SOW Fabric Repair B10206 Sep_Redacted.pdf
PDF 180 KB Posted
- Attached to
- Seamans Fabric for C-130 Temporary Structure 1026 Repair Federal contract opportunity
- Solicitation number
- FA822422Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA822422Q0001_Redacted.pdf | ||
| 06 BNJA-SSJA_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
REPAIR TO TEMPORARY STRUCTURE 10206
HILL AIR FORCE BASE, UTAH
309TH AIRCRAFT MAINTENANCE GROUP (309 AMXG)
July 2021
1.0 General Requirements
1.1 The Contractor shall provide all labor, equipment, testing, transportation, and supervision to accomplish the following:
1.1.1 The Contractor is responsible for all sub-contractors.
1.1.2 The Contractor shall conform to all safety requirements or activities related to the accomplishment of the work performed and protect/safe guard government assets/property during the period of time the property in under control or possession of the offeror.
1.1.3 The Contractor shall clean up the work area at the end of each work shift and the entire project area prior to final inspections and properly dispose of all materials off base. The Contractor shall not use government waste containers and/or dumpsters. Contractor shall provide their own containers/dumpster for debris.
1.1.4 The Contractor shall comply with all safety/fire requirements provided by the Hill Air Force Base Fire Department (FD) with any welding torch or arc, grinding and/or cutting to remove existing pipe/valves and installation of new piping and valves. Burn permits are required by the Hill Air Force Base Fire Department (FD) and the Contractor and/or sub-contractor(s) must attend a burn permit class provided by the FD. The class is held the first Thursday of every month at Building 23, with start time of 8:00 a.m. Upon completion of required burn permit course, Contractor will receive a fire safety packet with “Notice to Proceed Paperwork”. Contact for course enrollment.
1.1.5 The Contractor shall record and report promptly (within one hour) to the CO or
PM, all available facts relating to each instance of damage to government property or injury to either Contractor or government personnel.
1.1.6 In the event of an accident/mishap, the Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.
1.1.7 If the government elects to conduct an investigation of the accident/mishap, the
Contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
1.1.8 The Contractor shall notify the PM of any environmental spills, prior to reporting the incident to the Hill AFB Fire Dept. at 911. If the Contractor spills or releases any substance as contained in 40 Code of Federal Regulations 302 into the environment, the liability for the spill or release of such substances rests solely with the Contractor and its agent to remediate the area as required, at no additional cost to the government.
1.1.9 Contractor shall complete fabric replacement inside 90 days from award date.
1.1.10 The Contractor shall perform the service required during the business hours of 0600 – 1600 Monday – Thursday.
2.0 Repair Specifications:
2.1 Contractor shall remove and replace both entire lower sections of PVC/scrim coverings of temporary structure/building 10206, and remove and reinstall metallic tubes and framing which hold the coverings if necessary to make the repairs. Contractor is responsible for metal cutting, welding, measuring, patching, replacing or repairing of loose/broken/missing Tack Bolts of the structure that secure the fabric to the asphalt/concrete flooring and adhesion (Dielectric Weld Adhesion) of materials as required to make the replacement/repairs.
2.1.1 Measurements of complete removal and replacement required are located on the two (2) sides, both North and South side of building 10206. Dimensions are approximately One Hundred and Forty-Five Feet (145) Feet on each side of the building.
The replacement will be from Five (5) Feet in height to the ground for a rough total of Fourteen Hundred and Forty (1,450) Square Feet. (290 Feet in Length X 5 Feet in Height plus an additional ≈10% = 1,600 Square Feet)