sidewalk in area(s) shown in drawings. Concrete will be 6” thick 3500# with control joints and will be doweled into the adjoining slabs at 12” o.c. using NO. 13 (½” ) bar, broom finished to match adjoining surfaces in accordance with city of Detroit engineering division D.P.W standards and details. Construction areas shall remain barricaded and fenced off until area is cured properly and can support foot traffic.
Addition of New Sidewalk(s):
Install new concrete sidewalk in area(s) shown in drawings. Concrete will be 6” thick 3500# with control joints and will be doweled into the adjoining slabs at 12” o.c. using NO. 13 (½” ) bar, broom finished to match adjoining surfaces in accordance with city of Detroit engineering division D.P.W standards and details. Construction areas shall remain barricaded and fenced off until area is cured properly and can support foot traffic.
Remove and Replace Existing Curbing and Gutter:
Remove and replace curbing and gutter in accordance with design specifications, and city of Detroit engineering division D.P.W standards and details. Remove and replace concrete as described below.
Remove existing concrete, haul off site, and dispose of as required by local law. Recycle concrete as much as possible.
Install new integral concrete curbing and gutter in areas shown on drawings. Concrete curb shall
Draf t meet the city of Detroit city engineering division, D.P.W. standard plan for standard curb details, doweled into the adjoining slabs at using NO 13 (½”) bar. Finish concrete surface to match adjoining curb surfaces. Construction areas shall remain barricaded and fenced off until area is cured properly and can support foot traffic.
Landscaping:
Prepare green space for new sod, six (6”) inch depth, topsoil, new irrigation lines and tie-in to existing, pop-up spray heads four (4) inch riser, and six (6) Bosque Elm canopy trees to match existing.
Remove excess spoils, haul off site, and dispose of as required in accordance with Federal, State, and local law.