SOW_FG_PP_Sewer_Pumping_Servicess.pdf

PDF 159 KB Posted

Attached to
FG POWERPLANT SEWER PUMPING Federal contract opportunity
Solicitation number
140R4024Q0012
Issued by
Department of the Interior Bureau of Reclamation

About this file

This statement of work outlines sewer pumping services required at Flaming Gorge Dam. The U.S. Bureau of Reclamation's Flaming Gorge Field Division requires pumping of an 18,000 gallon sewer holding tank located at the bottom of the dam every two to three weeks, more frequently than normal operations. The contractor must provide all equipment and labor to pump and dispose of sewage, arranging disposal at nearby Forest Service or county facilities. The contractor must respond within 72 hours of a request from Reclamation and coordinate arrival times. Work hours are from 7am to 5pm Monday through Thursday unless approved otherwise. The solicitation includes a six-month base period and six-month option period priced at a fixed unit cost per pumping. Solicitation number 140R4024Q0012 was issued by the Department of the Interior Bureau of Reclamation for sewer pumping services at the Flaming Gorge Powerplant.

View the file

Other files for this federal contract opportunity

Other files attached to FG POWERPLANT SEWER PUMPING, newest first.
File Type Posted
Wage_rate_for__Daggett__County.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 140R4024Q0012

U.S. Bureau of Reclamation

Statement of Work

Flaming Gorge Field Division

Sewer Pumping Services

Introduction

The Flaming Gorge Field Division of the U.S. Bureau of Reclamation has a requirement for sewer pumping services. Flaming Gorge Dam has a sewer holding tank located at the bottom of the dam, outside the powerplant. The holding tank under normal operations requires pumping every 3 to 6 months. Due to an unknown issue the holding tank is filling every two to three weeks. The estimated period of service is a six-month base period with a six-month option period. Flaming Gorge Dam is located 45 miles NE of Vernal, Utah on Hwy 191.

Requirement

A. The Contractor shall provide all equipment and labor to pump and dispose of sewer in the holding tank located at the bottom of the Flaming Gorge Dam. The sewer holding tank capacity is 18,000 gallons.

B. Sewer disposal will be arranged by Contractor. There are two possible dumping locations located near the dam. Contractor will need to contact the Forest Service, Point of Contact Brett Heath 435-896-7132, and/or Daggett County. Point of contact Trevor Brooksby 435-823-5579, about the possibility of dumping at their facilities. Contractor will follow all regulations and certificates that are required.

C. The Contractor shall respond to a request for pumping within 72 hours after the Reclamation request pumping services.

D. Once Reclamation has requested services, the Contractor shall coordinate with Contracting Officers Representative to arrange estimated arrival time frame. Contractor shall check in at Visitor Center Offices located at the top of the Dam where an escort will meet them and then proceed to the bottom of the Dam.

E. All work to be performed by the vendor shall take place between the hours of 7:00 am and 5:00 pm, Monday-Thursday. Work by the vendor outside of these hours must have prior approval of the Contracting Officer.

Solicitation 140R4024Q0012

CLIN Description Fixed Unit Cost per Pumping quantity Total

0010 Option period 12/15/2023- 6/14/2024

0020 6/15- 12/14/2024

Total firm fixed price