SOW - ENID - BOOM SWAP - SUPPLY.docx
DOCX document 39 KB Posted
- Attached to
- ENID - SUPPLY - PUMPS & CONTROLLERS
- Solicitation number
- W912EE25Q0007
About this file
The document provided is a Performance Work Statement (PWS) for the conversion of a long-reach excavator boom to a standard boom on a CASE CX250D-LR excavator for the U.S. Army Corps of Engineers (USACE) Enid Lake Project in Enid Lake, Mississippi.
The PWS outlines the scope of work for the contractor, which includes providing all labor, tools, equipment, transportation, parts, materials, and other incidentals necessary to convert the excavator's boom. The contractor is required to pick up the excavator from the Enid Lake Project, transport it to their facility, complete the conversion, and return the excavator to the Enid Lake Project within 90 days of the award. The contractor must also deliver the old boom and arm parts back to the Enid Lake Project. The PWS includes delivery requirements, security guidelines, and inspection and acceptance procedures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement / Statement of Work For ENID LAKE PROJECT 264 County Rd 39 Enid Lake, MS 38927
SUPPLY – CONVERT LONG REACH TO STANDARD
Scope of Work. The contractor shall provide all labor, tools, equipment, transportation, parts, materials, and other incidentals necessary for converting long reach unit to standard unit boom on CASE CX250D-LR – NKS7M1352.
General Specifications:
The contractor shall provide all labor, tools, equipment, transportation, parts, materials, and other incidentals necessary to pick up from Enid Lake – transport to contractor – convert long boom to standard boom, stick/arm and all necessary lines/pipes, pins, bushings, shims, safety decals, install hydraulic filters, fill with hydraulic fluid and grease unit, test, and return to ENID Lake Project within 90 days of award to:
Corp Of Engineers Enid Lake Field Office 264 County Rd 39 Enid Lake, MS 38927:
DELIVERY:
The unit will be picked up from Enid Lake Project, transported to Lee Tractor and be delivered back to Enid Lake after conversion has been completed. The old parts (Boom & Arm) will be also delivered back to Enid Lake Project. Refer to Estimates QJ01165 & QJ01274.
Corp Of Engineers Enid Lake Field Office 264 County Rd 39 Enid Lake, MS 38927:
Freight FOB: Destination. Price includes delivery, off-loading at the designated location.
Arrangement of Delivery of Service will be made to Enid Lake Field Office at said address within 90 days upon award. The contractor shall use extreme caution around the building and work area to ensure utility lines or structures aren’t damaged. Contractor shall deliver all equipment in a professional manner based on product specifications to ensure structure is safe for employee utilization.
GUARANTEE
LIMITED WARRANTY AND WARRANTY DISCLAIMER for a period of one (1) year from date of delivery only that the material sold hereunder substantially complies with specifications.
ADDITIONAL UNKNOWN NEEDS:
Hours of Operation: The contractor shall DELIVER between the hours of 0700 and 1630 Monday through Thursday (except federally observed holidays) AND give verbal notification to the POC DAVID SPARKS 662-561-5441 no less than 48 hours prior to scheduled delivery. During the process of service - the site will be kept clean of debris and trash.
Refuse Removal: Inspection and Acceptance of completed service will be done by the P.O.C. DAVID SPARKS – 662-561-5441
SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures, to include identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
Suspicious Activity Reporting training (e.g., iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award.
Note: When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
Non-U.S. Citizens working on Government Contracts: Government Approval MUST be obtained PRIOR to any non-U.S. Citizen being permitted to work on a government contract. The Contractor must submit a letter requesting approval via the Contracting Officer/Contracting Officer Representative to the Vicksburg District Security Officer. The letter must include the contract number, period of performance, location(s) of work performance and attach a copy of the individual’s passport and visa/work authorization documents.
Inspection and Acceptance: Price shall include delivery and acceptance at the location of ENID Lake Project Office : 264 County Rd 39 Enid Lake, MS 38927.
DELIVERY INFORMATION:
DELIVERY SHALL BE MADE WITHIN (90) DAYS OF RECEIPT OF PURCHASE ORDER.
Corp Of Engineers Enid Lake Field Office 264 County Rd 39 Enid Lake, MS 38927:
POC: DAVID SPARKS 662-561-5441 TO MAKE DELIVERY ARRANGEMENTS NO LESS THAN 48 HOURS PRIOR TO DELIVERY.
File details come from the government source that posted it. Updated .