SOW - Fire Bldg Inspection.pdf

PDF 89 KB Posted

Attached to
Fire Training Buildings Inspection Federal contract opportunity
Solicitation number
FA480125Q0017
Issued by
Department of the Air Force Air Combat Command

About this file

This Statement of Work (SOW) details an inspection project for two fire training buildings located at Holloman Air Force Base in New Mexico. The contractor is required to conduct a comprehensive inspection of Building 1 and Building 2, specifically following NFPA 1403 - Standard on Live Fire Training Evolutions, and must employ a licensed professional engineer with specialized live fire training structure experience. The inspection must be completed within a 120-day performance period, with the final deliverable being an electronic PDF inspection report submitted to the CE Project Manager.

The solicitation is issued by the Department of the Air Force Air Combat Command under solicitation number FA480125Q0017, with the primary objective of ensuring the safety and compliance of fire training facilities through professional structural assessment. The document specifies that pictures of both buildings are attached to the SOW, and emphasizes the technical expertise required for conducting the inspection, highlighting the specialized nature of the contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Training Buildings Inspection, newest first.
File Type Posted
Bldg 1 As-Built Drawings 3.pdf PDF
Bldg 1 As-Built Drawings 1.pdf PDF
Bldg 1 As-Built Drawings 2.pdf PDF
Solicitation - FA480125Q0017.pdf PDF
Bldg 2 Picture - A.pdf PDF
Bldg 2 Picture - B.pdf PDF
Bldg 1 Pictures.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

INSPECT FIRE TRAINING BUILDINGS

March 19, 2025

1. The Contractor shall inspect two (2) fire training buildings at Holloman AFB, NM. The buildings shall be referred to as Building 1 and Building 2.

2. Pictures of both buildings are attached.

3. The inspection shall be completed in accordance with NFPA 1403 - Standard on Live Fire Training Evolutions. The inspection shall be conducted by a licensed professional engineer with live fire training structure experience.

4. Submit an electronic PDF inspection report to the CE Project Manager.

5. The Period of Performance is 120 days.

-----END-----

File details come from the government source that posted it. Updated .