This Scope of Work details a project to upgrade the fire alarm system at the VA Portland Healthcare System's Vancouver campus. The project involves transitioning from an Edwards EST-3 Fire Alarm system installed in 2003 to an EST-4 system with voice capabilities. Key elements include completing a campus fiber loop, installing main control equipment in building 3's boiler plant, implementing new Fire Alarm Control Panels (FACPs) in existing and new locations, and adding building annunciator panels. The primary objective is to upgrade the current temporal horn notification system to a speaker-based voice control system with Emergency Voice/Alarm Communication (EVAC) capabilities, ensuring compliance with NFPA 72-2022 standards. The project requires careful sequential migration of buildings, with strict requirements to avoid simultaneous operation of old and new systems and to prioritize transitioning all fire alarm notifications to the new EST4 system as quickly as possible.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26023N0282_-_Upgrade_Vancouver_Fire_Alarm_to_Voice_-_100__CD_-_Specifications_8-8-25.pdf | ||
| 36C26023N0282_-_Upgrade_Vancouver_Fire_Alarm_to_Voice_-_100__CD_-_Drawings_8-8-2025.pdf | ||
| 36C26026R0034 SOURCES SOUGHT 11-13-25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
648-23-100 Upgrade Vancouver Fire Alarm to Voice
Scope of work
This project will require site investigation, construction activities, labor, materials, equipment, programming, training, commissioning and scheduling to Upgrade Vancouver Fire Alarm to Voice at the VA Portland Healthcare System, Vancouver campus. The specific detailed information and requirements are shown on the drawings, specifications and as follows:
This project will upgrade the fire alarm system on the Vancouver campus to modernize to a voice system. Edwards EST-3 Fire Alarm system installed in 2003.
• Upgrade Vancouver Campus fire alarm system to EST-4 and add voice.
o Including, but not limited to;
Completing the campus fiber loop in a duct bank
• Test network before integration Main control equipment installation
• Main control equipment shall be located at building 3 boiler plant
• FACP with integrated Network Voice Command
• FireWorks Station Computer, UL listed, with a built-in network card
• Two monitors and printer
• Cellular digital alarm transmitter
New FACPs in existing and non-existing locations.
• New building annunciator panels
• New power supply circuits, local disconnects, and distribution panels
• New strobe power control equipment
Installation in Bldg. T1819 Upgrading all existing annunciators and panels Sequential migration of buildings Campus-wide synchronization Programming Commissiong
• The primary objective of this project is to upgrade the existing temporal horn notification system to a speaker-based voice control system that incorporates Emergency Voice/Alarm Communication (EVAC) capabilities. For buildings that currently lack fire alarm coverage, new initiating devices have been designed for installation as required. Smoke detection will also be placed as required by NFPA 72-2022 10.4.5 o each fire alarm control unit, o each notification appliance circuit power extender, o the supervising station transmitting equipment.
• At no point during construction will both the old and new fire alarm systems simultaneously drive notification in the same area, and that all occupant notification will be handled by a single system at any given time.
• There shall be no instances where notification is handled concurrently by the existing and new systems during construction.
• Redundant initiating devices in areas where both systems are installed must have the non-operational devices covered and clearly labeled as "Not in Service."
• The construction schedule must prioritize transitioning all fire alarm notification to the new EST4 system as early as feasible. Subsequent system installations, demolition, and patching activities will proceed in a manner, aligned with the specific requirements of individual buildings and smoke compartments.