SOW FD20302400458 CAO 04Jun2024.pdf

PDF 318 KB Posted

Attached to
F110 FDT Temperature Sensors
Solicitation number
FA812224Q0006
Issued by

About this file

This document is a Statement of Work (SOW) for the remanufacture of F110-100 and F118-100 FDT Sensors. The SOW defines the requirements for the contractor to ensure the delivered remanufactured sensors meet the original life expectancy consistent with Air Force requirements. Key details include:

The contractor shall maintain a quality control/quality assurance plan, manage subcontractors and vendors, comply with safety and reporting requirements, and ensure proper receiving, inspection, remanufacturing, packaging, handling, and shipping processes are followed. The contractor shall use Government Furnished Property (GFP) provided on a one-to-one basis to remanufacture the sensors. The Government reserves the right to witness any testing conducted by the contractor. The contractor shall obtain written approval from the Procuring Contracting Officer for all Designated Engineering Representative manufacturing processes and procedures prior to use. The SOW also includes details on reference manuals, Government Furnished Material (GFM), and related acronyms.

View the file

Other files

File Type Posted
FA812224Q0006 0003.pdf PDF
FA812224Q0006 0002.pdf PDF
FA812224Q0006 0001.pdf PDF
DID_80969.pdf PDF
DID_80503.pdf PDF
DID_81535B.pdf PDF
DID_80441D.pdf PDF
Transportation_Data.pdf PDF
ItemDescription.pdf PDF
DID_81832.pdf PDF
SYNOPSIS SOLICITATION COMBO FA812224Q0006.pdf PDF
Packaging_Requirements.pdf PDF
CDRL_REPORT.pdf PDF
DID_81995A.pdf PDF
DID_81838.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD20302400458

STATEMENT OF WORK

(SOW) Fll0-100, F118-100 FDT

Sensors

PURCHASE REQUEST NUMBER: FD20302400458

PREPARATION DATE: 25 October 2023

Version 3

PREPARING ORGANIZATION:

421st Supply Chain Management Squadron (SCMS)/GUMCA

Oklahoma Air Logistics Center And

Air Force Life Cycle Management Center (AFLCMC) Fl10 Technical Services Element (LPSBBB)

TINKER AFB, OK 73145-3031

TABLE OF CONTENTS Page

SECTION I 3

1.0 Work Scope 3

1.1 SOW Updates 3

1.2 Quality System and Quality Assurance Plan 3

1.3 Subcontractor and Vendor Management 4

1.4 Safety 4

1.5 General Services and Material 4

1.6 Reporting 4

1.6.1 Condemnation of Assets 5

1.7 Receiving 5

1.7.1 Condemnation of assets 5

1.7.2 Deliverables Quality 6

1.7.3 Remanufacture 6

1.7.4 Remanufacture Procedures 6

1.7.5 Deliverable Quality 7

1.7.6 Designated Engineering Representative (DER) processes and procedures 7

1.8 Packaging and Handling 7

1.9 Shipping and Transportation 7

1.10 Document Storage 7

SECTION II 7

2.0 Reference & Technical Manuals 7

SECTION III 8

3.0 Requirements 8

3.1 Government Furnished Material (GFM) 8

3.2 Government Furnished Property (GFP) 8

APPENDIX A 9

Acronyms 9

ATTC 1 CAV Statement of Work 10 ATTC 2 SURGE Statement 17 ATTC 3 Supply Chain Risk Management 18

SECTION 1

1.0 WORK SCOPE:

This Statement of Work (SOW) defines the requirements necessary to ensure that delivered remanufactured F110-100, F118 -100 FDT Sensors are remanufactured as nearly as possible to original life expectancy consistent with Air Force (AF) requirements set forth herein. This SOW applies to the following National Stock Numbers (NSN) and Part Numbers (P/N):

Input P/N Input NSN Output P/N Output NSN

1269M86P01/ 2915-01-191-1818PR 1269M86P02 2915-01-485-7506PR

8901-276

1269M86P02 2915-01-485-7506PR 1269M86P02 2915-01-485-7506PR

8901-277

The sub NSN and P/N 1269M86P01 (8901-276) shall be remanufactured to NSN 2915-01-485- 7506PR, P/N 1269M86P02 (8901-277). The instructions stipulated are brief, concise statements providing general requirements for delivered remanufactured F110-100, F118-100 FDT Sensors.

All performance, with respect to the delivered remanufactured F110-100, F118-100 FDT Sensors and component parts shall be performed at a contractor owned or operated facility that performs remanufacture using manufacturing processes similar to those used in the manufacture of F110- 100, F118- 100 FDT Sensors. Contractor shall have remanufacture capabilities to include required technical data, repair documents, and license agreements to accomplish remanufacture of F110-100, F118 -100 FDT Sensors strictly in accordance with Government requirements and scheduled delivery of a quality product.

1.1 SOW Updates:

The Contractor shall not make any changes to the requirements in this SOW without written approval of the Procurement Contracting Officer (PCO). Contractor recommended changes shall be in writing (email is acceptable), but the Government shall maintain the SOW during the performance of this contract and ensure all changes are necessary and consistent with the requirement of FAR 22.1003-6(a)(1) prior to approval and performance.

1.2 Quality System and Quality Assurance Plan:

The contractor shall develop, implement, and maintain an integrated Quality Control (QC)/Quality Assurance (QA) plan for the purpose of providing and maintaining confidence in contractor performance, product delivery, and data integrity throughout the life of the contract.

Quality shall be ensured throughout the program in all areas of remanufacture, assembly inspection testing, and shipping.

The QC/QA plan shall be developed IAW AFPD 63-5, Quality Assurance and AFI63-501, Air Force Acquisition Quality Program, or an ISO 9001:2000/ANSI ASQC Q92 or equivalent requirements certified plan to ensure quality across all aspects of the remanufacturing processes used, product assurance, reliability, maintainability, and supportability.

The Air Force reserves the right to verify the effectiveness of the QA program through reviews and audits of work in progress at the Contractor owned or operated facilities.

1.3 Subcontractor and Vendor Management:

The Contractor shall maintain a system for the management of subcontractors and vendors IAW the provisions of this contract. The Contractor shall ensure that the subcontractor(s)/vendor(s) manufacturing processes, data, designs, and deliverables meet all F110-100, F118-100 FDT Sensors engineering, and technical requirements arc in accordance with this SOW and shall fulfill the requirements of this contract and FAR 22. 1003-6(a)(I). The Government personnel shall be provided the opportunity to attend all subcontractor reviews and other problem-solving reviews as observers to ensure compliance with this SOW and FAR 22.1003-6(a) (I).

1.4 Safety:

The Contractor shall maintain and execute a safety program using MIL-STD-882D, AFI 91-202 and AFI 91-204 as guides. The Contractor shall comply with all safety provisions and technical specifications listed in OEM shop maintenance manuals. All Contractor personnel and technicians shall comply with system safety engineering principles during all levels of remanufacturing.

While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the PCO within eight (8) hours of any damage to GFP where the dollar value exceeds $500,000.00 and within two workdays, for any damage to GFP less than $500,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information If requested by the designated PCO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

1.5 General Services and Material:

The Contactor shall provide all materials for the manufacturing processes required to execute this contract, however pooling of hardware is acceptable. In exchange, in part, for each remanufactured F110-100, F118-100 FDT Sensor ordered, the Government will provide, on a one to one basis, degraded or inoperable GFP F110-100, F118-100 FDT Sensors free of meaningful damage inconsistent with aircraft engine usage.

1.6 Reporting:

The Contractor shall meet the delivery schedule. The Contractor shall ensure that all reporting as specified under the following CDRL(s) is accomplished:

A001 - DI-MGMT-80441D – Government Property Inventory Report A002 - DI-MGMT-80503 - Report of Shipping (Item) and Packing Discrepancy A003 - DI-MGMT- 81838 - Commercial Asset Visibility Air Force (CAVAF) Reporting A004 - DI-PSSS-81535B - Acquisition and Sustainment Data Package (ASDP) Deficiency Report

(DR)

A005 - DI-PSSS-81995A – Contract Depot Maintenance (CDM) Monthly Production Report A006 - DI-MISC-81832 - Counterfeit Prevention Program A007 - DI-MGMT-80969 - Production Surge Plan

A001: The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.

A002: Contractor will use WEBSDR to submit an electronic SF-364 (Standard Form) IAW TO 00-35D-54 upon discovery of discrepancies for items of supply received for: overage, wrong item, duplication of shipment, misdirected shipment, nonreceipt, damage, and/or improperly packaged shipment.

A003: Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document. Data shall be current within 24 hours of the last End Item maintenance occurrence.

A004: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

A005: The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995A) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

A006: The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award. (FA8122).

A007: In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.

CEMS system info/POC:

AFLCMC/LPSC

Bldg 4008 Room 12 Tinker AFB, Ok. 73145 Email: CEMS.PMO.helpdesk@us.af.mil

1.7 Receiving:

The Contractor shall inspect scheduled incoming sensors for missing parts, any damage associated with improper handling and shipping, and damage other than normal failures. For sensors with missing parts or damage, the Contractor shall provide the PCO, PM and PMS with the estimated parts list required for the remanufacture and submit an SDR (SOW par 1.6.3). The contractor shall contact the PCO, PM and PMS for disposition instructions within 2 days of receipt (email is acceptable). The Contractor shall not destroy reusable shipping containers and will reuse them for return shipment. The contractor shall submit Supply Discrepancy Reports (SDRs) related to shipment of misidentified items, variations in quantity, lost or damaged parcel post, and meaningful damage to GFP inconsistent with aircraft engine usage.

These discrepancies shall be reported and resolved using the DoD web-based application mailto:CEMS.PMO.helpdesk@us.af.mil

WebSDR https://www.daas.dla.mil/websdr/home.asp. This system of reporting an SDR has been developed in compliance with DoD regulations 4140. l-R Supply Chain Material Management Regulation and 4000.25-M, Defense Logistics Management System (DLMS) Supply Standards and Procedures, which requires automated SOR processing. The Government's Prime Packaging Specialist may authorize exceptions to these requirements.

1.7.1 Condemnation of Assets:

An asset is considered condemned when the cost to repair or remanufacture exceeds 75% of the current stock listed price. The Contractor shall provide in writing to the Production Management Specialist items proposed for condemnation at the Contractor’s facility, including any and all component parts that do not meet ESM “Serviceable Limits” or Build Policy life cycle limits, before those components lose their identities as GFP and become contractor property. The Production Manager will forward this information to the cognizant Engineer for his concurrence on proposed condemnations. Once approved, the Contractor shall process all condemned assets through Plant Clearance Automated Reutilization Screening System (PCARSS). The Contractor shall also provide to the Government condemnation report to 421 SCMS/GUMC, to establish usage rates and cost planning by reporting quantities by P/N and NSN, as well as the reason for condemnation, of reparable components condemned and annotate monthly on Contract Depot Maintenance (CDM) Production Report IAW CDRL (A002) - DID DI-PSSS-81995 and Commercial Asset Visibility Air Force (CAVAF) Reporting Requirements IAW CDRL (A001) -

DID DI-MGMT-81634C AND ON ATTACHMENT 1 OF THIS SOW.

1.7.2 Supply Discrepancy Report (SDR):

The Contractor shall submit SDRs when required IAW Technical Order (TO) 00-35D-54 and CAVAF End Item Reporting.

1.7.3 Remanufacture

Remanufactured F110-100, F118-100 FDT Sensors shall be restored to original life expectancy or nearly so, in compliance with all applicable OEM technical repair procedures, manufacturing specifications, and OEM Engineering approved rework drawings/procedures. The production output should meet or exceed the United States Air Force (USAF) build requirements found in F110-GE-100, F118-100: 5E6-3-112-3. Contractor shall identify all Military F110-100, F118- 100 FDT Sensors processed through contractors remanufacture facility as Military Parts prior to processing.

1.7.4 Remanufacture Procedures:

F110-100, F118-100 FDT Sensors shall be remanufactured IAW the procedures outlined in accordance with Original Equipment Manufacturers (OEM) tech data. All component parts will be inspected for acceptance and reused if within tolerance in lieu of rework, rehabilitation, alter or replacement. Delivered remanufactured F110-100, F118-100 FDT Sensors shall contain remanufactured hardware or new parts meeting the requirements of this SOW. The Contractor shall inspect remanufactured and new components to ensure that they meet United States Air Force (USAF) build requirements.

http://www.daas.dla.mil/websdr/home.asp http://www.daas.dla.mil/websdr/home.asp http://www.daas.dla.mil/websdr/home.asp

Contractor shall acquire component parts from Air Force approved vendors, Government inventory; Original Equipment Manufacturer (OEM) approved vendors, or commercial inventories approved by the USAF and/or OEM.

All remanufactured sensors delivered will meet the inspection criteria. All remanufactured components shall comply with the latest revision of all OEM’s build book for P/N 8901-277, along with any outstanding FAA Airworthiness Directives.

All detailed parts or components required to accomplish the remanufacture of the F 110- 100 FDT Sensors shall be contractor furnished. Contractor may retain condemned units for spare parts and may move components among serviceable end items to expedite the remanufacturing process. The OEM must report condemnations or scrapped units, even if component parts are used to remanufacture another end item. Serial number integrity must be maintained.

The Contractor shall conduct all testing IAW the OEM’s production Performance Acceptance Test (PAT) procedures. The Government reserves the right to witness any and/or all tests conducted by the Contractor and/or subcontractors on a noninterference basis.

1.7.5. Deliverables Quality:

The Contractor shall ensure that materials, parts, and accessories used in remanufactured components are restored to original life expectancy or nearly so.

1.7.6 Designated Engineering Representative (DER) processes and procedures:

The Contractor shall obtain written approval from the PCO for all DER manufacturing processes and procedures (email is acceptable), prior to using those DER manufacturing processes and procedures in the remanufacture of Fl10-100, F118-100 FDT Sensors or component parts.

1.8 Packaging and Handling:

The Contractor shall be responsible for the preservation and packaging of the delivered F110- 100, F118-100 FDT Sensors IAW the Special Packaging Instructions specified on AFMC Form 158, Packaging Requirements. The Contractor shall place a serviceable tag, Department of Defense (DD) Form 1574, inside the package along with the assembly as well as outside the package. In addition, all marking and labeling of unit and shipping containers shall be in accordance with Mil-Std-129P, Department of Defense Standard Practice, Military Marking for Shipment and Storage.

1.9 Shipping and Transportation:

Contractor shall meet the delivery schedule. Contractor shall ship or transport applicable deliverables as appropriate in order to have the deliverables available to support the customer’s operational requirements and in accordance with the contract’s delivery schedule. Contractor shall not destroy reusable shipping containers and will reuse them for return shipment.

1.10 Document Storage:

All records and reports outlined in this SOW shall be prepared for each part and a copy kept on file by the contractor for five (5) years.

SECTION II

2.0 Reference & Technical Manuals:

In execution of this SOW, the Contractor shall apply manufacturing processes, tools, and products as prescribed in FAR 22.1003-6(a)(1)(iv) and OEM build book indicating applicable OEM Part Numbers, applicable OEM technical repair procedures, and manufacturing specifications. The production output should meet or exceed the United States Air Force (USAF) build requirements found in F110-GE-100: 5E6-3-112-3. All remanufactured sensors must meet the inspection criteria.

SECTION III

3.1 Requirements:

3.1 Government Furnished Material (GFM):

None. Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnished Material will not be provided.

Contractor furnished material used for replacement components shall be parts specified in ESM CFM56-2B Engine Shop Manual. Any deviations shall have written approval from Propulsion Engineering, AFLCMC/LPSBAA and AFLCMC/LPSBAB through the PCO.

3.2 Government Furnished Property (GFP):

GFP shipped to the contractor ceases to be GFP at the point identified in FAR 22.1003- 6(a)(1)(v), except as specified in SOW Section 1.6.

APPENDIX A

ACRONYMS

AF Air Force AFMC Air Force Materiel Command CAV AF Commercial Asset Visibility Air Force CDRL Contract Data Requirements List CMM Commercial Maintenance Manual DD Department of Defense DCMA Defense Contract Management Agency DR Deficiency Report FAR Federal Acquisition Regulation IAW In Accordance With ISO International Standards Organization NSN National Stock Number OC-ALC Oklahoma City Air Logistics Center PCO Procurement Contracting Officer PCARSS Plant Clearance Automated Reutilization Screening System P/N Part Number PMS Production Management Specialist SB Service Bulletin SDR Supply Discrepancy Report SOW Statement of Work SP Surveillance Plan SS Service Summary TAFB Tinker Air Force Base USAF United States Air Force

ATTCH 1

CAVAF CFM

REPORTING REQUIREMENTS

The purpose of this attachment is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the Commercial Asset Visibility Air Force (CAVAF) system. CAVAF shall be the primary system of record for providing daily status of all Government owned assets located at contractor repair facilities. Reporting within CAV AF shall not be limited to end items subject to repair but are to include assets stored at a contractor Inventory Control Point (ICP). Any CAVAF system down-time will be identified on the CAVAF home page banner. Contractors are responsible for ensuring current User Guides are utilized by their CAVAF reporters. NOTE: Contractor User’s Guide may be accessed from the CAVAF Homepage.

CAVAF FAMILIARIZATION TRAINING:

1. Familiarization training for CAVAF reporting will be requested by the contractor via the applicable ICP CAVAF system administrator (SA). For assistance, guidance or questions to specific contract transactional reporting requirements may be addressed to the CAV AF contract monitor (CM). ICP CAVAF (SA and/or CM) points of contact (See Contractor Responsibility Item #4).

CONTRACTOR RESPONSIBILITY:

1. Contractor CAVAF reporting requirements shall be accomplished daily and/or within one (1) business day of a maintenance action occurrence IAW the applicable CAVAF CDRL and CAVAF system, version

8.0.1 or higher. Accurate and timely reporting of maintenance transactions into CAVAF is critical to the management of repair requirements and the management of world-wide asset distribution.

Contractor shall ensure asset record in CAVAF is an accurate reflection of physical assets on hand at all times.

2. Each CAVAF reporter shall submit a completed System Authorization Access Request, DD Form 2875, per instructions within 10 days after contract award date. All DD Form 2875(s) shall be digitally signed.

There “must be two CAVAF reporters” for the contractual reporting requirements to ensure there is no possibility of a lapse in reporting coverage.

3. User(s) shall complete initial DoD Information Assurance (IA) Cyber Awareness Challenge training and submit a course completion certificate with the DD Form 2875. IA Cyber Awareness Challenge course completion certification shall be accomplished annually. Users shall access IA training on the Cyber Awareness Challenge website, under the Department of Defense Employees section, click hyperlink;

“Launch New Cyber Awareness Challenge Department of Defense Version” using the following website:

http://iase.disa.eta/cyberchallenge/launchPage.htm

a. First time CAV AF users will email initial IA Cyber Awareness Challenge course completion certificates, AF Form 4394, AF User Agreement Statement, and completed DD Form 2875 to point of contact at applicable ICP (see item #4).

http://iase.disa.eta/cyberchallenge/launchPage.htm

b. All following annual course completion certificates shall be completed before lapse in certification occurs and will be emailed to respective ICP identified in paragraph 4a, 4b, and 4c below.

c. Product Functionality Caution: To meet technical functionality requirements, this awareness product was developed to function with Windows operating systems (Window 7, VISTA, and XP), when configured correctly) using either the Internet Explorer (IE) or Firefox browsers. Users employing either OS or browser may experience difficulties and may not be able to complete the training or print the certificate of completion. They Cyber Awareness Challenge course completion is a contractual requirement, and the contractor must comply.

4. Reporters requiring the default password or password resets should contact their applicable ICP CAV AF System Administrator POC listed below:

a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to:

406scms.cav.af.ar@us.af.mil

b. Hill AFB, UT, call (801) 586-3736, or send email request to:

420scms.cdm@us.af.mil

c. Tinker AFB, OK, call (405) 739-3229, or send email request to:

420.scms.tinker.cdm.workflow@us.af.mil

5. To access the CAVAF system, contractor and subcontractor reporters shall follow “initial log-in procedures” as prescribed within the Contractors User’s Guide.

6. Contractor shall ensure accountability of all Government Furnished Property (GFP) within their Enterprise Resource Planning (ERP) or Commercial Off-the-Shelf (COTS) system, which must be reported accurately for same GFP records within CAVAF at all times.

7. Contractual Induction-at-Risk of end items is prohibited on all repair contracts.

8. Contract/Delivery Order Closure Disposition– Government will provide disposition instructions to contractor’s reporter. Contractor shall begin shipping assets within 10 days of receiving government disposition instructions and have completed all shipping actions 30 days thereafter. Contractor shall be fully responsible to ensure all corresponding CAVAF reporting actions associated with disposition occur within one (1) business day of related shipment action.

9. All NSNs identified as Nuclear Weapon Related Materiel (NWRM) shall require contractor CAVAF reporting for production management, to track and report NWRM end items in repair with Serial Number identification within one (1) business day for asset visibility and serial number tracking. When receipted, Contractor’s reporter shall capture each NWRM asset’s Serial Number when reparable is received.

Contractors shall follow all NWRM management requirements outlined in AFI 20-110, NWRM Management, to include, but not limited to packaging, marking, labeling, storage, transportation and receipt of all NWRM assets, with emphasis on Positive Inventory Control (PIC) and records management by the contractor and government to assure compliance. The successful application of these procedures requires the full cooperation of all personnel associated with the storage, shipping, transshipping and receiving of all NWRM assets.

mailto:420scms.cdm@us.af.mil mailto:420.scms.tinker.cdm.workflow@us.af.mil

SPECIFIC CAVAF CONTRACTOR TRANSACTIONAL REPORTING REQUIREMENTS:

1. “Not-on-Contract” (NOC) receipt transactions apply to assets which are associated to a contractor facility DoDAAC and not an active contract delivery order. Regardless of asset condition code status, Not-on-contract shall be used for the following reporting actions:

a. Discrepancy Items – Are identified as misrouted shipments, misidentified shipments, or damaged end items. Contractor’s reporter will verify resolution weekly to acquire resolution to discrepancy within 30-days of receipt transaction. The contractor shall comply with disposition instructions provided by the Government within 10-days and complete all associated reporting actions within same period. Contractor reporting actions shall be resolved using reversals of individual record control document numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.

b. Inventory Control Point Items – are identified as assets stored at contractor facility and are not repair end items or discrepancies items. Movement of assets from “Not-on-Contract” category shall be resolved using reversals of individual record control document numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.

NOTE: Contractor is responsible for all “Not-on-Contract” assets ensuring physical asset balances are reflected and CAV AF reporting actions occur within one (1) business day of occurrence.

2. CAVAF receipt or reporting actions will not be utilized for quality deficiency report (QDR) items, as there is a separate process and tracking mechanism for them.

3. All Contract Line Item Number (CLIN) repairable assets shall be receipted in CAVAF under Receipt Type: On Contract (F). CAVAF generates an RCDN for each unit receipted and allows the reporter to assign a reference or serialization number for tracking purposes. Where no reference or serialization numbers are utilized, the oldest RCDNs (listed first) shall always be processed first. Any reversal actions shall be accomplished using the last RCDNs processed and no reversal actions shall occur without concurrence from the Production Management Specialist managing the contract.

4. The “Complete Date” entered into CAVAF cannot be dated prior to the DD250 date entered in the same screen. Contractor will validate that the DD250 shipment number and date entered into CAVAF are accurate. This requirement is also applicable to Condition Code H (Condemned) only when specifically directed by the contract.

5. Proper usage of DD Form 1348-1A, Issue Release/Receipt Document in relation to CAVAF reporting requirements.

a. Receipt Actions: Contractor’s reporter will use government issued shipment document numbers for CAVAF end item receipt transaction reporting only in the absence of missing DD Form 1348-1A or shipment document number. Contractors are not authorized to generate pseudo shipment document numbers for receipt transactions because this creates disconnects in shipment tracking within government inventory systems. NOTE: If the DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management Specialist (PMS), who will acquire government issued shipment document number from the Inventory Management Specialist

(IMS).

b. Shipping Actions: DD Form 1348-1A shall be used as the shipping document for shipment transactions of all end items. A DD Form 1348-1A is also applicable to all Consolidated Serviceable Inventory/Consolidated Reparable Inventory (CSI/CRI) assets regardless of tracking or reporting purposes. A Material Inspection and Receiving Report, DD Form 250 or Requisition and Invoice/Shipping Document, DD Form 1149 are not authorized as a shipment document, and shall not accompany any material shipments on repair contracts.

CAVAF provides a DD Form 1348-1A in a Portable Document Format (PDF). DD Form 1348-1A shipping documents will be prepared for each NSN shipment from contractor’s facility, regardless of destination. The entire form, complete with bar coding, will be printed on a laser printer as specified under technical considerations. It is recommended the PDF be saved at the contractor’s facility prior to printing. The Contractor shall print three copies as required for shipping. Place one copy on the outside of the shipment container, one copy inside the shipment container, and retain the third copy for the contractor’s records. For end item shipments the DD Form 1348-1A shipment document number shall be comprised as one of the following actions:

i.Back to Depot Shipments:

(1) For a “single” unit NSN shipment, the default shipment document number will be the CAV AF record control document number (RCDN) of item being shipped.

(2) For “multiple” quantity shipments, it is recommended the CAV AF RCDN of the lead item of the shipment be used as the shipment document number.

ii. Amended Shipping Instructions (ASI): Are used to divert material that is due-in from a contractor to a requisitioner. Government disposition instructions will provide a shipment document number to the contractor to be utilized for CAV AF shipment transaction reporting and the DD Form 1348-1A.

c. In the event CAVAF system is inoperable or is on a scheduled downtime:

i. The DD Form 1348-1A shall be manually completed and generated (printed) by contractor, using the AFPUBS website.

ii. When CAVAF is again operational, the contractor shall resume with transactional reporting actions in a timely and accurate manner, including completing a DD Form 1348-1A (printing not required if manual DD1348-1A PDF file utilized) and the shipment process in CAV AF.

6. Upon contract expiration and/or becoming production complete, the contractor will complete a 100% physical inventory inspection. Any assets remaining at the facility within 30-days must be noted in an email request to the contracting officer (CO) and PMS for disposition instructions by the government. If none is provided, assets are to be returned to the depot and reported within CAVAF, shipping to the following addresses according to each national stock number (NSN) inventory management location by source of supply (SOS) code:

a. FHZ – Tinker AFB, the ship for disposition address to SW3211:

TYPE/CODE: A SW3211

DEF DISTRIBUTION DEPOT OF OKLAHOMA

CEN REC 3301 F AVE

BLDG 506, DR 22

TINKER AFB, OK, 73145-8000

b. FGZ – Ogden AFB, the ship for disposition address to SW3210:

TYPE/CODE: A SW3210

DLA DISTRIBUTION DEPOT HILL

7537 WARDLEIGH RD

BLDG 849W

HILL AFB, UT 84056-5734

c. FLZ – Robins AFB, the ship for disposition address to SW3119:

TYPE/CODE: A SW3119

DLA DISTRIBUTION WARNER ROBINS

455 BYRON STREET

BLDG 376

ROBINS AFB, GA 31098-1887

7. Systemic data problems created by contractor’s failure to report data accurately or in a timely manner are subject to immediate Program Management Review (PMR). Examples of documented system data problems include but are not limited to:

a. Timely reporting means compliance with 24 hour requirement for all contractor CAVAF reporting of maintenance transactions. Actual date information is required for all reporting actions. Contractor’s are not authorized to report all receipt, induction, complete and ship transactions the same day to ‘catch-up’ due to periodic reporting. This affects government inventory management systems and balances creating D035 Stock Control Supply System (SCSS) controlled exceptions (associated with same day reporting issue).

b. Contractors not using government issued DD Form 1348-1A document numbers on

CAVAF contractor reporting on end item receipt transactions. This creates a data variance disconnect with government inventory D035 Stock Control System (SCS). Contractors are required to use DD Form 1348-1A document numbers for end item receipt transactions.

NOTE: If the DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management Specialist (PMS) and acquire government issued shipment document number from Inventory Management Specialist (IMS).

c. Overages and shortages, for items which are part of this contract shall be reported by the contractor into CAVAF as received “On-Contract” with actual quantities received. Any items which are not part of this contract shall be receipted as “Not-on-Contract”, which represents misdirected or misidentified assets.

8. RCDNs are systemically generated in CAVAF and should not be duplicated or fabricated with a suffix for shipment document numbers. RCDN is comprised of the CAVAF Contractors DoDAAC, the Julian date the RCDN was produced, and a four digit serial number (begins with 0001 each day). This affects government inventory management systems D035 SCSS controlled exceptions.

DISCREPANCIES INCIDENT TO SHIPMENT:

1. There are transportation and item discrepancies, each having different reporting requirements. Detailed information for each report is in the pertinent service publications.

2. Discrepancies incident to shipment include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition. These discrepancies shall be reported and resolved using the DoD web-based application WebSDR link is https://www2.transactionservices.dla.mil/websdr/home.asp This system of reporting a Supply Discrepancy Report (SDR), formerly called Report of Discrepancy (ROD), has been developed in compliance with DoD regulations 4140.1-Vol 6 and DLM 4000.25, Vol 2, Ch 17 which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access to the AF WebSDR, continued use of manual forms is permitted. A copy of the form will be forwarded through the CAO and Quality Assurance (QA) activity for corrective action.

3. Transportation discrepancies and item transaction discrepancies shall be coordinated with the DCMA Property Administrator and Administrative Contracting Officer (ACO) immediately upon discovery for corrective action in addition to AF WebSDR submittal.

4. Contract line items received with missing components (Missing on Induction, (MOI)) the contractor shall process a SDR (SF Form 364) immediately upon discovery in accordance with AFJMAN 23-215 and provide a copy of submitted MOI SDR form to the ACO within 2 days of discovery.

5. All misdirected shipments of GFP shall be reported to the Production Management Specialist (PMS) via email notification within three workdays. The PMS will consult with issue appropriate disposition instructions for the misdirected items.

6. Overages, shortages, and misidentified items which are part of this contract and received by the contractor shall be reported into CAVAF with the actual received quantity and with the correct NSN. An SDR shall be processed in accordance with standard procedures identified above for these overages, shortages, and misidentified items.

CONTRACTOR COMMUNICATIONS NETWORK (CCN)

GENERAL INFORMATION:

2. Initial CAVAF training will be provided by the contracting ICP. Any follow up training will be the responsibility of the contractor. Training request and/or questions on CAVAF, please contact CAVAF System Administrators (SA) for contracts issued by respective ICP, from one of the following areas:

a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to:

406scms.cav.af.ar@us.af.mil https://www2.transactionservices.dla.mil/websdr/home.asp

b. Hill AFB, UT, call (801) 586-3736, or send email request to:

c. 420scms.cdm@us.af.mil

d. Tinker AFB, OK, call (405) 739-3229, or send email request to:

420.scms.tinker.cdm.workflow@us.af.mil

i. Tinker AFB, OK, Contractor furnished material (CFM) contracts call;

(405) 736-7171 or (405) 736-2046

ii. Tinker AFB, OK, Government furnished material (GFM) contracts call:

(405) 739-7329 or (405) 736-7362

NOTE: CAVAF Contractor’s User’s Guide can be accessed via CAVAF main menu at bottom of screen.

mailto:420.scms.tinker.cdm.workflow@us.af.mil

ATTCH 2

SURGE STATEMENT

1.14.1. In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or national emergency (also known as surge, reference DFARS 217.208-70 and DFARS 252.217-7001) and invokes surge: The contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. The contractor is required to provide the Government a surge plan. A CDRL and DID are associated with the surge requirement. After being notified of the surge demand in writing, the contractor may see additional orders and/or will see the priority status elevated on current orders. The contractor may do one or more of the following to fill the demand:

1.14.2. The contractor will maintain level of safety stock of components to draw from to perform additional repairs.

1.14.3. Add additional shifts to increase production within the contractor and with suppliers.

1.14.4. The contractor will work with the various manufacturing sites and their supply chain to expedite production. The contractor will be notified in advance of and be given the opportunity to negotiate; any expedite charges that might apply at the time of surge.

Contractual requirements for production of this contract are addressed in Part I. The schedule and surge requirements will be on a best-effort basis.

1.14.5. Surge plans have four basic phases (assessment, execution, sustainment, and exit/termination) and the plan associated with the surged items requested need to address those phases. The Government will provide, in writing, the items on contract that are requested to be surged. That will include the item, the quantity, and timeline with respect to delivery schedule with estimated termination dates when known.

1.14.6. contractors will provide a plan that includes the identified surge items, how they are going to meet the requirement, timeline to implement the plan, ability to sustain the surge through termination, identify any limiting factors or supply chain risks that will impact current surge production and future requirements for identified items.

ATTCH 3

Supply Chain Risk Management

(SCRM)

Required Performance Work Statement (PWS)/Statement of Work (SOW) Language

Supply Chain Risk Management

The contractor shall identify, assess, plan for, and mitigate actual or potential threats, vulnerabilities, and disruptions to the Air Force's supply chain throughout the lifecycle to ensure mission effectiveness. The contractor shall inform and include the Government in any mitigations or alterations to the program. The SCRM plan shall address the broad spectrum of supply chain risks that have the potential to: jeopardize the integrity of products, services, people, and technologies; compromise intellectual property; disrupt the flow of product, materiel, information, and finances needed for continued Air Force operations; and drive materiel cost increases to the program. The contractor shall develop and execute processes for identifying supply chain risks as early as possible; the persistent and comprehensive tracking, monitoring, and re-evaluation of supply chain risks and their corresponding mitigation actions; and communicating supply chain risks to affected stakeholders and the Government. The contractor shall notify in writing the identified actual and potential supply chain risks. The contractor's SCRM program and processes shall apply to the prime and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain, from raw material stage to delivery of a finished product and/or service. As part of the overall SCRM approach, the Contractor shall establish, document, and maintain documentation about subcontractors/vendors for all parts that will be used for Government contracts. The contractor shall continuously monitor their sources of supply for unknown, unauthorized, non-certified, or unqualified sources providing parts or services from any sub-tier supplier within the contractor's supply chain. The contractor shall investigate and submit findings to include root causes, impacts and a corrective action.

Continuity of Operations (COOP) Contractor shall include a SCRM plan detailing the offeror's supply chain risk management approach, providing specific emphasis on the risks associated with a.) Continuity of Operations b.)

Foreign Influence and c.) Cybersecurity. The contractor shall detail the specific supply chain risk (listed below) and provide a management and mitigation plan identifying how the offeror will ensure Supply Chain Risk Management is effective over the life of the contract.

The contractor will develop and/or update a Continuity of Operations Plan (COOP), also known as a Business Operations Plan, which outlines the processes and actions to prepare for, and respond to, unplanned natural and man-made disruptions to mission essential operations and provide that to the U.S. Government. The COOP will address disruptions caused by:

a) natural causes possible in the local vicinity (winter weather, earthquakes, hurricanes, fires, flooding, wind, pandemics, etc.) and

b) man-made causes (cyber-attacks, electrical outages, strikes affecting workforce, civil unrest, modes of transportation, and receiving/shipping goods, etc.).

The plan will explain:

a) how work will continue in the same or alternate facility(ies),

b) ability to use and/or augment the current workforce,

c) ability to repair/restore key infrastructure (machinery, computers, logistics etc.),

d) how to communicate with and inform the US Government and others in the supply chain.

Contractor shall provide essential records management for personnel working on U.S. government contracts. Records will be accessible to key members of the organization. Contractor shall ensure continuous records management support (training, etc.) despite any changes in personnel.

If applicable the contractor shall prepare for the continuation of essential DoD services during crisis IAW DFARS 252.237-7023, DFARS 252.237-7024, and other applicable references as necessary. In a state of emergency, if the Government deems necessary, the contractor shall provide all services necessary to ensure mission accomplishment. On occasion, services may be required to support an activation, or exercise of contingency plans outside normal duty hours.

Foreign Influence The contractor shall disclose any Foreign Ownership, Control or Influence (FOCI) for the purpose of initial or continued facility clearance eligibility. A Standard Form 328 Certificate Pertaining to Foreign Interest shall be submitted to the Government cognizant security office specified in each

DD254.

The contractor shall provide information regarding FOCI. If the contract requires access to classified information, DD254, Contract Security Classification Specification, shall be required.

Contractor shall provide an update on its financial health and potential FOCI when a merger or acquisition occurs.

Foreign contractor participation is excluded at the prime and subcontractor level, unless authorized through a current approved National Interest Determination (NID). It is solely the responsibility of the contractor to obtain necessary certification from the U.S. Department of State and to comply with the federal laws and regulations. Question must be directed to the U. S. Department of State’s Directive of Defense Trade Controls.

Subcontract Management. The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations.

Contractors may add subcontractors to their team only after notification to the Procuring Contracting Officer (PCO) and Contracting Officer Representative (COR).

Foreign Disclosure: Include ONE of the following statements in your PWS:

"Foreign Disclosure Restrictions apply."

- OR -

"Foreign Disclosure Restrictions do not apply."

Cybersecurity The contractor shall develop and implement a cybersecurity protection of supply chain information plan and provide a copy to the U. S. Government. The contractor shall conduct early and continuous monitoring throughout the contract to prevent or reduce impacts of cyber vulnerabilities where adversaries are able to exploit, steal, alter, manipulate, interrupt, or destroy system functionality, information, or technology. The contractor's plan shall: a) make specific reference to those aspects of the National Institute of Standards and Technology Special Publication (NIST SP) 800-161, “Supply Chain Risk Management Practices for Federal Information Systems and

Organizations” that represent the contractor's implemented processes and practices; b) include a description of how the contractor shall protect the supply chain from exploitation due to the insertion of counterfeits/malware, unauthorized production, tampering, theft, insertion of malicious software and hardware, functionality alteration, and any other elements that would allow adversaries to gain unauthorized access to data, alter data, interrupt communications, or otherwise disrupt operations; c) inform the U. S. Government of any instances of unauthorized access and/or compromise, such as those listed in item “b” to contractor’s digital information and parts and components and d) make specific reference to those aspects of NIST SP 800-53 that represent the processes and practices the contractor will implement. The plan and processes shall apply to the prime and their suppliers, subcontractors, associated integrators, and vendors, spanning the entirety of the supply chain, from raw material stage to delivery of a finished product.

The Contractor and any subcontractors shall provide to the government a system security plan (or extract thereof) and any associated plans of action developed to satisfy the adequate security requirements of DFARS 252.204-7012, and in accordance with NIST Special Publication (SP) 800-171, “Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations” in effect at the time the solicitation is issued or as authorized by the contracting officer, to describe the contractor’s unclassified information system(s)/network(s) where covered defense information associated with the execution and performance of this contract is processed, is stored, or transmits. The contractor shall {develop, update} an incident-handling capability plan that utilizes guidance provided in NIST SP 800-61 revision 2, Computer Security Incident Handling Guide, consisting of 1) incident response policy and plan, 2) procedures for performing incident handling and reporting, 3) guidelines for communicating with outside parties regarding incidents, 4) incident team structure and staffing model, 5) relationships and lines of communication between the incident response team and other groups, both internal and external, 6) services the incident response team should provide, and 7) staffing and training the incident response team. Any incident reported to Defense Industrial Base Cybersecurity Program (https:\\dibnet.dod.mil) shall also be reported to the responsible contracting officer within __24_____ Business hours. {time period determined by acquisition team} Cybersecurity (electronic components - FSG 59, with the exception of those that do NOT contain any programmable components) If NOT an electronic component OR if an electronic component that does NOT have any programmable elements/functions, the following required language does not apply.

The contractor shall provide information to obtain a Defense Intelligence Agency – Threat Assessment Center (DIA-TAC) Report when National Critical Materials and Critical Components (CC) are known based on the Functional Thread Analysis. The contractor shall trace the Bill of Materials to the lowest critical components. The contractor shall update design via system engineering processes to ensure above-medium risk components are not in the system.

The contractor shall ensure all hardware, with special emphasis on lowest critical components (CCs) and components containing Critical Program Information (CPI), are from trusted sources and are manufactured by approved personnel as documented in the contractor Security Plan. The contractor shall develop a SCRM plan documented in the contractor Security Plan, in accordance with (IAW) the current version of Committee on National Security Systems Directive (CNSSD) No. 505 and NIST SP 800-161, to mitigate supply chain risk. The contractor shall ensure that no critical components procured are on the Section 806 (National Defense Authorization Act for FY 2011 (Public Law 111-383)) and Section 2339a (Title 10, United States Code) Lists in the Supplier Performance Risk System (SPRS) (CDRL 25, 27, 29). The contractor shall develop and implement a Counterfeit Parts Prevention Program in compliance with Defense Federal Regulation (DFAR) 252.246–7007 Contractor Counterfeit Electronic Part Detection and Avoidance System, using SAE AS5553, SAE AS6171, SAE AS6081, and Independent Distributors of Electronics Association (IDEA) Standard [IDEA-STD-1010B] or similar practices to prevent the inclusion of counterfeit parts or parts with malicious logic. The contractor shall perform acceptance testing on lowest CCs and components containing CPI in accordance with the Counterfeit Parts Prevention Program.

STATEMENT OF WORK (SOW) Fll0-100, F118-100 FDT Sensors
TABLE OF CONTENTS Page
1.0 WORK SCOPE:
1.1 SOW Updates:
1.2 Quality System and Quality Assurance Plan:
1.3 Subcontractor and Vendor Management:
1.4 Safety:
1.5 General Services and Material:
1.7 Receiving:
1.7.1 Condemnation of Assets:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .