STATEMENT OF WORK
Fire Truck Repair
174TH ATTACK WING
6001 E.MOLLOY RD
SYRACUSE, NEW YORK 13211
LOCATED ON
HANCOCK FIELD ANG
22 Sep 2021
Table of contents
1. SCOPE OF WORK
2. AREA OF WORK
3. DESCRIPTION OF WORK
4. PERIOD OF PERFORMANCE
5. MATERIALS
6. GOVERNMENT WORKING HOURS
7. DISPOSAL OF MATERIALS AND CLEANUP
8. SECURITY
1. SCOPE OF WORK:
The contractor shall provide all equipment, tools, materials, supervision, and services necessary to complete the work as described in this Statement of Work (SOW). Work location is at the vendor’s place of business. Transportation will be provided by unit personnel within a thirty (30) mile radius of Hancock field Syracuse New York. One site visit will be arranged by base contracting to evaluate the damage. Each participating vendor will submit one estimate without physical contact of any kind to the vehicle; supplements will not be accepted or authorized.
2. AREA OF WORK:
Contractor shall work only on the areas of the vehicle described in this statement of work.
3. DESCRIPTION OF WORK:
The work specified by this section consists of furnishing all labor, equipment, tools, appliances, transportation, materials, and quality control reports required to repair the fire pumping system on a 2013 Kovatch Mobile Equipment (KME) Rapid Intervention Vehicle (RIV P-34) registration# 13C00052, to include but not limited to the following:
· Rebuild pumps with new components, as needed.
· Repair Oil Leak (Fitting) On Reservoir.
· Install Repaired Pumps On Gear Case In Truck.
· Fill And Top Off All Fluids Necessary On Pump And Engine.
· Install Proper Pressure Gauges.
· Run Pump and Check for Proper Pressure Settings.
· Install All Foam System Parts That Were Move For Access.
· Test The Foam System.
· Replace Air Compressor Needed To Operate Air Controlled Valves.
| 4. | PERIOD OF PERFORMANCE: |
| Contractor shall complete all work within 90 calendar days. |
5. MATERIALS:
Replacement parts must be OEM when available and all other materials must meet or exceed OEM specifications.
6. GOVERNMENT WORKING HOURS:
Pickup and delivery hours will Mon-Thurs. 0600-1630 based on available personnel, with the exception of scheduled down Fridays and Federal holidays.
7. DISPOSAL OF MATERIALS AND CLEANUP:
Contractor is responsible to properly dispose of any hazardous waste generated performing contract duties.
8. SECURITY:
Contractor will be responsible for fire truck and contents while in their care and custody to include theft, vandalism or any other damage.